NAMED CONNECTIONS
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
{
"schema": "f250.ai-infrastructure-connections/v1",
"compiled": "2026-11-18",
"purpose": "Selected source-backed connections for the existing AI infrastructure storyline; source owners and native clocks control.",
"records": [
{
"id": "argonne-service",
"title": "Argonne hardware to model and scientific-agent access",
"role_in_story": "core",
"stage": "reported operating",
"source_event_date": "2026-11-04",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"nssts-technology-company-map",
"genesis-mission"
],
"actors_as_stated_in_sources": [
"Argonne Leadership Computing Facility",
"HPE",
"NVIDIA",
"World Wide Technology",
"SambaNova"
],
"documented_connection": "Equipment and hosted models support API/chat access and named scientific workflows.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/ARGONNE_INFERENCE_HARDWARE_AND_AGENT_WORKFLOWS_2026-11-18.md",
"sha256": "d300880fa11dce611bebe953028e3055fee884bc986c57ed9aaa885889607db1",
"quote": "Argonne’s November 4, 2026 release reports Tara and Minerva as additions to its operating Inference Service, available to Genesis teams and other authorized researchers. Tara has 672 nodes and 2,688 NVIDIA GH200 Grace Hopper Superchips, using HPE Cray EX4000 architecture. Minerva, developed with World Wide Technology, has eight nodes and 64 NVIDIA B200 GPUs. Argonne also reports expanding Metis to six SambaRacks with 96 SambaNova SN40L processors."
},
"limit": "No contract values or new comparable service-wide outcome measure.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Argonne release date"
},
{
"id": "genesis-platform",
"title": "Genesis scientific platform and component records",
"role_in_story": "core",
"stage": "components at different stages",
"source_event_date": "2025-11-24",
"evidence_through": "2026-11-15",
"source_owner_ids": [
"genesis-mission"
],
"actors_as_stated_in_sources": [
"Department of Energy",
"national laboratories",
"research teams"
],
"documented_connection": "Scientific data, models, computing and laboratories are connected through named components with separate stages.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Science Operating System/Genesis Mission/GENESIS_MISSION.md",
"sha256": "6012e1bb4477246232c022a6e9c9e32b0b833c079ca393014c140c0c4baee7ac",
"quote": "The charter directs an integrated American Science and Security Platform. American Science Cloud and ModCon connect data, AI and shared services with laboratory computing and facilities. Each project has its own access conditions, scientific purpose and implementation state."
},
"limit": "Integrated-platform operation, research awards and individual system access retain separate evidence.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Executive order charter date; later component clocks are separate"
},
{
"id": "oak-ridge-commercial-site",
"title": "Oak Ridge commercial data-center RFP",
"role_in_story": "core",
"stage": "pause reported by GAO",
"source_event_date": "2026-10-16",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"data-center-federal-legal-spine"
],
"actors_as_stated_in_sources": [
"Department of Energy",
"Government Accountability Office"
],
"documented_connection": "DOE officials describe a paused commercial site solicitation; this is separate from scientific supercomputer operation.",
"source": {
"scope": "workbench",
"path": "Research Packages/Data Center Federal Legal Spine 2025-2026/DOE_LAND_REUSE_AND_OAK_RIDGE_PAUSE_2026-11-18.md",
"sha256": "1ccf6e0e98927281abab815bf2d674f2e47a2b9b1c73b6fe954ca1e8582f226f",
"quote": "GAO's October 16, 2026 report states that DOE officials described Oak Ridge's AI data-center request for proposals as currently paused. It gives no pause date or restart decision. This changes the recorded project state from an open-ended solicitation description to a reported pause; it does not concern Argonne's operating inference service or Oak Ridge's scientific supercomputers."
},
"limit": "Underlying pause date and restart decision not supplied.",
"evidence_vote": "none; source owner controls",
"source_date_role": "GAO report publication date; underlying pause day unknown"
},
{
"id": "observed-power",
"title": "Observed large-load electricity versus approval and requests",
"role_in_story": "core",
"stage": "operator-reported observations and queue states",
"source_event_date": "2026-04",
"evidence_through": "2026-11-11",
"source_owner_ids": [
"data-center-federal-legal-spine"
],
"actors_as_stated_in_sources": [
"ERCOT",
"Public Utility Commission of Texas",
"PJM Interconnection"
],
"documented_connection": "Grid records measure requests, eligibility, permission to energize and observed demand separately.",
"source": {
"scope": "workbench",
"path": "Research Packages/Data Center Federal Legal Spine 2025-2026/DATA_CENTER_OBSERVED_POWER_AND_BATCH_ZERO_2026-11-11.md",
"sha256": "7ff32ea26e8c32606607899624d0aa72f79d2f6a09e7a43a7a5d8000284094f6",
"quote": "ERCOT's April 2026 monthly report separates 5.9 GW of large loads classified as observed energized from 3.2 GW approved to energize with operation still unobserved. The large-load interconnection population also includes customers outside the data-center category. Its recorded stages and the February cloud-site usage measure answer different questions. [ERCOT April 2026 Monthly, p. 4](https://www.ercot.com/files/docs/2026/05/13/ERCOT-Monthly-April-2026-FINAL.pdf#page=4)"
},
"limit": "Regional populations are not a site-by-site AI capacity census.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Operator measurement month, not a facility start or report publication day"
},
{
"id": "meta-richland",
"title": "Meta campus ownership, utility resources and power work",
"role_in_story": "core",
"stage": "venture and approvals; construction; further application",
"source_event_date": "2025-10-21",
"evidence_through": "2026-11-10",
"source_owner_ids": [
"us-inbound-investment-industrial-capex"
],
"actors_as_stated_in_sources": [
"Meta",
"Blue Owl-managed funds",
"Laidley LLC",
"Evest LLC",
"Entergy Louisiana",
"Louisiana Public Service Commission"
],
"documented_connection": "Campus development finance and utility approvals involve separate entities, instruments and capacity measures.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/META_RICHLAND_POWER_AND_FINANCING_2026-11-10.md",
"sha256": "1cfe220ec08e9d96d2dd628123a088c3e4c94b45edca456937d80f652a31f08b",
"quote": "Meta and funds managed by Blue Owl Capital entered their Hyperion joint venture on October 21, 2025. They disclosed an 80% Blue Owl funds and 20% Meta ownership split, pro rata commitments against approximately $27 billion in estimated development costs, and about $7 billion in Blue Owl funds’ cash contributed at formation. Meta’s 2025 filing reports a $4.30 billion net asset contribution and a $2.55 billion distribution to Meta. The distribution is the audited filing’s more precise figure for the same distribution that the announcement described as about $3 billion. Meta’s September 2026 filing still gives $27 billion estimated development costs and 2029 Louisiana lease commencement. The venture estimate, investor cash and cash distributed to Meta describe different things. [Venture announcement](https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/) · [Meta 2025 Form 10-K, Note 5](https://www.sec.gov/Archives/edgar/data/1326801/000162828026003942/meta-20251231.htm) · [Meta September 2026 Form 10-Q, Note 5](https://www.sec.gov/Archives/edgar/data/1326801/000162828026066773/meta-20260930.htm)"
},
"limit": "Utility resource ratings and planned IT capacity are different; metered campus demand is not established.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Joint-venture formation date; utility decisions have separate dates"
},
{
"id": "iren-hardware3",
"title": "IREN GPU equipment and Microsoft service cash flows",
"role_in_story": "core",
"stage": "definitive financing disclosed",
"source_event_date": "2026-05-29",
"evidence_through": "2026-08-10",
"source_owner_ids": [
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"IE US Hardware 3 LLC",
"IREN",
"Microsoft",
"Goldman Sachs Bank USA",
"JPMorgan"
],
"documented_connection": "Equipment ownership, borrower debt and dedicated service-contract revenue form a disclosed financing chain.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/AI_INFRASTRUCTURE_CAPITAL_STACK_AND_RISK_TRANSFER_2026-08-10.md",
"sha256": "4ce99464935d2846f4bcee0c13e955c8bf15e0a7177a7e46914529135027e9c8",
"quote": "On May 29, 2026, IREN disclosed definitive financing for **IE US Hardware 3\nLLC**, a wholly owned subsidiary that is the borrower/issuer and acquirer/owner\nof GPU infrastructure.",
"version_checks": [
{
"date": "2026-11-18",
"previous_sha256": "a2e61fb87840c61fa63c0f4420b92c83bf7ddf86f003f7d0a887c896552deb95",
"result": "Quoted historical passage remains present; owner now routes to dated later return. No original event clock changed."
}
]
},
"limit": "August source clock retained; no later draw, performance or loss-event recertification.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Financing disclosure date"
},
{
"id": "coreweave-ddtl4",
"title": "CoreWeave GPU-project credit and named bank roles",
"role_in_story": "core",
"stage": "executed credit agreement",
"source_event_date": "2026-03-30",
"evidence_through": "2026-10-30",
"source_owner_ids": [
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"CoreWeave Compute Acquisition Co. VIII, LLC",
"MUFG Bank, Ltd.",
"U.S. Bank National Association",
"U.S. Bank Trust Company, National Association"
],
"documented_connection": "Borrower, administrative agent, depositary and collateral agent have distinct contractual functions.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/COREWEAVE_DDTL4_NAMED_AGENT_ROLES_2026-10-30.md",
"sha256": "e540a05dcdbd6f4a676f510331bdb5f71dc99cef30e2ac4d6baa71935cdfd503",
"quote": "**Why follow them:** these are distinct contractual functions around funding administration, accounts and security. An arranging title alone does not establish ongoing cash control or unilateral veto rights. Lender instructions, voting and account-control provisions require their own reading."
},
"limit": "Selected role/decision reading; later amendments, customer identity and exercised powers remain separate.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Executed agreement date"
},
{
"id": "abilene-property",
"title": "Abilene property and Oracle rent",
"role_in_story": "core",
"stage": "property operating in saved case",
"source_event_date": "2025-12-31",
"evidence_through": "2026-08-10",
"source_owner_ids": [
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"Abilene DC 1 LLC",
"Oracle America",
"Longhorn JV",
"Blue Owl vehicles",
"Crusoe affiliate"
],
"documented_connection": "The property and power asset has its own owner, construction financing and Oracle tenancy.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/AI_INFRASTRUCTURE_CAPITAL_STACK_AND_RISK_TRANSFER_2026-08-10.md",
"sha256": "4ce99464935d2846f4bcee0c13e955c8bf15e0a7177a7e46914529135027e9c8",
"quote": "**Abilene DC 1 LLC** owns, develops, leases and operates the first two buildings,\neight data halls and power station. Longhorn JV owns the SPV; Blue Owl vehicles\nhold about 92.3 percent and a Crusoe affiliate about 7.7 percent.",
"version_checks": [
{
"date": "2026-11-18",
"previous_sha256": "a2e61fb87840c61fa63c0f4420b92c83bf7ddf86f003f7d0a887c896552deb95",
"result": "Quoted historical passage remains present; owner now routes to dated later return. No original event clock changed."
}
]
},
"limit": "GPU title remains unresolved in this reading; no refreshed loan-balance finding.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Financial-statement measurement date; not the first-service date"
},
{
"id": "aligned-abs",
"title": "Aligned separate asset-backed financing",
"role_in_story": "core",
"stage": "company-reported completed issuance",
"source_event_date": "2026-07-28",
"evidence_through": "2026-11-11",
"source_owner_ids": [
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"Aligned Data Centers",
"enterprise customers"
],
"documented_connection": "A separate securitization draws on a defined campus/customer collateral pool after the equity acquisition.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/ALIGNED_DATA_CENTERS_ACQUISITION_AND_ABS_FINANCING_2026-11-11.md",
"sha256": "1217177b4e18326d57effd4e801e7a37dce7035c5ab091055b8febc73a8e59c0",
"quote": "On July 28, 2026, Aligned announced completion of a separate $1.183 billion asset-backed securities issuance. It described collateral from four campuses and 14 enterprise customers. The company identified development, refinancing and reserve accounts as intended uses of net proceeds. The issuance amount, enterprise valuation and growth commitment measure different objects. No allocation of proceeds to individual projects, connection to growth-capital draws or new capacity brought online is established by these releases. [Aligned issuance announcement](https://aligneddc.com/press-release/aligned-data-centers-completes-1-18-billion-securitization-financing/)\n"
},
"limit": "Issuance, enterprise value, growth commitment and added operating capacity cannot be substituted for one another.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Issuer announcement of completed issuance"
},
{
"id": "nvidia-financing-platforms",
"title": "NVIDIA and six financing-platform partners",
"role_in_story": "core",
"stage": "memoranda announced; final agreements pending at saved cutoff",
"source_event_date": "2026-08-10",
"evidence_through": "2026-08-10",
"source_owner_ids": [
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"NVIDIA",
"Apollo",
"BlackRock",
"Blackstone",
"Brookfield",
"Goldman Sachs",
"KKR"
],
"documented_connection": "The announced programme would organize independent underwriting and third-party capital for compute projects.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/AI_INFRASTRUCTURE_CAPITAL_STACK_AND_RISK_TRANSFER_2026-08-10.md",
"sha256": "4ce99464935d2846f4bcee0c13e955c8bf15e0a7177a7e46914529135027e9c8",
"quote": "NVIDIA announced memoranda of understanding with Apollo, BlackRock,\nBlackstone, Brookfield, Goldman Sachs and KKR to establish independent\nfinancing platforms intended to mobilize more than $500 billion of third-party\ncapital over time. NVIDIA says final agreements remain to be executed.",
"version_checks": [
{
"date": "2026-11-18",
"previous_sha256": "a2e61fb87840c61fa63c0f4420b92c83bf7ddf86f003f7d0a887c896552deb95",
"result": "Quoted historical passage remains present; owner now routes to dated later return. No original event clock changed."
}
]
},
"limit": "No project allocation, borrower or funding draw established by the saved announcement.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Announcement date"
},
{
"id": "intel-completion",
"title": "Intel CHIPS eligible-cost completion condition",
"role_in_story": "core",
"stage": "amended terms reported by GAO",
"source_event_date": "2025-08",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"us-inbound-investment-industrial-capex"
],
"actors_as_stated_in_sources": [
"Department of Commerce",
"Intel",
"Government Accountability Office"
],
"documented_connection": "Amended funding terms changed the condition by which six projects were considered complete.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/CHIPS_INTEL_AMENDED_COMPLETION_TEST_2026-11-18.md",
"sha256": "11a4c9a02fd2a4388f3b7bafb75d6dfa1162122481716dd7ff3f128041012b57",
"quote": "GAO's August 6, 2026 report says Commerce amended Intel's award for six projects in August 2025. Required project milestones not yet achieved were removed. Under the amended terms, each project would count as complete once Intel incurred eligible costs equal to its award amount. GAO says Commerce considered all six projects complete at amendment because Intel had already incurred the eligible costs. Commerce no longer required reporting against the removed original milestones."
},
"limit": "Agreement-defined completion and eligible costs do not establish every original physical milestone or fab production.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Amendment month as later reported by GAO; day unknown"
},
{
"id": "fbi-tips",
"title": "FBI network foundation and tip triage",
"role_in_story": "core",
"stage": "agency-reported deployment",
"source_event_date": "2025-09",
"evidence_through": "2026-10-03",
"source_owner_ids": [
"federal-agency-ai-plans-infrastructure"
],
"actors_as_stated_in_sources": [
"Federal Bureau of Investigation",
"Department of Justice",
"National Threat Operations Center"
],
"documented_connection": "Network and data infrastructure supports AI-assisted prioritization, human review and referral.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/FBI_TECHNOLOGY_BACKBONE_AI_TRIAGE_AND_MODERNIZATION_STATE_2026-10-03.md",
"sha256": "415f2b0d97a464d8e0abf3f9b3d6ae2e88bf8aadbbaca8aaa7ed6f2809a80f68",
"quote": "The operational core of Patel's tip-processing account is also real. DOJ's\npublic 2025 AI inventory identifies **TIPS** as an FBI AI use case deployed in\nSeptember 2025 with an Authorization to Operate. It prioritizes tips and routes\nsome for a second human review. The FY2027 budget says the National Threat\nOperations Center received more than two million calls and electronic tips in\nFY2025, including more than 6,800 urgent threat-to-life tips referred to field\noffices and fusion centers. This establishes an operating intake-and-routing\nworkflow. It does not establish Patel's claimed before/after latency, the\nnumber of threats prevented by the AI layer, false-positive or false-negative\nrates, or an independently measured causal effect."
},
"limit": "Selected TIPS/network facts only; no FISA/702 claim is adopted. Independent latency or prevention effect is not established.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Inventory-reported deployment month"
},
{
"id": "defense-enterprise",
"title": "Defense enterprise model access",
"role_in_story": "core",
"stage": "agency-reported deployment; provider agreements differ",
"source_event_date": "2025-12",
"evidence_through": "2026-08-23",
"source_owner_ids": [
"federal-agency-ai-plans-infrastructure"
],
"actors_as_stated_in_sources": [
"Department of Defense",
"CDAO",
"Google",
"xAI",
"OpenAI"
],
"documented_connection": "Enterprise availability, provider agreement, production access and adoption have their own evidence.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/WAVE_4_DEFENSE_AI_ACCELERATION_IMPLEMENTATION_AND_SUPPLIER_DELTA_2026-08-23.md",
"sha256": "bb02859b4c063d00682ee74793309cce3ed91b15cf5d70242f22285927b4520c",
"quote": "The service launched in December 2025 on the nonclassified Department network\nwith Gemini for Government, CAC access and controlled-unclassified-information\nhandling. The December 22 xAI agreement targeted Grok at IL5 in early 2026. On\nFebruary 9 the Department announced an OpenAI partnership and planned ChatGPT\naccess for all three million personnel. On May 1 the Department reported more\nthan 1.3 million users, tens of millions of prompts and hundreds of thousands\nof agents in five months."
},
"limit": "August baseline; provider-specific hosting, production and later usage are not uniformly recertified.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Agency-reported platform launch month"
},
{
"id": "nara-broker-cloud",
"title": "NARA broker, clouds and archival application suppliers",
"role_in_story": "core",
"stage": "dated supplier/award map",
"source_event_date": "2021",
"evidence_through": "2026-08-23",
"source_owner_ids": [
"nara-ai-records-compute-transition"
],
"actors_as_stated_in_sources": [
"National Archives and Records Administration",
"CTAC",
"AWS",
"Microsoft Azure",
"Google Cloud",
"application integrators"
],
"documented_connection": "Direct federal recipient, underlying cloud and workload application providers are distinct.",
"source": {
"scope": "workbench",
"path": "Research Packages/NARA AI Records Layer and Buildout 2026-08-23/NARA_COMPUTE_AND_INFRASTRUCTURE_SUPPLIER_MAP_2026-08-23.md",
"sha256": "3e429f1cf464cab0e526ac6c1c740dabd4340488c0afea914197687889337813",
"quote": "NARA awarded CTAC the single-award **Platform and Infrastructure Cloud for\nArchives and Records Depositories (PICARD)** blanket purchase agreement in\n2021. Its published base-and-options value is **$86 million**, which is a\nceiling—not an obligation. The parent period of performance runs through\n**September 29, 2026**.",
"version_checks": [
{
"date": "2026-11-18",
"previous_sha256": "a2afc5d80d7070fd3113992071124b118127ef0fe821155f5ae4388a77d95c88",
"result": "Historical quote rechecked verbatim after dated companion/continuity pointer insertion; original event clock retained."
}
]
},
"limit": "Historical contract periods require their own later continuity checks; no inference of cessation from an end date.",
"evidence_vote": "none; source owner controls",
"source_date_role": "BPA award year; later call/obligation periods separate",
"date_label_before_2026-11-18": {
"source_event_date": "2026-08-23",
"reason": "The original label used the research cutoff rather than the BPA award year."
}
},
{
"id": "network-rights",
"title": "Physical internet assets and contracted access",
"role_in_story": "context",
"stage": "technical/legal reference with named examples",
"source_event_date": null,
"evidence_through": "2026-10-21",
"source_owner_ids": [
"sovereign-communications"
],
"actors_as_stated_in_sources": [
"network and facility owners",
"network operators",
"cloud customers"
],
"documented_connection": "Cables, capacity rights, routing, facility operation and applications can belong to different parties.",
"source": {
"scope": "workbench",
"path": "Research Packages/Sovereign Communications/WHO_OWNS_INTERNET_INFRASTRUCTURE.md",
"sha256": "8e6e051586d8c3c95e6fc2943acb6f24ba74c885525e8203f47f3cab0d4f489f",
"quote": "**Answer:** Telecom operators, specialist fiber businesses, technology companies, property companies, public networks and cooperatives own different pieces. An operating network combines equipment with owned or contracted links. Networks connect through physical interconnections plus routing configurations and commercial or membership agreements. Land, cable, capacity, router, building, server and application can have different owners."
},
"limit": "General arrangements and named examples do not establish a particular AI site's network route.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Reference-study compilation date; no single physical network event",
"reference_compilation_date": "2026-10-21"
},
{
"id": "si-export-packages",
"title": "Designated American SI export offerings",
"role_in_story": "core",
"stage": "designations announced",
"source_event_date": "2026-11-16",
"evidence_through": "2026-11-16",
"source_owner_ids": [
"federal-agency-ai-plans-infrastructure"
],
"actors_as_stated_in_sources": [
"Department of Commerce",
"International Trade Administration",
"designated package anchors",
"foreign buyers"
],
"documented_connection": "Pre-set offerings combine hardware/infrastructure, data pipelines, models, cybersecurity and applications.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/AMERICAN_SI_EXPORTS_DESIGNATIONS_AND_CHIP_CONTROLS_2026-11-16.md",
"sha256": "925421c9b635f6909d4030b2e63073e474650645bb0efe3038b73c28020cb9c0",
"quote": "**Commerce announced an initial 33 designated pre-set consortia and published a menu of their packages.** Commerce previously reported 78 applications after the June 30 close. The menu gives U.S. and Foreign Commercial Service representatives and interagency partners named offerings to present to foreign governments and buyers. Each pre-set package spans hardware and infrastructure, data pipelines, models, cybersecurity and applications. Commerce also announced that applications for the **on-demand** route will open November 30. Those applications need an identified export opportunity and can cover the subset of layers the deal requires. The November 16 release records the designations and the future opening date. Individual decision-notice dates and the disposition of other proposals are outside the public menu. [Commerce release](https://www.trade.gov/press-release/department-commerce-designates-si-export-packages-announces-next-phase-american-si) · [July application count](https://www.trade.gov/press-release/commerce-statement-application-conclusion-next-steps-american-ai-exports-program) · [Program rules for both routes](https://siexports.gov/si-consortia)."
},
"limit": "Designation, export licensing, financing and customer deployment are separate decisions.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Commerce designation-announcement date"
},
{
"id": "atf-extraction-demo",
"title": "ATF hearing witness data-extraction demonstration",
"role_in_story": "context",
"stage": "witness-described demonstration",
"source_event_date": "2026-11-18",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"house-oversight-corpus"
],
"actors_as_stated_in_sources": [
"Gun Owners of America",
"Aidan Johnston"
],
"documented_connection": "A witness describes extracting form information into structured data and map links.",
"source": {
"scope": "workbench",
"path": "Corpora/House Oversight/HOUSE_OVERSIGHT_TRANSCRIPTS/2026-11-18__atf-out-of-business-records/ANALYSIS.md",
"sha256": "b00ee4aea429364ea67a0da6a1484d434451910b02d3f465c18e015d6835a1a0",
"quote": "- **Cloud–Johnston exchange, approximately 1:12–1:14 in the replay:** discussion of TIFF images, metadata, optical character recognition and using AI to extract the written information. It concerns making existing records more searchable, without naming a distributed ledger. [Replay at 1:12](https://www.youtube.com/watch?v=F6WT1D1gjjM&t=4320).\n- **GOA demonstration, printed p. 58 / PDF p. 60:** Johnston says Grok helped build a tool running Qwen3-VL 8B on his Nvidia RTX 4070 Ti. It reads forms into spreadsheet rows, flags uncertain entries and links an address to Google Maps. This is the witness's described demonstration, not an official ATF registration application or proof of ATF deploying that model. [Filed report](https://docs.house.gov/meetings/GO/GO33/20261118/119594/HHRG-119-GO33-Wstate-JohnstonA-20261118.pdf#page=60).\n- **Hypothetical scale-up on that page:** Amazon's government cloud, AI token costs and DOE supercomputer GPUs appear in GOA's rough extrapolation. They do not identify an ATF cloud contract, reserved DOE computing allocation or production integration.\n- **Existing document-processing systems:** the report names IBML ImageTrac/DocNetics and BMI Imaging Systems' Digital ReeL, drawing on older FOIA materials and vendor capability descriptions (printed pp. 16–23). A product's advertised OCR capability is not proof that the capability is enabled in ATF's installation. OIG separately describes ECM image storage and indexes and the role of ATF's Office of Science and Technology in managing modernization and IT contractors (printed pp. 10, 16, 20). These are conventional document/search infrastructure descriptions."
},
"limit": "No ATF deployment, contract or blockchain connection established.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Hearing/testimony date; not the prototype creation date"
},
{
"id": "fed-financing-measures",
"title": "Fed measurement of advanced-computing debt",
"role_in_story": "context",
"stage": "official report estimates",
"source_event_date": "2026-11-13",
"evidence_through": "2026-11-16",
"source_owner_ids": [
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"Board of Governors of the Federal Reserve System",
"technology borrowers",
"funds and insurers",
"bank holding companies"
],
"documented_connection": "Public/private financing, leases and contingent support distribute exposures across institutions.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/FED_FINANCIAL_STABILITY_AI_FINANCING_AND_EXPOSURE_RETURN_2026-11-16.md",
"sha256": "4d5420bfaa625b4ec0c17005061ad275f96e2fef96518ee4201f2f12e0abab7b",
"quote": "The November 13 Federal Reserve Financial Stability Report, Box 2.2, identifies more than **$680 billion of advanced computing debt issues through October 2026**, roughly 31% of issuance by nonfinancial investment-grade companies on the report's comparison. It separately estimates over **$1.1 trillion of related public debt outstanding** in October. The issuance estimate includes public and trackable Rule 144A securities, with incomplete coverage of private transactions and no §4(a)(2) placements. Output is a staff estimate on defined exposures. It is also distinct from the amount of capex incurred or facilities energized. [Financial Stability Report, printed pp. 23–25](https://www.federalreserve.gov/publications/files/financial-stability-report-20261113.pdf#page=31)"
},
"limit": "Defined issuance/exposure populations are not project capex or a dedicated AI-loss estimate.",
"evidence_vote": "none; source owner controls",
"source_date_role": "Report publication date; financing estimates use earlier measurement dates"
},
{
"id": "gf-tsmc-interposers",
"title": "GF Malta to TSMC packaging components",
"role_in_story": "core",
"stage": "company-announced agreement; later production target",
"source_event_date": "2026-10-08",
"source_date_role": "Agreement announcement; production ramp is a separate target",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"nssts-technology-company-map"
],
"actors_as_stated_in_sources": [
"GlobalFoundries",
"TSMC"
],
"documented_connection": "Named component supplier, customer and production site.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/AI_MEMORY_PACKAGING_AND_SUPPLIER_JOINS_2026-11-18.md",
"sha256": "d8da2b64eb6c073ec87e45679622b4e4281aee1731c65ce01b0856353afb53e3",
"quote": "GlobalFoundries announced an agreement with TSMC on October 8, 2026 for silicon interposers made at Malta, New York, serving TSMC's CoWoS packaging ecosystem. The announced value is $2 billion over an initial five years. The company targets a volume-production ramp in the first half of 2028. This identifies a supplier, customer, component and site, while leaving production and delivery prospective. [Company announcement](https://gf.com/news-and-events/news/globalfoundries-reaches-agreement-to-establish-us-based-supply-of-silicon-interposers-for-advanced-ai-packaging/), manufacturing and timing paragraphs."
},
"limit": "No delivered component or federal-system bill of materials.",
"evidence_vote": "none; source owner controls"
},
{
"id": "sk-hynix-indiana-packaging",
"title": "Korean wafers to planned Indiana memory packaging",
"role_in_story": "core",
"stage": "groundbreaking reported; future line operation",
"source_event_date": "2026-08-27",
"source_date_role": "Ceremony date; August 28 release and future operating targets are separate",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"nssts-technology-company-map"
],
"actors_as_stated_in_sources": [
"SK hynix"
],
"documented_connection": "Cross-border wafer-to-packaging framework with separate future production clock.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/AI_MEMORY_PACKAGING_AND_SUPPLIER_JOINS_2026-11-18.md",
"sha256": "d8da2b64eb6c073ec87e45679622b4e4281aee1731c65ce01b0856353afb53e3",
"quote": "SK hynix's August 28 release reports a groundbreaking ceremony held August 27, 2026 in West Lafayette. Its Indiana plan sends wafers made in South Korea to U.S. packaging and testing, with cleanroom opening targeted for October 2028 and mass production for the second half of 2029. Domestic packaging therefore does not establish domestic wafer fabrication. Groundbreaking also does not establish a commissioned line or qualified production. [SK hynix release](https://news.skhynix.com/en/groundbreaking-ceremony-in-indiana/), investment and operating-framework paragraphs."
},
"limit": "Exact award entity and customer qualification remain unresolved.",
"evidence_vote": "none; source owner controls"
},
{
"id": "amkor-tsmc-apple-plan",
"title": "Amkor packaging plan and named customer flow",
"role_in_story": "core",
"stage": "planned flow; construction and production prospective",
"source_event_date": "2025-10-06",
"source_date_role": "Source release/groundbreaking date; recovered November 18, not a new event",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"nssts-technology-company-map"
],
"actors_as_stated_in_sources": [
"Amkor",
"TSMC Arizona",
"Apple",
"NVIDIA"
],
"documented_connection": "Planned customer flow and distinct construction/production targets qualify older wording.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/AI_MEMORY_PACKAGING_AND_SUPPLIER_JOINS_2026-11-18.md",
"sha256": "d8da2b64eb6c073ec87e45679622b4e4281aee1731c65ce01b0856353afb53e3",
"quote": "Amkor's October 6, 2025 groundbreaking release, already linked in the capex ledger, separates first-facility construction expected in mid-2027 from production expected in early 2028. It identifies Apple and NVIDIA as key customers and carries Apple's stated plan for TSMC Arizona silicon to be packaged/tested at Amkor. That qualifies the August registry's 2027 production wording and blanket absence of a named foundry/customer flow. It remains a planned flow, with no accepted production or particular federal AI-system delivery established. [Amkor release](https://ir.amkor.com/news-releases/news-release-details/amkor-technology-breaks-ground-new-semiconductor-advanced), schedule, customer and Apple paragraphs. This is recovery of an older source, not a new November groundbreaking."
},
"limit": "No accepted production or particular federal AI-system delivery.",
"evidence_vote": "none; source owner controls"
},
{
"id": "coreweave-september-borrowing",
"title": "CoreWeave later facility balance and guarantee distinction",
"role_in_story": "core",
"stage": "outstanding borrowing reported",
"source_event_date": "2026-09-30",
"source_date_role": "Quarter-end measurement date; not credit-agreement execution or delivery date",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"ai-infrastructure-capital-stack-risk-transfer",
"us-inbound-investment-industrial-capex"
],
"actors_as_stated_in_sources": [
"CoreWeave",
"CoreWeave Compute Acquisition Co. VIII, LLC",
"CoreWeave Financing DDTL V-V, LLC"
],
"documented_connection": "Later borrowing observation and facility-specific guarantee contrast.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/COREWEAVE_AND_IREN_FINANCING_TO_SERVICE_RETURN_2026-11-18.md",
"sha256": "dad3c3a3f1f954041561a65a599d067cb272ede39c4856b0bcd32f5fe18ca115",
"quote": "At September 30, 2026, CoreWeave reports $2.2 billion floating-rate and $2.4 billion fixed-rate borrowing outstanding under DDTL 4.0. Together these rounded figures are approximately $4.6 billion, against an $8.5 billion facility ceiling. The filing retains CCAC VIII's asset security and limited nonrecourse carve-outs. It separately describes the August DDTL 5.5 facility, borrowed by CoreWeave Financing DDTL V-V, LLC, as parent-guaranteed. [September 10-Q](https://www.sec.gov/Archives/edgar/data/1769628/000176962826000465/crwv-20260930.htm), Note 10, printed pp. 32–34."
},
"limit": "Rounded balance sum is not cumulative gross draws, equipment delivery or customer identity.",
"evidence_vote": "none; source owner controls"
},
{
"id": "iren-horizon1-delivery",
"title": "IREN equipment and network configuration delivered to Microsoft",
"role_in_story": "core",
"stage": "reported delivery; quarter service statement separate",
"source_event_date": "2026-08",
"source_date_role": "Delivery month reported October 8; precise day and service start day unknown",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"ai-infrastructure-capital-stack-risk-transfer",
"us-inbound-investment-industrial-capex"
],
"actors_as_stated_in_sources": [
"IREN",
"Microsoft",
"NVIDIA"
],
"documented_connection": "Named equipment and network configuration reaches a customer deployment.",
"source": {
"scope": "workbench",
"path": "Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/COREWEAVE_AND_IREN_FINANCING_TO_SERVICE_RETURN_2026-11-18.md",
"sha256": "dad3c3a3f1f954041561a65a599d067cb272ede39c4856b0bcd32f5fe18ca115",
"quote": "IREN's October 8 statement dates delivery of Horizon 1 to Microsoft to August 2026. It identifies a 50 MW IT-load deployment at Childress, Texas, using NVIDIA GB300 NVL72 and Quantum-X800 InfiniBand, and reports NVIDIA testing for Exemplar status. The month of delivery is known; the precise day is not supplied. [IREN equipment/delivery statement](https://iren.com/resources/news/nvidia-exemplar-cloud-nvidia-gb300-nvl72-status)."
},
"limit": "No public Hardware 3 tranche allocation, exact first fee or full GPU acceptance schedule.",
"evidence_vote": "none; source owner controls"
},
{
"id": "ohio-doj-data-instrument",
"title": "Ohio business records to DOJ under a signed framework",
"role_in_story": "core",
"stage": "executed framework; implementation annex unreviewed",
"source_event_date": "2026-06-04",
"source_date_role": "Both signatures dated June 4; execution/term differs from actual feed start",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"federal-agency-ai-plans-infrastructure",
"federal-state-fraud-data-agreements-ai-oversight",
"fraud-payment-integrity"
],
"actors_as_stated_in_sources": [
"Ohio Secretary of State",
"DOJ National Fraud Enforcement Division"
],
"documented_connection": "Public-record data sharing, safeguards, validation duties and implementing instruments.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/AI_DATA_ACCESS_AND_OPERATING_RESULTS_2026-11-18.md",
"sha256": "c91b0f7607bc8f7b4cdeed8202be1f0a1f23357d845f8e0f55ca4a3edc7dbecc",
"quote": "Ohio's published MOU with DOJ's National Fraud Enforcement Division covers public business records, reserves technical schedules/schemas to an annex or service agreement, limits access and requires independent validation before action. It neither expands the parties' authority nor itself transfers funds. The final page carries both signatures dated June 4, 2026. Its term begins on the last signature and lasts one year unless terminated earlier. The public six-page file does not include the referenced Appendix A or implementing annex. [Official announcement and source link](https://www.ohiosos.gov/office/media-center/categories/press-releases/2026-06-04); [MOU](https://files.constantcontact.com/b01249ec501/24cec2f4-cabf-4487-963c-0ced54f97679.pdf?rdr=true), sections IV–XIV and signature page."
},
"limit": "No live transfer frequency, model, Florida terms or technical annex obtained.",
"evidence_vote": "none; source owner controls"
},
{
"id": "prac-nfdc-analytics-partnership",
"title": "PRAC analytics and NFDC membership",
"role_in_story": "core",
"stage": "documented partnership with established analytic capabilities",
"source_event_date": "2026-08-25",
"source_date_role": "Membership release date; older PACE capabilities have their own history",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"federal-agency-ai-plans-infrastructure",
"federal-state-fraud-data-agreements-ai-oversight",
"fraud-payment-integrity"
],
"actors_as_stated_in_sources": [
"PRAC",
"NFDC",
"PACE"
],
"documented_connection": "A named member contributes data and analytics; exact shared technical instance is unproved.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/AI_DATA_ACCESS_AND_OPERATING_RESULTS_2026-11-18.md",
"sha256": "c91b0f7607bc8f7b4cdeed8202be1f0a1f23357d845f8e0f55ca4a3edc7dbecc",
"quote": "PRAC's August 25, 2026 statement identifies it as an inaugural NFDC member bringing data and analytical capabilities. Its older PACE description identifies risk models, machine learning, reusable code, data scientists and investigative handoffs. Those are documented capabilities and a partnership, without identifying PACE as the NFDC's common platform or proving that Ohio/Florida records enter it. [Membership statement](https://www.pandemicoversight.gov/news/articles/prac-joins-national-fraud-detection-center-to-strengthen-governmentwide-antifraud-efforts); [PACE methods and handoffs](https://www.pandemicoversight.gov/spotlight/using-data-intelligence-to-fight-pandemic-fraud), last modified August 15, 2024."
},
"limit": "No proof that PACE is the NFDC-wide platform or that particular State records enter it.",
"evidence_vote": "none; source owner controls"
},
{
"id": "pbgc-reported-repayment",
"title": "PBGC management reports repayment after review and settlements",
"role_in_story": "core",
"stage": "reported repayment; no independent cash reconciliation",
"source_event_date": "2025-09-30",
"source_date_role": "Management-reported cumulative repayment cutoff; not an NFDC event or November 2026 recovery",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"federal-agency-ai-plans-infrastructure",
"federal-state-fraud-data-agreements-ai-oversight",
"fraud-payment-integrity"
],
"actors_as_stated_in_sources": [
"PBGC",
"DOJ",
"Treasury"
],
"documented_connection": "A separately documented agency repayment outcome complements the PRAC analytic-workflow description.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/AI_DATA_ACCESS_AND_OPERATING_RESULTS_2026-11-18.md",
"sha256": "c91b0f7607bc8f7b4cdeed8202be1f0a1f23357d845f8e0f55ca4a3edc7dbecc",
"quote": "PBGC management separately reports $261.9 million repaid to Treasury as of September 30, 2025, combining $119.5 million from plan repayments and $142.4 million from settlements. The response says retrospective death audits were completed and the related OIG recommendation subsequently closed. This is management-reported repayment, beyond a potential-loss estimate, but no bank-level receipt reconciliation was performed here. The approximate PRAC figure is not additional money to add to PBGC's amount. [Management response to the April–September 2025 OIG report](https://www.pbgc.gov/sites/default/files/documents/management-response-oig-semiannual-report-congress-period-april-1-2025-september-30-2025.pdf), PDF page 2."
},
"limit": "No isolated causal model contribution, bank-level reconciliation or later NFDC attribution.",
"evidence_vote": "none; source owner controls"
},
{
"id": "nara-era-service-orders",
"title": "NARA NEEMO to later Skylight ERA service orders",
"role_in_story": "core",
"stage": "publicly reported procurement",
"source_event_date": "2026-09-08",
"source_date_role": "Both orders signed September 8; September 2 performance starts are separate",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"nara-ai-records-compute-transition"
],
"actors_as_stated_in_sources": [
"NARA",
"Skylight Inc."
],
"documented_connection": "Implementation orders cover ERA production and non-production cloud environments.",
"source": {
"scope": "workbench",
"path": "Research Packages/NARA AI Records Layer and Buildout 2026-08-23/NARA_CLOUD_ERA_PROCUREMENT_CONTINUITY_RETURN_2026-11-18.md",
"sha256": "1f0331943bbe95d27332da0e73fc89c66a994daa4f89258cffd70755ab495ba8",
"quote": "USAspending reports two Skylight Inc. orders under the NEEMO vehicle `88310326D00009`. Both descriptions cover lifecycle digital services for ERA's production and non-production cloud environments. Both have a September 8, 2026 signature date and a September 2 performance start. The dates are not interchangeable."
},
"limit": "No complete predecessor-transfer, underlying-cloud allocation, AI-only spend or accepted service.",
"evidence_vote": "none; source owner controls"
},
{
"id": "nara-public-search-use",
"title": "A public NARA query returns an archival-record link",
"role_in_story": "core",
"stage": "observed query and link response",
"source_event_date": "2026-11-11",
"source_date_role": "Saved browser-check date; not first public service or a November 18 retest",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"nara-ai-records-compute-transition"
],
"actors_as_stated_in_sources": [
"NARA",
"public researcher"
],
"documented_connection": "Plain-language query returns record, excerpt/page cue and a reachable PDF.",
"source": {
"scope": "workbench",
"path": "Research Packages/NARA AI Records Layer and Buildout 2026-08-23/NARA_PUBLIC_AI_SEARCH_JFK_RESULT_2026-11-11.md",
"sha256": "971978688a44b058fcdd49905a2edbb990d1c26c823667b0b5ccb76f77d08284",
"quote": "The search field on NARA’s 2025 JFK release page accepted “Mexico City Station History” on November 11, 2026 without a sign-in. The page displayed 31 results. The first displayed result identified record 104-10414-10124, showed a contextual excerpt and labeled it “Page 9.” Its document link returned HTTP 200 with PDF content type on a header request. The test verified the link response and the displayed page cue. The scan’s text and the accuracy of other results were outside the check. [NARA release page](https://www.archives.gov/research/jfk/release-2025)"
},
"limit": "No scan-text validation, comprehensive corpus test or comparative search-performance result.",
"evidence_vote": "none; source owner controls"
},
{
"id": "doj-sitf-fraud-junction",
"title": "DOJ coordination joins the fraud and other legal components",
"role_in_story": "core",
"stage": "coordination body established",
"source_event_date": "2026-10-13",
"source_date_role": "Attorney General memorandum date; not database or model deployment date",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"federal-agency-ai-plans-infrastructure",
"federal-state-fraud-data-agreements-ai-oversight",
"fraud-payment-integrity"
],
"actors_as_stated_in_sources": [
"DOJ-SITF",
"National Fraud Enforcement Division",
"FBI",
"White House SIF"
],
"documented_connection": "Institutional coordination and requested notification across legal components.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/AI_DATA_ACCESS_AND_OPERATING_RESULTS_2026-11-18.md",
"sha256": "c91b0f7607bc8f7b4cdeed8202be1f0a1f23357d845f8e0f55ca4a3edc7dbecc",
"quote": "DOJ's October 13 memorandum places the National Fraud Enforcement Division alongside FBI, criminal, civil, national-security and other components in DOJ-SITF. It assigns coordination and a principal contact with the White House SIF. The memorandum's notification process is to be developed, with urgency exceptions. It supplies neither a database topology nor authorization for every component to access all records. [Memorandum](https://www.justice.gov/opa/media/1470291/dl?inline=), two pages; [existing November operating map](DOJ_SUPER_INTELLIGENCE_TASK_FORCE_OPERATING_MAP_2026-11-05.md)."
},
"limit": "No common dataset access, system topology or attributed task-force outcome established.",
"evidence_vote": "none; source owner controls"
},
{
"id": "kilby-customer-power",
"title": "Kilby project venture and Microsoft power contract",
"role_in_story": "core",
"stage": "owner-reported customer contract and prospective generation",
"source_event_date": null,
"source_date_role": "Undated project page inspected November 18; contract execution day not established",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"ai-turbine-asset-management-power-buildout",
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"Energy Forge One",
"Chevron",
"Joulent",
"Microsoft"
],
"documented_connection": "Project ownership and a long-term customer demand contract support the dedicated-power path.",
"source": {
"scope": "workbench",
"path": "Research Packages/AI-Enabled Turbine Asset Management and US Power Buildout 2025-2026/POWER_FOR_COMPUTE_AND_OLDER_OPERATING_ANALYTICS_2026-11-18.md",
"sha256": "0d916f7384eeeee83fe3d50a3d1dff7a3ccd578174cec21119871ee4db30da6e",
"quote": "The Kilby project page names Energy Forge One as a 50/50 Chevron–Joulent venture with a 20-year Microsoft power-purchase agreement for a co-located Reeves County, Texas facility."
},
"limit": "No project draw, FID, commissioned capacity or actual water-use series from this page.",
"evidence_vote": "none; source owner controls"
},
{
"id": "joulent-national-grid-capital",
"title": "National Grid proposed minority capital at Joulent",
"role_in_story": "core",
"stage": "agreed investment reported",
"source_event_date": "2026-07-01",
"source_date_role": "Company release date, not a verified cash closing or project draw",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"ai-turbine-asset-management-power-buildout",
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"Joulent",
"National Grid",
"National Grid Ventures"
],
"documented_connection": "Corporate capital and project ownership are distinct layers.",
"source": {
"scope": "workbench",
"path": "Research Packages/AI-Enabled Turbine Asset Management and US Power Buildout 2025-2026/POWER_FOR_COMPUTE_AND_OLDER_OPERATING_ANALYTICS_2026-11-18.md",
"sha256": "0d916f7384eeeee83fe3d50a3d1dff7a3ccd578174cec21119871ee4db30da6e",
"quote": "Joulent's July 1, 2026 release says National Grid agreed to a $1.75 billion minority investment through National Grid Ventures."
},
"limit": "No executed complete investment instrument or allocation of paid cash to Kilby.",
"evidence_vote": "none; source owner controls"
},
{
"id": "vann-operating-data-antecedent",
"title": "Vann cloud diagnostics and thermal-twin workflow",
"role_in_story": "core",
"stage": "published named operating-data case",
"source_event_date": "2021",
"source_date_role": "Printed publication year; not installation or service-start day",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"ai-turbine-asset-management-power-buildout",
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"PowerSouth",
"Vann Power Station",
"Siemens Energy"
],
"documented_connection": "Turbine measurements, cloud diagnostics and engineering recommendations form an older operating-data path.",
"source": {
"scope": "workbench",
"path": "Research Packages/AI-Enabled Turbine Asset Management and US Power Buildout 2025-2026/POWER_FOR_COMPUTE_AND_OLDER_OPERATING_ANALYTICS_2026-11-18.md",
"sha256": "0d916f7384eeeee83fe3d50a3d1dff7a3ccd578174cec21119871ee4db30da6e",
"quote": "Siemens' two-page Vann Power Station case carries a 2021 publication copyright. It describes gas-turbine data sent to a cloud diagnostic service, comparison against a thermal twin, anomaly alerts and engineers working with PowerSouth on recommended recovery actions."
},
"limit": "No generative-model identification, transferred plant authority or independent prospective performance result.",
"evidence_vote": "none; source owner controls"
},
{
"id": "data-holdings-services",
"title": "Data Holdings operating site and physical services",
"role_in_story": "core",
"stage": "operator-described operating colocation and limited AI",
"source_event_date": null,
"source_date_role": "Undated presentation body inspected November 18; no new commissioning date inferred",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"sovereign-compute"
],
"actors_as_stated_in_sources": [
"Data Holdings",
"Forest County Potawatomi",
"Potawatomi Ventures",
"We Energies"
],
"documented_connection": "Tribal ownership, site, utility power, cooling and network services support customer use.",
"source": {
"scope": "workbench",
"path": "Research Packages/Sovereign Compute/SOVEREIGN_SITING_OPERATING_SERVICES_AND_PERMIT_RECORDS_2026-11-18.md",
"sha256": "29797c4bb614ac64a7e6fb7c164fd5e3a61b1745a830e1a99375a08772232a4d",
"quote": "In DOE's published webinar transcript, Data Holdings' Ryan Brooks describes a tribally owned Milwaukee colocation business, in-house operation, a 17 MW site buying electricity from We Energies, closed-loop mechanical cooling, free cooling in suitable weather and local network/peering services. He also says it hosts some limited AI."
},
"limit": "Site rating and reported operation are not audited metered AI load, uptime or a new hyperscale campus.",
"evidence_vote": "none; source owner controls"
},
{
"id": "colusa-partnership",
"title": "Colusa partnership, microgrid and sponsor-reported proofs of concept",
"role_in_story": "core",
"stage": "announced partnership; proof-of-concept claim",
"source_event_date": "2026-03-25",
"source_date_role": "Sponsor announcement date; future generation target separate",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"sovereign-compute"
],
"actors_as_stated_in_sources": [
"Colusa Indian Energy",
"Strata Expanse",
"Cachil Dehe Band",
"NVIDIA",
"Supermicro",
"Intel",
"AMD",
"DDN"
],
"documented_connection": "Named project sponsors and technology ecosystem connect to an existing microgrid.",
"source": {
"scope": "workbench",
"path": "Research Packages/Sovereign Compute/SOVEREIGN_SITING_OPERATING_SERVICES_AND_PERMIT_RECORDS_2026-11-18.md",
"sha256": "29797c4bb614ac64a7e6fb7c164fd5e3a61b1745a830e1a99375a08772232a4d",
"quote": "Colusa Indian Energy's March 25, 2026 announcement names Strata Expanse, a planned AI/energy campus on Cachil Dehe Band land, an existing microgrid and proof-of-concept deployments claimed by the sponsors. It names DDN, Supermicro, NVIDIA, Intel and AMD in a technology ecosystem and targets more than 100 MW of later onsite generation."
},
"limit": "Supplier order, customer, capital, accepted equipment and commercial-service instruments remain unproved by this announcement.",
"evidence_vote": "none; source owner controls"
},
{
"id": "cherokee-siting-policy",
"title": "Cherokee report on land, resources and community terms",
"role_in_story": "core",
"stage": "policy study and recommendations",
"source_event_date": "2026-06-30",
"source_date_role": "Report date; August 5 publication is a separate clock",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"sovereign-compute"
],
"actors_as_stated_in_sources": [
"Cherokee Nation",
"Principal Chief’s Task Force on Data Centers"
],
"documented_connection": "Project-specific land, resource and community conditions shape the siting account.",
"source": {
"scope": "workbench",
"path": "Research Packages/Sovereign Compute/SOVEREIGN_SITING_OPERATING_SERVICES_AND_PERMIT_RECORDS_2026-11-18.md",
"sha256": "29797c4bb614ac64a7e6fb7c164fd5e3a61b1745a830e1a99375a08772232a4d",
"quote": "The Cherokee Nation report is dated June 30, 2026; its download page records August 5 publication. It distinguishes land status and direct tribal land-use policy from influence on non-tribal land. It favors workforce/supplier opportunities, cost-causation and enforceable community terms over direct hyperscale investment or tax-arbitrage. Its environmental discussion calls for site-specific power, cooling, water and emissions evidence."
},
"limit": "No project approval, adopted moratorium or blanket jurisdiction ruling.",
"evidence_vote": "none; source owner controls"
},
{
"id": "pocatello-reported-votes",
"title": "Pocatello packet reports denial and reapplication votes",
"role_in_story": "core",
"stage": "reported votes in proposed unsigned disposition",
"source_event_date": "2026-09-17",
"source_date_role": "Vote day recited in October 1 packet; written adoption/execution not established",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"sovereign-compute"
],
"actors_as_stated_in_sources": [
"Pocatello City Council",
"Lex Developments, LLC",
"Portneuf Capital, LLC"
],
"documented_connection": "A specific permit record distinguishes retained denial from waiver of a waiting period.",
"source": {
"scope": "workbench",
"path": "Research Packages/Sovereign Compute/SOVEREIGN_SITING_OPERATING_SERVICES_AND_PERMIT_RECORDS_2026-11-18.md",
"sha256": "29797c4bb614ac64a7e6fb7c164fd5e3a61b1745a830e1a99375a08772232a4d",
"quote": "The official October 1, 2026 consent packet identifies Lex Developments, LLC, Portneuf Capital, LLC and the proposed roughly 59-acre data-center site at 1800 River Park Way. Its CUP section reports a September 17 Council vote of 3–2 to retain the denial and a separate 3–2 vote to waive the twelve-month reapplication wait."
},
"limit": "Blank signature/date fields; no October 1 execution or comprehensive judicial-review finding.",
"evidence_vote": "none; source owner controls"
},
{
"id": "shadeform-service-payment",
"title": "GPU-service USDC payments to merchant bank USD",
"role_in_story": "core",
"stage": "provider-reported service-payment use",
"source_event_date": "2025",
"source_date_role": "Provider says acceptance began in 2025; precise start/publication day unknown",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"private-monetary-stack",
"programmable-and-agentic-payments-2026-09-22",
"ai-infrastructure-capital-stack-risk-transfer"
],
"actors_as_stated_in_sources": [
"Shadeform",
"Stripe",
"GPU-service customer"
],
"documented_connection": "A payment/conversion connection joins compute-service commerce to private dollar claims.",
"source": {
"scope": "workbench",
"path": "Research Packages/Fintech and Private Rails/COMPUTE_AGENT_PAYMENTS_AND_PRIVATE_DOLLAR_JOINS_2026-10-30.md",
"sha256": "e3763fd41bfe4b42db040f5053b22b7727b4663ac87ec240b7aac259b1cf3010",
"quote": "Stripe's [Shadeform customer study](https://stripe.com/customers/shadeform) identifies a GPU cloud marketplace that began accepting USDC in 2025. Stripe says it converts the payment and deposits USD into Shadeform's bank account."
},
"limit": "No inspected specific bank receipt, project-finance draw or blockchain record registry.",
"evidence_vote": "none; source owner controls"
},
{
"id": "nsf-hubs-resource-boundary",
"title": "NSF programme support and consortium-supplied compute",
"role_in_story": "core",
"stage": "programme solicitation; no operating hub established",
"source_event_date": "2026-07-31",
"source_date_role": "Solicitation posting date; proposal, award and actual access clocks separate",
"evidence_through": "2026-11-18",
"source_owner_ids": [
"federal-science-operating-system"
],
"actors_as_stated_in_sources": [
"NSF",
"state and regional consortia",
"research institutions",
"industry",
"philanthropy",
"state and local governments"
],
"documented_connection": "Federal coordination/workforce support is distinct from the infrastructure component supplied by consortia.",
"source": {
"scope": "workbench",
"path": "Research Packages/Federal Science Operating System/NSF_AI_HUBS_COORDINATION_AND_INFRASTRUCTURE_BOUNDARY_2026-11-18.md",
"sha256": "6e67deb43062606545b3a4bba991a147f1d8f15b2bf6f8872c71b7e693220a16",
"quote": "NSF 26-513, posted July 31, 2026, assigns the computing/data/software resource component to state or regional consortia. NSF supports consortium coordination, partnerships, infrastructure professionals and faculty/education work. The solicitation explicitly separates its funded proposal elements from the infrastructure element and expects consortia to secure resources for the award duration. This is not a federal purchase of the consortium's GPU fleet or cloud capacity. [Solicitation](https://www.nsf.gov/funding/opportunities/us-national-science-foundation-state-regional-artificial/nsf26-513/solicitation), introduction, programme-description elements 1–5 and budget instructions."
},
"limit": "No verified awardee roster, paid amount, supplied infrastructure, Genesis merger or operating capacity.",
"evidence_vote": "none; source owner controls"
}
],
"boundary": "A relationship map is not proof of a single platform, a coordinated plan, aggregate project completion, funding addition or DLT adoption."
}