Global Oil and Gas Movements — Project Constitution and Wave Plan
Updated: 2026-09-15
Status: current project method and research boundary
Evidence cutoff for the initial plan: 2026-09-15, America/New_York
Purpose
Build one inspectable system for answering four different questions without collapsing them:
- Structure: where fields, pipelines, terminals, refineries, chokepoints, storage and buyer markets sit.
- Movement: what moved, when, by which mode, in what quantity, according to which observation.
- Permission and control: who may sell, load, insure, finance, transport, receive or redirect the cargo.
- Execution: whether an announcement or agreement reached contract, capital, field work, production, lifting, payment, fiscal receipt and sustained operation.
Material scope
Core theatres
- Iran and the wider Middle East: Iran, Saudi Arabia, Iraq, Kuwait, UAE, Qatar, Oman and Bahrain; Hormuz; Kharg; Ras Tanura; Fujairah; Qatar LNG; the Saudi East-West line and Yanbu; Iraq's Gulf outlets; Red Sea exposure.
- Russia: Baltic, Black Sea, Arctic and Pacific export outlets; Druzhba and other pipeline exports; crude versus refined products; sanctions, price-cap, insurance and shadow-fleet questions; China, India, Türkiye and remaining European interfaces.
- Venezuela: NABEP/U.S. governance and offtake; Chevron, Eni, Repsol, Shell and PDVSA lanes; Orinoco and Lake Maracaibo; diluent imports; Caribbean storage/transshipment; U.S. Gulf Coast refining; controlled proceeds and Venezuelan fiscal receipt.
Balancers that become material when a core route breaks
United States, Canada, Brazil, Guyana, Norway, Kazakhstan/Azerbaijan, Libya, Nigeria, Angola and Algeria. Australia, the United States, Africa and other LNG suppliers belong in the gas-balancing lane. China, India, the EU/UK, Japan, South Korea and Singapore are buyer/refining/trading hubs, not a single destination bucket.
Chokepoints and bypasses
Hormuz; Bab el-Mandeb; Suez/SUMED; Cape of Good Hope; Turkish Straits; Danish Straits; Malacca/Singapore; Panama; and named pipeline/overland bypasses. A longer route, a pipeline route and a ship-to-ship workaround are distinct physical and cost objects.
Commodity separation
Never use oil as a sufficient cargo description when the source is more
specific. Preserve:
- crude oil by named grade where possible;
- condensate;
- natural-gas liquids and LPG;
- gasoline, diesel/gasoil, jet fuel, fuel oil and petrochemical feedstocks;
- pipeline natural gas;
- LNG;
- U.S. diluent or other blendstock moving *into* a producing country.
Oil and gas share geography and some commercial actors, but their plants, carriers, storage, contracts, units and substitution dynamics differ.
The clock model
Every record carries one state and one observation/effective clock. Required state vocabulary:
announced signed_or_granted authorized financed under_construction_or_rehabilitation established operating constrained disrupted produced nominated loaded in_transit discharged paid received sustained estimated alleged forecast target
Do not advance a record merely because a later date arrived. The public receipt for the next state must exist.
Evidence classes
| Class | Use |
|---|---|
A-OPERATIVE | Signed law/order/license, executed contract or concession, port/customs record, bill of lading, registry entry, award, filing or other object that changes a legal or operating state. |
B-OFFICIAL-REPORTING | Government, state-company, intergovernmental or operator report describing an occurred movement or measured aggregate. |
C-MODELED-ESTIMATE | EIA/IEA/IMF/customs or commercial estimate. Record method, reference period and revision risk. |
D-ENTITY-CLAIM | Company or government statement about its own plan, capacity, cost, reserves or performance without the underlying receipt. |
E-OBSERVED-SECONDARY | AIS, satellite, shipping-intelligence, press or analyst observation used for discovery or a bounded estimate. |
F-OFFICIAL-ALLEGATION | Sanctions, enforcement or security allegation not independently adjudicated cargo by cargo. |
GAP | The join or source object needed to move the claim is not public or not located. |
Primary source and direct movement observation are different properties.
An official forecast remains a forecast. A company contract statement may be
the best public evidence that a contract was signed, but not the contract text.
Non-conflations
- AIS position is not cargo identity, origin, volume, buyer, legal permission
or payment.
- A port call is not necessarily a loading or discharge.
- Chokepoint transit counts are not oil volume unless vessel type, cargo and
load assumptions are explicitly modeled.
- A sanctions license authorizes covered conduct; it does not prove a trade
occurred.
- An agreement is not financing, FID, drilling, repaired infrastructure,
production, lifting or receipt.
- Reserves, oil in place, productive capacity, current production and exports
are different measures.
- Crude production and refined-product availability are not interchangeable.
- Seller, state oil company, field operator, marketer, title owner, vessel
owner, beneficial owner, ISM manager, charterer, insurer, paying bank and final beneficiary may all differ.
- A blocked or sanctioned vessel state does not prove a particular cargo is
illicit; a clean vessel record does not prove the voyage is lawful.
- War-risk advice, physical attack, closure, constrained passage and normal
passage are distinct states.
Wave plan
Wave 0 — Constitution and source architecture — complete
- Fix the object model, evidence ladder, material theatres and clock rules.
- Reuse the Iraq five-chain model.
- Decide what can and cannot be inherited from the astrocartography globe.
- Establish the first route-edge schema and source hierarchy.
Wave 1 — Iran war and Middle East movement baseline — in progress
- Reconstruct the pre-war February baseline and the March–September shock.
- Separate Hormuz, East-West/Yanbu, Fujairah, Iraqi Gulf, Red Sea/Suez and STS workaround lanes.
- Add crude, products, LPG and LNG as separate series.
- Join IEA/IMF PortWatch observations, EIA estimates, MARAD/UKMTO risk states, state-company loadings and named infrastructure receipts.
Wave 2 — Venezuela execution — initial ledger complete; source recovery next
- Reconstruct the January marketing/payment deal and the August–September NABEP, Chevron, Eni and infrastructure agreements.
- Recover the underlying binational agreement, OSC equity instrument, State offtake contract, Venezuelan concession instruments, new hydrocarbons law, field list, reserve reports and payment-account rules if public.
- Track diluent in; production and blend out; terminal and tanker movement; controlled proceeds; tax/royalty receipt; U.S. Gulf Coast or other discharge; any SPR or military receipt.
Wave 3 — Russia and the sanctions/shadow-fleet system — initial matrix complete
- Separate crude from refinery/product disruption.
- Map Baltic, Black Sea, Arctic, Pacific and pipeline corridors.
- Join export terminal, customs/trade, owner/manager/flag/class/P&I, sanctions, price-cap and buyer records without treating AIS darkness as guilt.
Wave 4 — Global replacement barrels and buyer rewiring — initial matrix complete
- Test which Americas, Atlantic Basin, African and Caspian suppliers actually increased production, liftings and deliveries.
- Map refinery compatibility, voyage length, storage, freight, product yields and buyer substitution. A barrel is not a perfect substitute merely because it exists.
Wave 5 — Gas and LNG as its own network — initial matrix complete
- Qatar/UAE through Hormuz; U.S. Gulf Coast; Russia; Australia; Algeria, Nigeria and other Africa; Trinidad/Venezuela and East Mediterranean lanes.
- Preserve pipeline gas, liquefaction capacity, feedgas, loadings, vessel movements, regasification and downstream demand as separate objects.
Wave 6 — Map build — initial working globe complete; enrichment next
- Generate a factual research globe from governed CSV/JSON owners.
- Layer structural routes, dated disruptions, deal-execution states, sanctions and confidence.
- Add timeline playback and theatre/commodity filters only after source and clock fields survive real data.
- Validate the Workbench view locally. Chronicle landing and Observatory/app shipment require separate authorization and proof.
Wave 7 — Recurrence and comparison — initial method complete
- Establish a bounded refresh cadence only after the useful update sources and false-positive burden are known.
- Candidate returns include the next IEA OMR, OPEC+ meeting, MARAD advisory expiry/successor, deal filings, first field-level capital/FID receipt and first cargo/payment/offtake receipt.
- Discuss Chronicle watches or reminders with Katie before creating them.
- The initial fixed-date, expiry/successor, event-gate and source-gap method is
recorded in
RETURN_TRIGGER_AND_SOURCE_GAP_MATRIX_2026-09-15.md; no automation or Chronicle watch has been created.
Source hierarchy
- Signed laws, regulations, licenses, contracts/concessions and official filings.
- Port, pipeline, customs, state oil company, operator, registry, insurer and bank records.
- EIA, IEA, IMF PortWatch, OPEC/JODI and national statistical series.
- Commercial tanker/AIS/satellite estimates with method and access state.
- News and social material for discovery, never as silent cargo proof.
Completion test for a mapped edge
An edge may be drawn as established only when its endpoints, commodity,
direction, clock and source are explicit. Volume requires its own source and
unit. A colored current-state overlay requires a dated state receipt. A deal
target is visibly different from an observed flow.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.