BSC, FASAB, and NSB action joins, 2025-2026
{
"schema_version": "f250.hidden-control-surfaces.action-joins/v1",
"research_id": "wave-12-bsc-fasab-nsb-action-joins-2025-2026",
"title": "Wave 12 BSC, FASAB, and NSB action joins, 2025-2026",
"window": {
"start": "2025-01-01",
"end": "2026-09-28",
"evidence_cutoff": "2026-09-28T23:59:59-04:00"
},
"status": "current_through_cutoff_not_fully_reconciled",
"source_policy": "official_sources_only",
"scope": {
"bodies": [
{
"surface_id": "business-standards-council",
"name": "Business Standards Council"
},
{
"surface_id": "federal-accounting-standards-advisory-board",
"name": "Federal Accounting Standards Advisory Board"
},
{
"surface_id": "national-science-board",
"name": "National Science Board"
}
],
"test": "Trace exact in-window action objects through accountable response or approval, formal instrument and effective date, funding or procurement, operation, and effect without treating meetings or downstream outputs as action by themselves."
},
"method": [
"Separate identity and authority from action evidence.",
"Keep proposal, draft, comment, vote, approval, instrument, effective date, funding, operation, and effect as distinct clocks.",
"Require an official-source attribution or exact identifier before joining stages.",
"Stop custody at the last supported stage and preserve explicit bounded negatives."
],
"records": [
{
"join_id": "bsc-hcim-v6-community-review-2026",
"body_id": "business-standards-council",
"body_name": "Business Standards Council",
"identity_authority": {
"state": "verified",
"summary": "OMB M-19-16 established BSC as a cross-government working group of OMB-designated functional-area leads. Authoritative governance bodies retain governance of their standards, SSGB supplies escalation, and OMB is a separate final policy or approval stage.",
"sources": [
"https://www.whitehouse.gov/wp-content/uploads/2019/04/M-19-16.pdf",
"https://ussm.gsa.gov/governance/",
"https://ussm.gsa.gov/fibf/"
]
},
"action_object": {
"type": "community_review_draft_and_public_comment_docket",
"title": "Human Capital Information Model 6.0",
"identifier": "BSC-HCM-2025-0134",
"draft_date": "2025-12-12",
"public_comment_release_date": "2026-01-15",
"comments_due": "2026-02-06",
"state": "draft_and_public_comment_verified",
"summary": "OPM release notes identify HCIM 6.0 as a Community Review release. USSM released it for public comment on behalf of OPM under the exact docket identifier.",
"sources": [
"https://www.opm.gov/services-for-agencies/hr-line-of-business/human-capital-information-model-hcim/hcim-v60-release_notes.pdf",
"https://ussm.gsa.gov/public-comment-open-for-fy26-workforce-funding-data-standards/"
]
},
"accountable_response_or_approval": {
"actor": "Office of Personnel Management and Office of Management and Budget",
"date": null,
"state": "pending_omb_approval",
"instrument": null,
"summary": "OPM's current owner page labels HCIM 6.0, dated 2025-12-11, pending OMB approval. No final BSC vote or OMB approval instrument was located within the window.",
"sources": [
"https://www.opm.gov/agency-services/hr-governance/hr-line-of-business/human-capital-information-model-hcim/"
]
},
"formal_instrument": {
"type": null,
"identifier": null,
"issuance_date": null,
"effective_date": null,
"state": "not_established"
},
"funding_procurement": {
"state": "not_established",
"summary": "General statements that business standards can inform investment and acquisition do not prove a procurement, obligation, or migration attributable to HCIM 6.0."
},
"operation_effect": {
"state": "not_established",
"summary": "No official deployment, operating adoption, or measured effect attributable to the exact draft was located."
},
"custody_end": "The official chain ends at draft/public review with OPM's owner page still reporting pending OMB approval.",
"claim_limit": "Do not equate BSC/public review with final OMB approval, legal effect, acquisition, or operating implementation.",
"disposition": "drafts_and_public_comment_verified_final_approval_held"
},
{
"join_id": "bsc-ffm-fy2026-midyear-release-2026",
"body_id": "business-standards-council",
"body_name": "Business Standards Council",
"identity_authority": {
"state": "verified",
"summary": "BSC/public review is an intermediate stage in the FIBF process; Treasury is the financial-management standards lead and OMB remains a separate completion stage.",
"sources": [
"https://www.whitehouse.gov/wp-content/uploads/2019/04/M-19-16.pdf",
"https://ussm.gsa.gov/fibf/",
"https://tfx.treasury.gov/fm-standards"
]
},
"action_object": {
"type": "public_comment_docket",
"title": "FY 2026 financial-management business standards",
"identifier": "BSC-FFM-2026-0001",
"public_comment_release_date": "2026-01-15",
"comments_due": "2026-01-30",
"state": "draft_and_public_comment_verified",
"summary": "USSM released the financial-management standards for public comment under the exact docket identifier.",
"sources": [
"https://ussm.gsa.gov/public-comment-open-for-fy26-workforce-funding-data-standards/"
]
},
"accountable_response_or_approval": {
"actor": "Department of the Treasury, Bureau of the Fiscal Service",
"date": "2026-05-15",
"state": "downstream_release_verified_exact_docket_join_unproven",
"instrument": "FY 2026 Mid-Year Federal Financial Management Standards release",
"summary": "Treasury released revised standards and states that feedback from federal lines of business, agencies, and industry gathered through multiple comment periods was incorporated. The official sources reviewed do not name BSC-FFM-2026-0001 or provide a docket-to-change crosswalk.",
"sources": [
"https://tfx.treasury.gov/media/61501/download?inline=",
"https://tfx.treasury.gov/fm-standards/fmlob/ffm-updates",
"https://tfx.treasury.gov/fmqsmo/fmcf"
]
},
"formal_instrument": {
"type": "advance_standards_release",
"identifier": "FY 2026 Mid-Year Federal Financial Management Standards",
"issuance_date": "2026-05-15",
"effective_date": null,
"projected_effective_publication": "2026-11",
"state": "released_but_not_effective_within_window",
"sources": [
"https://tfx.treasury.gov/fmqsmo/fmcf"
]
},
"funding_procurement": {
"state": "not_established_for_exact_docket",
"summary": "The framework can be used as a marketplace evaluation and acquisition baseline, but no specific award, obligation, or migration was tied to the exact docket."
},
"operation_effect": {
"state": "not_established",
"summary": "The stated effective publication is November 2026, after the research cutoff; no operating adoption or measured effect is claimed."
},
"custody_end": "An in-window draft docket and later Treasury standards release are both verified, but the exact causal crosswalk is absent and the stated effective publication is outside the window.",
"claim_limit": "Do not attribute the Treasury release to the exact BSC docket without an official disposition or crosswalk, and do not infer procurement or implementation from a standards baseline.",
"disposition": "near_join_not_exactly_attributable"
},
{
"join_id": "fasab-tb-2025-1-government-land",
"body_id": "federal-accounting-standards-advisory-board",
"body_name": "Federal Accounting Standards Advisory Board",
"identity_authority": {
"state": "verified",
"summary": "FASAB develops federal accounting standards through sponsor-governed due process. Technical Bulletin 2025-1 appears in FASAB's official standards inventory.",
"sources": [
"https://fasab.gov/accounting-standards/"
]
},
"action_object": {
"type": "exposure_draft",
"title": "Clarification of Standards for Land",
"identifier": "proposed Technical Bulletin 2025-1",
"release_date": "2025-07-03",
"comments_due": "2025-07-18",
"state": "exposure_and_comment_period_verified",
"summary": "A February 2025 GAO auditor briefing surfaced nine implementation issues; the Board continued assessment in April and released the proposed bulletin in July.",
"sources": [
"https://files.fasab.gov/pdffiles/land_clarifications_tb_ed_nr_2025.pdf"
]
},
"accountable_response_or_approval": {
"actor": "Federal Accounting Standards Advisory Board",
"date": "2025-09-26",
"state": "final_issuance_verified",
"instrument": "Technical Bulletin 2025-1, Clarification of Standards for Land",
"summary": "FASAB issued the final Technical Bulletin after the exposure process.",
"sources": [
"https://files.fasab.gov/pdffiles/tech_bulletin_2025_1_nr.pdf",
"https://files.fasab.gov/pdffiles/handbook_tech_bulletin_2025_1.pdf"
]
},
"formal_instrument": {
"type": "technical_bulletin",
"identifier": "Technical Bulletin 2025-1",
"issuance_date": "2025-09-26",
"effective_date": "2025-09-26",
"state": "issued_and_effective",
"summary": "The Bulletin is effective upon issuance for reporting entities presenting general-purpose federal financial reports under federal GAAP.",
"sources": [
"https://files.fasab.gov/pdffiles/handbook_tech_bulletin_2025_1.pdf"
]
},
"funding_procurement": {
"state": "not_applicable_as_authorization",
"summary": "The pronouncement clarifies accounting application and does not authorize funding or procurement."
},
"operation_effect": {
"state": "formal_accounting_effect_verified_measured_result_not_established",
"summary": "The Bulletin clarifies land classification, submerged land, documentation, and permanent land-rights treatment. No official post-implementation assessment or audited outcome attributable to it was located by the cutoff."
},
"custody_end": "The formal pronouncement and effective date are verified; the record stops before measured post-implementation effect.",
"claim_limit": "Accounting requirements are not evidence of a particular agency's implementation quality, financial-statement adjustment, or audited outcome.",
"disposition": "exposure_to_final_pronouncement_effective"
},
{
"join_id": "fasab-sffas-65-embedded-leases-2026",
"body_id": "federal-accounting-standards-advisory-board",
"body_name": "Federal Accounting Standards Advisory Board",
"identity_authority": {
"state": "verified_with_in_window_governance_change",
"summary": "Effective 2026-04-06, the seven-member Board comprises Treasury and GAO sponsor representatives and five nonfederal members. For Statements, Treasury conducts the 90-day sponsor review in consultation with OMB; congressional review runs concurrently.",
"sources": [
"https://files.fasab.gov/pdffiles/mou_update_board_changes_nr_2026.pdf",
"https://fasab.gov/accounting-standards/"
]
},
"action_object": {
"type": "exposure_draft",
"title": "Embedded Leases: Practical Expedient",
"identifier": "pending SFFAS 65",
"pre_ballot_discussion_dates": [
"2026-04-29",
"2026-04-30"
],
"release_date": "2026-05-01",
"comments_due": "2026-07-30",
"comment_letters": 23,
"state": "exposure_comments_and_disposition_verified",
"summary": "FASAB exposed the proposal, received 23 comment letters, considered the responses, and changed the effective date before approval.",
"sources": [
"https://fasab.gov/projects/active-projects/leases/",
"https://files.fasab.gov/pdffiles/leases_practical_expedient_ED_2026.pdf",
"https://files.fasab.gov/pdffiles/SFFAS_65_pending_copy.pdf"
]
},
"accountable_response_or_approval": {
"actor": "Federal Accounting Standards Advisory Board",
"date": null,
"state": "all_board_members_approved_issuance_external_review_pending",
"instrument": "pending SFFAS 65",
"summary": "The pending copy states that all Board members approved issuance. It remained under 90-day GAO and Treasury sponsor review and concurrent congressional review at the cutoff.",
"sources": [
"https://files.fasab.gov/pdffiles/SFFAS_65_pending_copy.pdf"
]
},
"formal_instrument": {
"type": "statement_of_federal_financial_accounting_standards",
"identifier": "SFFAS 65",
"issuance_date": null,
"projected_issuance_date": "2026-12-04",
"effective_date": null,
"proposed_application": "reporting periods ending after 2026-09-30",
"state": "pending_sponsor_and_congressional_review",
"sources": [
"https://files.fasab.gov/pdffiles/SFFAS_65_pending_copy.pdf",
"https://fasab.gov/accounting-standards/"
]
},
"funding_procurement": {
"state": "not_applicable_as_authorization",
"summary": "The practical expedient concerns accounting for qualifying contracts; it does not authorize contracts, appropriations, awards, or deployment."
},
"operation_effect": {
"state": "not_yet_effective_by_cutoff",
"summary": "No implementation or measured effect is claimed because external review had not closed and the projected issuance date was after the cutoff."
},
"custody_end": "Custody ends after unanimous Board approval but before completion of sponsor and congressional review, final issuance, and operative application.",
"claim_limit": "Do not equate Board approval of a pending copy with final issuance or effective federal accounting requirements.",
"disposition": "board_approved_sponsor_and_congressional_review_pending"
},
{
"join_id": "nsb-ngf-operations-award-2025",
"body_id": "national-science-board",
"body_name": "National Science Board",
"identity_authority": {
"state": "verified",
"summary": "The NSF Act makes NSB and the Director components of the Foundation. NSB establishes NSF policy and approves major programs and awards, but the Grants and Agreements Officer executes and legally makes the award.",
"sources": [
"https://www.nsf.gov/nsb/about",
"https://www.nsf.gov/funding/opportunities/competition-management-operation-maintenance-national/506147/nsf23-623/solicitation"
]
},
"action_object": {
"type": "conditional_award_recommendation",
"title": "National Geophysical Facility operations and maintenance award",
"identifier": "NSB-2025-16",
"committee_vote_agenda_date": "2025-07-22",
"board_action_date": "2025-07-23",
"state": "conditional_recommendation_verified",
"summary": "The Awards and Facilities Committee agenda identified discussion and vote. The Board's Major Actions memorandum states that the Board passed NSB-2025-16 conditionally recommending the award; the public memorandum does not disclose the conditions.",
"sources": [
"https://www.nsf.gov/events/national-science-board-awards-facilities-af-teleconference-4",
"https://nsf-gov-resources.nsf.gov/files/Major%20Action%20Memo%20July%202025%20final.pdf"
]
},
"accountable_response_or_approval": {
"actor": "National Science Foundation Grants and Agreements Officer",
"date": "2025-09-17",
"state": "signed_cooperative_agreement_verified",
"instrument": "NSF award 2435260",
"awardee": "EarthScope Consortium Inc.",
"summary": "The official NSF Awards API records the cooperative agreement. The solicitation makes clear that only the Grants and Agreements Officer can make the award and that program discussions or recommendations do not commit NSF.",
"sources": [
"https://www.nsf.gov/funding/opportunities/competition-management-operation-maintenance-national/506147/nsf23-623/solicitation",
"https://api.nsf.gov/services/v1/awards.json?id=2435260"
]
},
"formal_instrument": {
"type": "cooperative_agreement",
"identifier": "2435260",
"issuance_date": "2025-09-17",
"effective_date": "2025-10-01",
"end_date": "2030-09-30",
"state": "awarded_and_started",
"sources": [
"https://api.nsf.gov/services/v1/awards.json?id=2435260"
]
},
"funding_procurement": {
"state": "award_and_obligations_verified",
"award_type": "cooperative_agreement",
"estimated_total_usd": 222665168,
"obligated_through_cutoff_usd": 59175664,
"obligations_by_fiscal_year_usd": {
"2025": 19500000,
"2026": 39675664
},
"summary": "The official award record supplies the estimated total and obligations. Annual increments remain subject to funds and performance.",
"sources": [
"https://api.nsf.gov/services/v1/awards.json?id=2435260",
"https://www.nsf.gov/funding/opportunities/competition-management-operation-maintenance-national/506147/nsf23-623/solicitation"
]
},
"operation_effect": {
"state": "operator_and_operation_verified_quantified_effect_not_established",
"operator": "EarthScope Consortium Inc.",
"summary": "NSF's current research-infrastructure page identifies EarthScope Consortium as the NGF operator and describes the facility as new as of summer 2025. The official sources describe capabilities and intended uses but do not quantify an outcome attributable to the recommendation and award.",
"sources": [
"https://www.nsf.gov/geo/research-infrastructure"
]
},
"custody_end": "The public record proves conditional Board recommendation, signed award, obligations, and current operation. It does not disclose the recommendation conditions or establish disbursement, completed performance, or quantified effect.",
"claim_limit": "Do not collapse recommendation into award, obligations into expenditures, or operating capability into measured scientific or public-safety effect.",
"disposition": "conditional_board_recommendation_to_signed_award_and_operation_verified"
}
],
"strongest_joins": [
{
"join_id": "fasab-tb-2025-1-government-land",
"reason": "Exact exposure draft, final pronouncement, issuance date, and in-window effective date are all verified."
},
{
"join_id": "nsb-ngf-operations-award-2025",
"reason": "Exact conditional Board recommendation, separate signed NSF award, obligation amounts, performance period, and operator are verified while actor boundaries are preserved."
}
],
"held_joins": [
{
"join_id": "fasab-sffas-65-embedded-leases-2026",
"hold": "All Board members approved issuance, but sponsor and congressional review remained open and projected issuance was after the cutoff."
},
{
"join_id": "bsc-hcim-v6-community-review-2026",
"hold": "Draft/public review is verified; OPM still labels the version pending OMB approval."
},
{
"join_id": "bsc-ffm-fy2026-midyear-release-2026",
"hold": "The later Treasury release is not officially crosswalked to the exact BSC docket and its stated effective publication is after the cutoff."
},
{
"join_id": "nsb-ngf-operations-award-2025",
"hold": "The completed award chain does not reveal the Board recommendation's conditions or prove quantified downstream effect."
}
],
"access_limits": [
{
"source_system": "Regulations.gov",
"scope": "BSC-HCM-2025-0134 and BSC-FFM-2026-0001 docket pages and attachments",
"limit": "Public page/download access returned restrictions during the sweep and the public API did not yield the docket material.",
"interpretation": "This is an access limit, not evidence that no comments, attachments, or disposition documents exist. The GSA/USSM notice independently verifies both draft objects and comment periods."
}
],
"aggregate": {
"bodies_examined": 3,
"action_records": 5,
"completed_action_joins": 2,
"board_approved_external_review_pending": 1,
"draft_or_near_joins_held_before_final_action": 2,
"formal_in_window_instruments_with_in_window_issuance_or_start": 2,
"funding_obligation_records": 1,
"verified_estimated_total_usd": 222665168,
"verified_obligated_through_cutoff_usd": 59175664,
"quantified_downstream_effect_claims": 0
},
"claim_limit": "This ledger records only action joins supported by official sources through the cutoff. It does not infer action from meetings, infer final approval from public review, infer procurement from standards, infer expenditure from obligations, or infer measured effect from operation.",
"mutation_boundary": "No shared package file, census, Catalog, Registry, README, wave ledger, validator, Chronicle file, chart, or existing historical artifact was changed."
}
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Original title: Wave 12 BSC, FASAB, and NSB action joins, 2025-2026