Skip to content

National security technology membrane map — 2026-08-17

NSSTS membrane map — 2026-08-17

Evidence cutoff: 2026-08-17
State: current Workbench research. Desk hunts feed this file. Not vault canon.
Parent: Federal Science Operating System
Companions: NSSTS full-reading · Scientific Trust Stack · DoW 30-university package · capital/export/data instrument cards

Ruling

The August 2026 *National Security Science & Technology Strategy* names one security membrane around the three Observatory control surfaces. Most of the named objects were already machines. The strategy does not turn them on, merge them, or give any of them a new jurisdiction.

What is new on this calendar is the same-day institution-level click: the Department of War’s 30 unnamed universities, notices asserted issued, reports due 31 August, tied to future funding eligibility. That action uses the Section 1286 foreign-institution list and Confucius-successor associations. It is not the NSSTS 1260H line, not a CHIPS foreign-entity determination, and not a government-wide payment stop.

The membrane is a federation of typed gates. Never compute one trusted: true.

2025 National Security Strategy
  -> NSSTS (doctrine; public PDF; transmittal/findings report not located)
  -> existing statutes, orders, lists and agency machines
  -> typed eligibility / mitigation / prohibition receipts
  -> award, contract, license, loan or access
  -> obligation, payment, revocation or recovery

A strategy sentence is not a receipt. A list match is not a decision. A notice is not a finding.

What this map is for

Four hunts, one picture:

  1. same-day join of NSSTS Pillar 4, the 30-university action, NSPM-33 / Common Forms / 1286, and the Scientific Trust Stack;
  2. the 1260H fundamental-research funding bar, bounded and not collapsed into 1286 or CHIPS FEOC;
  3. COINS (P.L. 119-60 Title LXXXV) versus live 31 CFR part 850;
  4. whether “strategic capital” and “passive investment” are a desk or a phrase.

Calendar watches sit at the end. They are not hunts.

Object ladder — do not skip a rung

RungObjectState at cutoff
DoctrineNSSTS, August 2026 coverpublic PDF; no signed transmittal, receipt, or separate 42 U.S.C. § 19221 findings report located
Adjacent doctrine*Science: A New Golden Age* (2026-07-21); NSTM-5 / M-26-16 (2026-07-21)report to the President; FY2028 budget memo. Neither is the findings report. NSTM-5 does not cite NSSTS. Agency plans due derived 2026-10-19
CharterEO 14363 Genesis / American Science and Security Platformoperative. Not named in NSSTS. Do not read Appendix A subfields as Genesis adoption
List / identity1286 list; 1260H list; SAM UEI; Common Forms; SciENcvoperating, separate legal effects
Agency machineDoW January 7 memo + 2026 decision matrix; NSF TRUST; DOE RTES; CFIUS; 31 CFR 850; 28 CFR 202; ICTS; FCC Covered List; FASC; OSCoperating by authority
Same-day clickDoW 30-university noticesasserted issued 2026-08-17; reports due 2026-08-31; names unpublished
Consequenceeligibility determination, award action, paymentnone identified for the 30

Same-day join

Two public objects landed on 2026-08-17. They are companions, not one instrument.

NSSTSDoW 30-university action
Kindnational functional strategyasserted formal notices + recipient-required institution review
OwnerOSTP (public PDF); transmittal unprovenOUSW(R&E)
Subjectresearch security, capital screening, export/data, workforce, infrastructureactive ties to 1286-listed foreign entities and Confucius-successor organizations
Who is reviewed“relevant agencies,” researchers, institutions, capital, datathe domestic institution
Deadlinenone in the PDF2026-08-31 report to the Department
Leveragelater CET plans, FY2028 budgets, later rules“future federal research funding” — DoW-stated; no NSF/NIH/DOE instrument published
Names Genesisnono

The university package already holds the event. The promotion-worthy movement is:

proposal / covered individual / award
  -> unnamed institutional cohort
  -> recipient-required comprehensive review of academic, financial and research ties
  -> mitigation, including possible termination of partnerships
  -> report to DoW by 2026-08-31
  -> possible eligibility determination
  -> possible award consequence

The January 7, 2026 DoW implementation memo is the operating program the August letters sit on: annual spot checks, a shared Fundamental Research Risk Review Repository (MVP targeted FY2026 Q2; full operating capability FY2026 Q4), current-and-pending support including students and postdocs, and a report on automated vetting and continuous monitoring. No located source says the August audit *is* a named memo item. The inference is strong. It is still an inference.

Clock neighbors, not proven causes:

DateObject
2026-08-17public NSSTS PDF verified; DoW notices asserted issued
2026-08-31institution reports due (14 calendar days after the public release date; notice-to-submission interval unknown)
FY2026 Q4DoW risk-review repository FOC target
2026-09-30end of FY2026
2026-10-01Confucius Institute waiver authority ends; prior waivers cease

Pillar 4 mechanisms — already law, agency practice, or strategy

NSSTS research-security list, mapped onto operating objects. Listing a mechanism here does not make it government-wide.

NSSTS lineOperating objectLegal effect todayGap
Track direct and indirect federal research recipientsSAM UEI; Common Forms / SciENcv Current and Pending (including students and postdocs in the DoW January memo); NSF analyticsagency disclosure and identity, not one national recipient registryno single interagency ledger of indirect recipients
Prohibit fundamental-research funding to high-risk entities, including 1260H companiesDoW January 2026 memo + 2026 matrix (DoW-only). Two narrow CHIPS-related statutes (NSF TIP / Manufacturing USA; DOE CHIPS-division covered support). FY2024 NDAA § 805 procurement/grant-to-the-company clocks.DoW practice + two program statutes. Not government-wide. NSSTS writes this in the future tensedo not substitute the DoW 1286 collaboration bar (P.L. 118-159 § 238 / P.L. 119-60 § 215)
Risk criteria and a sharable repositoryDoW Fundamental Research Risk Review Repository; NSF TRUST; DOE RTES; SECURE Center (42 U.S.C. § 19037)agency or center systems; DoW FOC targeted FY2026 Q4no located government-wide shared repository
Universal research-security reporting formsOSTP Common Forms (Biographical Sketch; Current and Pending Support); NSPM-33 implementationcommon schema, adopted on different agency datescommon schema is not a common truth store
Automated proposal vetting and continuous monitoring where appropriateNSF TRUST; DOE RTES change-triggered monitoring; DoW January memo report on automationanalytics and risk-triggered reviewNSF planned FY2027 restricted-entity policy still pending; not universal surveillance
Counterintelligence support to research centersFBI QIST Counterintelligence Protection Team (inside NCITF); field-specific outreachoperating team; origin muddy; EO 14413 directs a staffing *proposal* to expand itnot a general CI attachment to every lab
Cybersecurity guidelines for researchers and institutionsOSTP July 2024 covered-institution program; NIST IR 8481 still Initial Public Draftrequired framework; implementation unevenself-attestation is not accreditation

Allied research-security cooperation is named through the four Technology Prosperity Deal texts (UK, Japan, ROK, Sweden). Those texts are non-binding. They do not create a shared adjudication system.

Three lists that must never be merged

ListNative jobWhat a match can doWhat it cannot do
1286name foreign institutions and talent programsDoW funds may not go to a U.S. IHE for fundamental research *in collaboration with* a covered entity (FY2025 § 238 / FY2026 § 215); proposal matrix; August 17 stated subjectnot a CHIPS FEOC finding; not the list of the 30 domestic universities
1260Hname Chinese military companies operating in the U.S.see 1260H card — procurement and proposal-mitigation uses exist; government-wide fundamental-research-as-recipient bar is the questionnot the August 17 stated subject; not CHIPS FEOC
CHIPS FEOC15 CFR part 231 program conditionCHIPS award eligibility, guardrails, clawbacknot a DoW 1286 collaboration bar

Trust Stack rule, kept:

source list
  + exact entity and alias
  + list version / effective date
  + entity-resolution confidence
  + native legal effect
  + importing program and authority
  + transaction / award / collaboration object
  + actual decision receipt

A merged adverse flag without those fields is legally unsafe.

1260H fundamental-research funding bar

Ruling: mixed. NSSTS describes an existing DoW-only recipient-and-collaboration

practice that *imports* the 1260H list, plus two narrow CHIPS-related

statutes, and asks for a government-wide fundamental-research funding bar

that has not been enacted. The strategy writes the line in the future tense

(“measures that will further” NSPM-33).

§ 1260H itself (10 U.S.C. § 113 note) does not fund-bar anyone. It is a listing statute: identify Chinese military companies operating in the United States, publish annually until 31 December 2030, give a justification for each name. Last official list: *Federal Register* 10 June 2026 (91 Fed. Reg. 35189). FY2026 NDAA §§ 1262–1263 rewrote the definition (effective 18 December 2026) and told Defense to *consider* other restricted lists. They did not create a research-funding prohibition.

InstrumentWho is barredAgenciesFundamental research?State
§ 1260H listingnobody, by the listing aloneDefense publishesn/alist only. No SAM exclusion follows from the name
DoW January 2026 memo + 2026 matrixDoW funds may not go *to* a 1260H company for fundamental research; IHE collaboration with, or equipment from, a listed entity is a policy block. Table 1 Factor 4: active collaboration/funding *of or to* a current-list entity is prohibited; five-year affiliation or co-author is mitigationDoW onlyyes, as policyagency practice. Matrix puts this under NSPM-33 / January memo, not “prohibited by law”
P.L. 118-159 § 238 / P.L. 119-60 § 215U.S. IHE, for fundamental research *in collaboration with* a 1286 covered entityDoW fundsyesdifferent list. This is the August 17 stated subject
42 U.S.C. § 192351260H company may not receive or participateNSF TIP; 15 U.S.C. § 3722a(b)(1); Manufacturing USAprogram-specificnot all NSF
42 U.S.C. § 189121260H is an “entity of concern”; may not receive or perform DOE *covered support* authorized under CHIPS divisions A or BDOE, that support onlynot all Office of Scienceprogram-specific
FY2024 NDAA § 805DoW may not *contract* with a 1260H company as of 2026-06-30; may not *grant* to one until 2027-06-30DoWprocurement / grant to the company, not university collaborationstatute
SBIR/STTR Act (2026-04-13)agency must deny if a small business has a security-risk connection to a 1260H entitySBIR/STTR onlySBIR/STTRstatute
NSF 8 July 2026 DCLannounced FY2027 restricted-entity / collaboration termNSFplannednot effective
NIH RPG award term—NIH—not retrieved

The August 17 university action does not use 1260H as its stated subject.

Capital membrane

Inbound, outbound, and positive capital are three desks. NSSTS talks as if they were one architecture. They are one *picture*. They are not one statute.

DeskLive machineNSSTS next stepState
CFIUS50 U.S.C. § 4565; 31 CFR 800–802seek Congress for certain greenfield monitoring and expanded critical-technology jurisdictionask, not law
Known Investor Pilot / Strategic Vendor ProgramTreasury administrative processexpedite allied investment that accepts mitigationprocess, not new jurisdiction
Team Telecom / DCSA FOCIEO 13913; 32 CFR § 117.11named as mitigation deskslive, unchanged by NSSTS
Outbound 31 CFR 850effective 2025-01-02; PRC/HK/Macau; semiconductors, quantum, AIrefine/expand to supercomputing, hypersonics, other MCFlive three-sector program
COINS / DPA Title VIIIP.L. 119-60 Title LXXXV, signed 2025-12-18the statutory hook for that refine/expandstatute yes, implementing rule not located; part 850 stays until Treasury writes (~450 days, ≈ 2027-03-13)
Data Security Program28 CFR part 202, effective 2025-04-08, EO 14117“continue prioritizing”live; NSSTS “May 2025” date is wrong
BIS ICTS / FCC Covered List / FASC15 CFR 791; 47 U.S.C. § 1601; 41 U.S.C. §§ 1321–1328named as protective toolslive

Same-slip join. Public Law 119-60 (FY2026 NDAA, 2025-12-18) carries two different membrane objects:

One slip. Two clocks. Do not collapse them.

Entity Theory’s “Outbound Investment Security (2024)” is the part 850 / EO 14105 layer. It is not COINS.

COINS versus part 850

FeatureLive now (31 CFR 850)COINS / DPA Title VIII
HookEO 14105 + IEEPA. Effective 2025-01-02. Emergency continued 2026-08-03.50 U.S.C. §§ 4581–4589. Signed 2025-12-18. Sunsets ≈ 2032-12-18.
CountriesPRC, Hong Kong, MacauAdds Cuba, Iran, DPRK, Russia, Maduro Venezuela *as named countries*. Not punishable on those extras until rules
SectorsSemiconductors, quantum, AIFive *areas*, including HPC/supercomputing and hypersonics, subject to Treasury technical parameters
SupercomputingAlready a defined prohibited activity at § 850.224(f): 100 DP / 200 SP petaflops in ≤ 41,600 cu ft. Not a standalone sectorStatutory *area*, not self-executing
HypersonicsNot in part 850Statutory *area*, not self-executing
ProhibitionClosed activity lists; IEEPA civil/criminalSecretary *may* prohibit, *in accordance with regulations*. No day-one prohibition
Notification30 days after completion for notifiable dealsTreasury *shall* write notification rules by ≈ 2027-03-13. No U.S.-person filing duty until those rules
Rule statusDoneNo COINS rule, ANPR, or RFI located. February 2026 RFI is CFIUS Known Investor

Treasury FAQ after COINS became law: part 850 remains in effect until COINS regulations issue.

NSSTS “refine across supercomputers and hypersonics” is the statutory *ask*. It is not the live class.

Positive capital and “passive investment”

NSSTS names two things that sound like one wallet:

  1. “strategic capital investment structures” for commercial technology into national-security missions;
  2. “pathways for U.S. partners to support national security technology development through passive investment.”

America First Investment Policy (2025-02-21) also welcomes passive investment from sources distant from adversary practice. CFIUS already uses “passive investment” as a review-exception concept (a deal too passive to be a covered transaction). That exception is the opposite of a new allied-capital vehicle. Do not confuse them.

Ruling

LocutionWhat it is
NSSTS “strategic capital investment structures”Phrase. No office, instrument, or new authority. OSC is not named.
NSSTS “explore pathways … through passive investment”Phrase. Agency ask.
OSC itself (10 U.S.C. § 149)Desk. Preexisting. Loans, loan guarantees, technical assistance. Not equity, offtake, or a marketplace. Direct loans need 80 percent non-federal capital. Eligible investment must be a covered-technology category and not solely defense. New loans expire 2028-10-01.
CFIUS 31 CFR §§ 800.211 / 800.307Process / screen-out. Non-controlling, no-board, no-MNTI stakes are *outside* covered-investment jurisdiction. Opposite of a funding vehicle.
AFIP § 2(h)Policy welcome of that same passive class from *all* foreign persons. Not a vehicle.
Known Investor / Strategic VendorProcess. Pre-file diligence and post-clearance vendor awareness. They do not move money.
Four TPD textsPhrase. UK “intend to collaborate on securing and scaling private capital.” Sweden names investment *screening*. Japan and Korea have no capital desk. All four refuse a funds commitment.

OSC products at cutoff: 2024 equipment NOFA (Part 1 closed 2025-02-03; up to $984 million; working existing applicants); CTLP fund-level loans to managers, rolling; SBICCT (SBA leverage, not OSC equity); NSFF announced 2026-07-14, NOFO not retrieved. One executed loan located: MP Materials, $150 million, 2025-08-10. Phoenix Tailings $500 million (2026-06-16) is a conditional commitment, not a closed loan.

Do not stack OSC, DFC, EXIM, DOE Title 17, or CHIPS into one desk. In-Q-Tel was not named in any official instrument in this hunt.

Export and data membrane

Already machines. NSSTS adds no class.

MTCR “may be appropriate” is not a rule.

Observatory surfaces

SurfaceWhat the membrane does to itWhat would promote
Capital follows capabilitymoney and access move toward performers who pass typed security gates; OSC can *push* capital the other wayexecuted OSC (or other) instrument conditioned on a named eligibility receipt
Speed-to-poweradvanced-nuclear microgrids and domestic supply are strategy examples onlynamed site, reactor, interconnect, award
Scientific railsAppendix A now *names* agent authentication, digital identity, DLT/digital assets, PQC, supply-chain assurancea named credential, form, ledger, or signed result on a named system — not a CET bullet
Security membranefederation of lists, forms, pilots, CFIUS, outbound, data, export, and one institution-level DoW clicka decision receipt against a named institution, or a government-wide eligibility instrument

Genesis remains on its own charter (EO 14363). NSSTS does not name it. Appendix A does not adopt it.

Calendar — do not hunt early

DateObjectWhy it can move the map
2026-08-21Genesis IOC target for at least one challengenamed challenge + completed test, or a miss
2026-08-3130-university reports duefirst chance the cohort, a finding, or a Department determination becomes public
2026-09-11Senate returns from State Work Periodfirst honest window for a § 19221 transmittal / findings report in the CREC
2026-10-01Confucius waiver authority endsinstitution-level DoW funding clock next to the audit
2026-10-19NSTM-5 qualifying-agency plans (derived)first clock that can turn “relevant agencies should” into named offices
2026-11-24first Genesis annual reportplatform identity / provenance / security milestones, if public
≈ 2027-03-13COINS implementing-rule clock (450 days from 2025-12-18)supercomputing / hypersonics / extra countries become operative only if Treasury writes

Claim boundaries

Do not say this map proves:

Source spine

Fill list (this session)

Sources

Full saved reading

View cited sources (8)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.