Financial Rail Source and Return Ledger — 2025–2027
Source and claim ledger
| ID | Source/object | What it proves | What it does not prove | Disposition |
|---|---|---|---|---|
| R-01 | FSB G20 targets | 11 global cost/speed/access/transparency targets and clocks | jurisdiction compliance, operator change or target achievement | keep |
| R-02 | FSB 2025 consolidated report | policy completion, KPI method, weak global end-user transmission and bounded corridor cases | every corridor's legal finality or cause of KPI movement | promotion_review |
| R-03 | FSB 2026 implementation phase | jurisdiction/regional action-plan and public-private implementation architecture | binding plans, operator deployment or outcomes | watch_only |
| R-04 | CPMI 2026 ISO 20022 requirements | updated non-regulatory harmonisation requirements through end-2027 | adoption, clean data, settlement or outcome | watch_only |
| R-05 | CPMI 2025 survey brief | 82-jurisdiction implementation picture and first/last-mile dependency | committee rule, completed plan or target achievement | plotline_support_only |
| R-06 | Swift ISO 20022 cutover | production CBPR+ payment-instruction cutover | CPMI harmonisation, lower cost, straight-through use or final settlement | promotion_review |
| R-07 | FATF revised R.16 consultation | consultation-stage guidance, fraud/error and data implementation questions; end-2030 readiness clock | final guidance, domestic rule or live global control | watch_only |
| R-08 | CPMI FPS-link governance | governance and oversight considerations | operating link, transaction or measured result | plotline_support_only |
| R-09 | TIPS and June activation | final/irrevocable central-bank-money TIPS design and activated EUR/DKK/SEK capability | first disclosed cross-currency production volume or SLA result | promotion_review + return |
| R-10 | CPMI correspondent monitoring | correspondent banking remains central; public Swift quantitative review vintage | complete end-to-end current chain | gap |
| R-11 | CPMI PvP report | PvP risk reduction and adoption constraints | universal coverage or a specific payment's PvP finality | plotline_support_only |
| R-12 | FSB stablecoin implementation review | incomplete/inconsistent implementation and untested effectiveness | stablecoin approval or common G20 rail | negative_finding |
| P-01 | G7 2026 minerals declaration | non-binding Alliance, targets and finance/stockpile/traceability coordination | common treasury, funded project or delivery | plotline_support_only |
| P-02 | Canada C$6.4B package | mixed portfolio of offtakes, investments, partnerships and measures | one facility, one close, one draw or output | emergent_signal_hold |
| P-03 | joint MDB minerals statement | collaboration framework for diagnostics, preparation, co-finance, infrastructure and de-risking | project approval, borrower or draw | emergent_signal_hold |
| P-04 | World Bank/Japan RISE+ | $20M trust-fund facility and broader framework | named project financing or disbursement | emergent_signal_hold |
| P-05 | World Bank project-payment guarantee | guarantee/LC risk and liquidity mechanics | underlying payment, zero default risk or automatic project close | method_support |
| P-06 | Thacker Pass Q1 2026 filing | borrower, restricted accounts, two DOE advances and project-cost state | vendor ledger, payment message or settlement time | promotion_review |
| P-07 | MP transaction agreement and results | definitive multi-instrument constitution and reported cash/income states | cash settlement of every accrued support amount or 10X draw | promotion_review |
| P-08 | CoreWeave Q1 2026 and credit agreement | borrower, commitment/draw, agent, security, controlled accounts and waterfall | wire/finality record | promotion_review comparator |
| P-09 | Ford May 2026 filing | BlueOval advances, liens, obligor/guarantee change and repayment clock | complete spend/allocation or bank rail | promotion_review |
| P-10 | Rio Grande credit agreement | project-finance rulebook, controlled accounts and waterfall | aggregate construction-loan draw | promotion_review comparator |
| P-11 | EXIM Project Vault | board approval and maximum direct-loan amount | vehicle, execution, draw, inventory, title, custody or loss waterfall | emergent_signal_hold |
| P-12 | NIST/Commerce USA Rare Earth | final award and loan agreement | first cash, accounts, collateral, repayment or loss terms | emergent_signal_hold |
| P-13 | Mission 300 update | MDB program commitments/co-finance and reported connections | G20 causation or each project-level rail | promotion_review under MDB owner |
Deduplicated return board
The existing parent and component returns remain controlling for Asheville, October G20/FSB products, Swift/Sibos, DTC tokenization, Pontes, G7 minerals and Project Vault. This board adds only the cross-rail proof required at each return.
| Return | Timing | Activation test | Claim unlocked |
|---|---|---|---|
| FSB annual payment KPI and implementation report | October 2026 | new cost/speed/access/transparency data plus jurisdiction-plan state | updated transmission result, not automatic target achievement |
| OECD retail/remittance transparency product | by end-Q3 2026 if schedule holds; otherwise record delay | final issuer product and recommendations | final technical object, not law/operation |
| FATF R.16 final guidance | source-triggered after Aug. 21 close | final guidance publication and effective/version state | guidance completion, not domestic implementation |
| jurisdiction/regional action plans and FSB PSP/data review | early 2027 / source-triggered | named plan, responsible authorities, legal/operator actions and milestones | jurisdiction implementation state |
| G20/CPMI end-2027 test | 2027-12-31 | KPI results plus operator alignment evidence | target/alignment result, lane by lane |
| Nexus | late 2027 / source-triggered | legal scheme, participants, funding, first production transaction, finality and volume | operating interlink state |
| TIPS cross-currency use | source-triggered | first disclosed EUR/DKK/SEK production transaction or volume/SLA series | capability-to-operation conversion |
| correspondent-chain monitoring | source-triggered | new CPMI/operator dataset with current corridor/account-chain scope | refreshed concentration/access evidence |
| Project Vault | source-triggered | vehicle, executed loan, first draw, inventory, warehouse/title/custody, OEM contract and loss waterfall | operating reserve/project rail |
| USA Rare Earth | source-triggered | first incentive payment/loan draw, borrowing entity, security and repayment terms | disbursement state |
| MP Materials | quarterly; 10X target 2028 | price-support cash receipt versus accrual; 10X draw; qualified output/offtake | financing-to-revenue/output conversion |
| Thacker Pass | quarterly through 2028 | further DOE advances, restricted-account use, vendor spend, completion and Jan. 2029 repayment | draw-to-deployment-to-repayment chain |
| CoreWeave DDTL 4.0 | through 2027-06-30 availability | tranche draw, customer receipts, reserve/cash trap or recovery event | live waterfall evidence |
| Rio Grande Train 5 | notes through Oct. 2026; COD H1 2031 | loan draw, construction spend, term conversion and operating accounts | constitution-to-cash/operation conversion |
| BlueOval/Ford | quarterly; principal begins 2030-04-15 | post-restructure advances, allocation, production receipts and payments | successor-obligor performance |
| Mission 300 | through 2030 | named project borrower, instrument, disbursement, connection/service and loss record | project-level MDB rail/outcome |
End-state proof
No return closes merely because a planned date arrives. It closes when the competent source supplies the state-changing object. A new announcement without the object records a delay or continued hold.
Sources
Full saved reading
View cited sources (28)
These are the sources cited by this reading. Each source keeps its own date and scope.
- FSB G20 targets
- FSB 2025 consolidated report
- FSB 2026 implementation phase
- CPMI 2026 ISO 20022 requirements
- CPMI 2025 survey brief
- Swift ISO 20022 cutover
- FATF revised R.16 consultation
- CPMI FPS-link governance
- TIPS
- June activation
- CPMI correspondent monitoring
- CPMI PvP report
- FSB stablecoin implementation review
- G7 2026 minerals declaration
- Canada C$6.4B package
- joint MDB minerals statement
- World Bank/Japan RISE+
- World Bank project-payment guarantee
- Thacker Pass Q1 2026 filing
- MP transaction agreement
- results
- CoreWeave Q1 2026
- credit agreement
- Ford May 2026 filing
- Rio Grande credit agreement
- EXIM Project Vault
- NIST/Commerce USA Rare Earth
- Mission 300 update
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: Financial Rail Source and Return Ledger — 2025–2027
status: pending
artifact_role: source_ledger
opened: 2026-08-31
evidence_cutoff: 2026-08-31T12:08:12-04:00
vault_landings: []
---