Military direct sites
Window: exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT
Inclusive replay: 2026-09-11 date-only publishers, then dedupe against Weekly Delta 2026-09-11, especially waves/WAVE_2D_MILITARY_DIRECT_SITES.md
Discovery rule: official service, combatant-command, Guard/Reserve, PEO, personnel, acquisition, and operational surfaces. Federal Register is not discovery.
Lane: Purse-military. Do not recensus classified ops.
Already in 1A/1C/2C — fold, do not duplicate as a new atomic
- NNSA Y-12 B61-13 CSA complete (announced 2026-09-10; stamp 2026-09-01) remains a civilian DOE production/acceptance object owned by 09-11 / 2C. No later Pantex assembly-complete or War-acceptance receipt was retrieved on NNSA, Pantex, or service/War pages in this sitting.
- EO 14427 DPA energy delegations are 1A legal / 1C industrial. No in-window War DPA instrument (Title I rated order, Title III award, or allocation) was found on war.gov. Elmet (object 2) is IBAS preferred equity, not DPA.
- EO 14426 Veterans access is 1A legal. No in-window War/VA operating object implementing that EO was retrieved on War or service sites.
- S. 307 Prison Staff Safety Enhancement Act (signed 2026-09-16) is BOP/DOJ (1A). No War confinement overlap was retrieved.
Award ≠ obligation ≠ payment ≠ delivery ≠ fielding ≠ combat effect. 403 ≠ missing. Classified/nonpublic is classified_nonpublic, not inactivity.
Sept. 11 War contracts, posted on the standing 5 p.m. dump, sit after the 09-11 freeze (16:01:37 EDT) and are this window’s objects, not a recensus of 09-11 WAVE_2D.
Promotion-review objects
1. Deputy Secretary Feinberg signed *Fostering One Strong Industrial Base*
Actor: Deputy Secretary of War Steve Feinberg; OUSW(A&S); Cost Accounting Standards Board (proposal target); Office of Strategic Capital; IBAS
Clocks: memorandum signed 2026-09-15. PDF posted same day.
URLs: War release; memorandum PDF
Disposition: promotion_review
Department-wide buying-rules instrument. Directs senior leaders to open competition, confine government-unique cost accounting to the work that requires it, and rely on companies’ existing GAAP/independent audits. Implements EO 14402 (fixed-price default), not EO 14427. Carries forward the Aug 18, 2026 supplier-transparency direction so contracting officers can see through primes to suppliers and connect them to OSC loans, IBAS funds, and Department business operators. Appendix actions include: CAS Board proposal to make exemption the default; immediate use of higher FY26 NDAA cost-accounting thresholds; senior approval before bringing a new business unit under full CAS coverage; commercial determinations within 15 business days; acceptance of independent public-accounting certification in place of separate government business-system review; expanded OTAs and advance market commitments; profit policy tied to value/risk/private capital, not merely cost incurred. “No new organization or compliance framework.” Memo ≠ CAS Board rule, ≠ FAR rewrite, ≠ first commercial award under the new default.
Claim limit: Signed memo ≠ CAS exemption in force ≠ first commercial company newly competing. Implementation clocks remain open.
2. War announced a $450 million IBAS redeemable preferred-equity investment in The Elmet Group (tungsten)
Actor: OASW Industrial Base Policy; Economic Defense Unit; The Elmet Group (Coldwater, MI; Lewiston, ME; Euclid, OH; Nevada upstream)
Clocks: announced 2026-09-14.
URL: War release
Disposition: promotion_review
IBAS redeemable preferred equity, not DPA Title III. Framed as securing the only U.S.-owned fully integrated tungsten/molybdenum producer supporting 100+ War programs (F-35, PAC-3, Trident D5, NGI, PrSM, Virginia/Columbia). Also to establish the only independent ammonium-paratungstate facility in North America. China-share claim in the release: ~85% tungsten / ~40% molybdenum. Expected jobs language is a Department projection, not an observed hire. Investment announcement ≠ mill running ≠ APT plant complete ≠ China-share reduced.
Claim limit: Preferred-equity announcement ≠ cash transferred ≠ processing capacity online ≠ stockpile increase.
3. Army awarded a $1.211 billion IDIQ for Precision Strike Missile Increment 2 Early Operational Capability
Actor: Army Contracting Command, Redstone; Lockheed Martin, Grand Prairie
Clocks: announced on the 2026-09-14 War contracts page. Estimated completion 2031-09-13. One bid solicited, one received.
URL: Contracts for Sept. 14, 2026
Disposition: promotion_review
CPFF/FFP IDIQ for PrSM Increment 2 EOC. Work locations and funding determined with each order. Vehicle for an early operational capability increment, not Increment 1 fielding, not combat use, not a completed EOC unit.
Claim limit: IDIQ ≠ first Increment 2 missile delivered ≠ EOC declared ≠ HIMARS/MLRS loadout observed.
4. Navy awarded MQ-25A Stingray Lot 1 low-rate initial production (three aircraft)
Actor: NAVAIR; Unmanned Carrier Aviation PMA; Boeing, St. Louis
Clocks: War contracts page 2026-09-14 as undefinitized FPI modification P00017 to N0001922C0048, NTE $552,053,000. Navy/War news story 2026-09-15 frames a $562 million FPI Lot 1 award. Obligated at award (contracts page): FY25 APN $100,000,000 + FY26 APN $64,428,480. Work through July 2031. Initial Lot 1 deliveries expected 2029. Milestone C / production-and-deployment approval was announced in May (pre-window).
URLs: Contracts for Sept. 14, 2026; War news story
Disposition: promotion_review
First LRIP lot: three Lot 1 air vehicles plus long-lead for three Lot 2. Program of record 76 air vehicles (4 EDM + 5 SDTA); seven test aircraft currently in production. Pathfinder for carrier-based unmanned tanking. UCA ≠ aircraft delivered ≠ first trap ≠ IOC. Face-value difference between the $552.053M UCA and the $562M news-story figure is unresolved on the two official pages; the contracts page is the obligation instrument.
Claim limit: LRIP UCA ≠ first Stingray on a carrier ≠ organic tanking demonstrated. Deliveries are a 2029 clock.
5. Navy awarded Castelion a first production lot of Blackbeard hypersonic All-Up Rounds
Actor: NAWCAD Lakehurst; DON Rapid Capabilities Office / PAE(A) Aviation Rapid Capabilities Cell; Castelion Corp., Torrance / Rio Rancho
Clocks: War contracts 2026-09-14: FFP order N6833526F1211 against BOA N6833526G0006, $43,650,000, FY25 WPN $44,000,000 obligated, complete September 2028. Navy press release 2026-09-15 frames a SBIR Phase III production delivery order with total value up to $200 million. First production lot: 444 AURs.
URLs: Contracts for Sept. 14, 2026; Navy press release
Disposition: promotion_review
SBIR Phase III production of an air-launched hypersonic strike weapon for carrier-based fighters. Contracts page is the first-lot order; Navy release is a wrapping that states a higher total-value ceiling. Production lot ≠ missiles delivered ≠ fleet loadout ≠ combat use. “Affordable mass” language is program framing, not an inventory count.
Claim limit: First production lot ≠ 444 AURs accepted ≠ hypersonic round on an F/A-18. $43.65M order ≠ $200M ceiling exhausted.
6. Army exercised an $818 million AMPV production modification
Actor: ACC Detroit Arsenal; BAE Systems Land & Armaments, York
Clocks: announced 2026-09-14 as modification PZ0054 to W56HZV-23-C-0024. Cumulative face value $3,298,715,424. ECD 2030-05-31. FY25 and FY26 WTCV funds $818,355,026 obligated at award.
URL: Contracts for Sept. 14, 2026
Disposition: promotion_review
Production-quantity modification on the existing Armored Multi-Purpose Vehicle contract, not a new program, not first article, not fielding of a converted formation.
Claim limit: Modification ≠ vehicles delivered ≠ HBCT conversion complete.
7. Air Force completed Sentinel Pathfinder inert vertical stacking at Vandenberg
Actor: USSF/USAF Sentinel program; AFNWC / PAE ICBM; AFTC 719th Test Squadron; Northrop Grumman
Clocks: AFNS article 2026-09-14 (AFA conference). Four-month test campaign concluded with on-pad vertical integration of an inert LGM-35A. First flight-test Design Review completed in parallel. Initial flight testing 2027; initial capability still early 2030s.
URL: AFNS
Disposition: promotion_review
Hardware/test milestone: inert stack on a test ped, not a fueled flight article, not a silo emplacement, not Minuteman replacement. Digital-to-physical transition claim is the program’s; flight test remains 2027.
Claim limit: Inert Pathfinder stack ≠ first flight ≠ Milestone B complete ≠ silo operational. Early-2030s IOC clock is unchanged.
8. Hawaii Guard moved from Lowell staging into post-storm recovery on Kauai
Actor: Hawaii National Guard Task Force Kauai; Hawaii Emergency Management Agency; Hawaii Food Bank / Eleele Baptist Church
Clocks: 09-11 WAVE_2D owned 194 personnel on SAD as of Sep 7 and Kauai staging for Lowell. This window: food-distribution article 2026-09-15 describing Sep 12 operations after Lowell impact; five distribution sites on Kauai; 225+ vehicles at Eleele (usual 75–125 families). Self-reported additional missions: road clearance, equipment/personnel transport, search and recovery, water distribution, emergency power. State active duty, not Title 10.
URL: Army / HING
Disposition: promotion_review as a later operating clock on the 09-11 Lala/Lowell object. Staging became impact-and-recovery.
Claim limit: SAD food-distribution support ≠ Title 10 call-up. Vehicle count ≠ island-wide recovery complete. Barge-delay anecdote is a Guardsman’s statement, not a DOT/USCG cargo finding.
9. Freedom Edge 26 closed as a U.S.–ROK–Japan trilateral exercise
Actor: USINDOPACOM / U.S. Forces Japan; ROK JCS; Japan
Clocks: five-day exercise; concluded 2026-09-11. Navy/Pacific Fleet story 2026-09-14. Not owned in 09-11 WAVE_2D. Maritime, air, missile-defense, cyber, and medical events south/east of the ROK and at command posts in Japan.
URL: Navy
Disposition: promotion_review as an in-window exercise close that 09-11 did not carry. Close sits on the exclusive-start calendar day; the story is later publication.
Claim limit: Exercise close ≠ new treaty, basing, or missile-defense battery fielded.
10. Army awarded Olin Winchester a $788 million small-caliber ammunition IDIQ
Actor: ACC Rock Island; Olin Winchester, Oxford, MS
Clocks: announced on the 2026-09-11 5 p.m. contracts page (in this window). ECD 2031-09-10. One bid solicited, one received. Work locations and funding with each order.
URL: Contracts for Sept. 11, 2026
Disposition: promotion_review
FFP / FPEPA IDIQ for 5.56mm, 7.62mm, and .50-caliber ammunition. Industrial-base production vehicle, not rounds delivered, not a new caliber, not a plant standing up.
Claim limit: IDIQ ceiling ≠ ammunition in inventory. Orders, not the ceiling, will move money.
Folded or clock-only (do not recensus as new actions)
| Object | Owner | This delta |
|---|---|---|
| NNSA Y-12 B61-13 CSA complete (stamp 2026-09-01; announced 2026-09-10) | 09-11 / 2C civilian DOE | Fold. NNSA/Pantex sites retrieved; no later assembly-complete or War-acceptance clock. CSA ≠ Pantex assembly ≠ War acceptance ≠ deployed B61-13. |
| EO 14427 DPA energy delegations | 1A / 1C | No War DPA Title I/III instrument in this window. Elmet is IBAS. Last retrieved War DPA Title III on war.gov remains out of window (BAE RH45 July 7). |
| EO 14426 Veterans access | 1A | No War/VA operating object retrieved. |
| S. 307 Prison Staff Safety Enhancement Act | 1A BOP/DOJ | No War confinement overlap. |
| Crane MMR planned installation NLT Sep 2028 | 09-11 WAVE_2D | Fold. No later site-work/NRC clock. |
| JASSM/LRASM $826M P00020; IMX-104 Nitradyn IDIQ; NGEAU FRP; MK 48 MOD 7 options; DARC Site 3 preferred location | 09-11 WAVE_2D | Fold. Sep 14 LM JASSM tooling mod ($13.2M) is grouped sustainment on the same family, not a new lot. |
| Super Garuda Shield 26 (kickoff through Sep 11 live fire) | 09-03 / 09-11 WAVE_2D | Later clock: closing ceremony 2026-09-11, Army article 2026-09-12. Same exercise. Do not recensus kickoff or live fire. Army |
| Phoenix Express 2026 start Sep 7 | 09-11 WAVE_2D | Later clock: at-sea phase began Sep 11 from Bizerte/La Goulette. Navy story 2026-09-15. Exercise start was already owned. |
| Yama Sakura 91 close; Hawaii Lala SAD count as of Sep 7; Washington wildfire close; Kilmer keel | 09-11 WAVE_2D | Fold. Hawaii Lowell recovery is object 8, not a recensus of the Sep 7 SAD count. |
| CCA Increment 1 production contracts (June); live-fire / Creech ACE (July) | pre-window AFNS | Naming only this window (FQ-42 Vengeance / FQ-44 Fury, Sep 14). Production entry and live fire are prior. See grouped. |
| B-52J CERP Milestone B (June 1) and RMP Milestone C / LRIP (Aug 21) | pre-window | AFNS Sep 15 wrapping of those earlier ADMs. Fold the decisions; do not treat the conference story as a new MS B/C. |
| ACC-RI Cornerstone OTA ~$25M same-day awards at DIB Exchange | event Aug 25–27 | Army article 2026-09-16 is later wrapping of pre-window prototype awards (5N+, Graystone, Kunin, Senra, Neya, Cybernet). Fold. |
| DLA Distributed Production Wargame | event Sep 1–3 | DLA article 2026-09-16 is later wrapping of a pre-exclusive-start tabletop. Fold the event; CRMN (FY26 NDAA) is statute, not this window’s standing-up. |
| DARC Site 3 Lake Kickapoo preferred location | 09-11 WAVE_2D | Fold. |
| Schiess CSO installation | 09-03 / 09-11 | Fold. Sep 16 AFA priorities speech is leadership messaging, not force-structure change. |
| MARADMIN 408/26, 410/26, 411/26 | 09-11 WAVE_2D | Fold. 411/26 timestamp R 111400Z is the 09-11 object. |
Additional in-window objects (lower rank or grouped)
War contracts clustered — Sept. 11, 14, 15 (not each a new atomic)
Sept. 11 (in-window 5 p.m. dump):
- Boeing $13.4B ceiling modification P00008 to FA8609-19-D-0007 adding FMS scope (Japan, Israel, future partners); total ceiling $19.1B from $5.7B; no funds obligated. Ceiling ≠ aircraft sold ≠ FMS LOA executed.
- Blue Halo $99.8M ceiling LOBO space-systems R&D IDIQ (AFRL Kirtland); $1.70M FY26 RDT&E obligated on two task orders.
- Rolls-Royce Solutions America $39.1M modification for Eitan power packs (FMS Israel).
- Onebrief $20M commercial-software IDIQ (ECD later corrected on Sep 15 page to 2031-09-10).
- Northrop Grumman Radford $19,999,798 non-standard ammunition IDIQ — withdrawn on the Sep 15 page (“was not actually awarded”).
- CAE USA Royal Moroccan Air Force F-16 Block 72 trainer: announced Aug 31, actually awarded Sep 11 (correction on Sep 14 page). FMS trainer ≠ aircraft delivered.
- P-8A Virtual Maintenance Trainer Increment 3 Block 2 update (American Systems $30.6M, incl. RAAF funds); AN/SPG-62 AEGIS reflectors (GDMS $11.5M, FMS Spain/Australia); DLA B-2 hot trailing edges; Hensoldt North America radar contract date/value correction to Sep 11 / $65.5M; SOCOM Obsidian JHDTP $9.3M. Grouped.
- Civil-works beach/jetty/dredge lines (Anna Maria, Columbia River North Jetty, Houston Ship Channel, Brazos Island) are USACE civil, not force structure.
Sept. 14:
- NAMC AGT 1500 Abrams-engine OTA, $2.5B ceiling, $11,831,430 FY26 RDT&E obligated, ECD 2029-03-14. Ceiling ≠ engine upgraded on the fleet.
- Hensel Phelps $99.05M GBSD Integrated Training Center MILCON at F.E. Warren (ECD 2029-10-15). Construction award ≠ training center in service.
- Lockheed Martin $97.6M undefinitized MLRS recapitalization (Camden / Grand Prairie / New Boston). UCA ≠ launchers recapped.
- MICC $1.051B facility-sustainment MAC (41 small-business awardees); JFL Consulting $61.6M USNO precise-time security IDIQ; Bell-Boeing ODSSHI V-22 kits $35.5M (incl. FMS Japan); Seemann Composites Virginia-class propulsor IDIQ $31.3M; NG Link-16 UH-1Y/AH-1Z ceiling increase (also restated Sep 15); DLA Boeing ICBM door launchers $16.2M. Grouped. Door launchers ≠ Sentinel fielding.
Sept. 15:
- Clark $117.8M Fort Myer UEPH barracks MILCON; Walsh $73.7M JBLM secure-operations facility (FY10 MILCON); Great Lakes Dredge civil harbor program; Akima $17.9M modification for cavalry-to-HBCT equipment induction/repair. Construction/repair ≠ barracks occupied ≠ HBCT converted.
- DLA: Dove Medical $330M ECAT add; Collins Engine Nozzles J-85 nozzles $78.0M and spray bars $70.3M; Kandor coats/trousers option; Elegant Stitches AGSU shirts; Robertson V-22 tanks. Commodity/sustainment.
Sept. 16 contracts dump: not confirmed posted/retrieved before freeze. Index is a JS shell. GlobalSecurity’s 16 Sep daily listed only the Sept. 15 dump. Treat as unread, not empty.
Force posture / movement / exercises (statement ≠ movement ≠ engagement)
- JTF Southern Border / Operation Ardent Vanguard (War story 2026-09-16): 62nd Engineer Battalion emplaced concertina/razor on Hesco in National Defense Area 2 near Fort Hancock, TX. Commander cites 14 weeks of barrier work. Reinforcement of existing NDA barriers, not a new Title 10 order and not a completed border system. War story
- U.S.–Germany statement of intent on defense-industrial cooperation, signed 2026-09-15 at the Pentagon (Hegseth / Pistorius). Aligns Warfighting Acquisition System reforms with Germany’s Procurement Acceleration Act. SOI ≠ treaty, co-production line, or FMS case. German F-35A “rollout this Friday” is a German event, not a U.S. delivery. War story; transcript
- WGS MOU Amendment Three signed with 10 international partners (Space Force story 2026-09-12). Multilateral SATCOM MOU amendment ≠ satellite launched ≠ new partner funded. Full amendment text not retrieved.
- Southern Vanguard 26 (Peru; War/Army stories Sep 14–15): jungle training with Peru/Chile. Exercise ≠ deployment.
- Saber Junction 26 air-defense integration story Sep 13: ongoing Europe exercise, not a new rotation.
- Patriot 2026 Kentucky Guard wrap (exercise was Aug 24–31): later publication of a pre-window event. Fold as exercise close already outside exclusive start.
- Operation Sunset Canopy (351st CACOM, Sep 11, Los Alamitos): Reserve airborne demonstration. Training ≠ force-structure change.
- POW/MIA Recognition Day ceremony advisory for Sep 18 (after cutoff). Media advisory only.
Personnel / recruiting / civilian workforce
No in-window RIF instrument, civilian-workforce cut order, or recruiting-mission-change MARADMIN/DAFI was retrieved.
- NAVADMIN 213/26 (2026-09-16): authorization of Combat Action Ribbon, Strike/Flight Air Medal, and V/C/R devices for Operation Epic Fury. Awards-eligibility instrument for a prior named operation (Feb–Apr 2026), not a new engagement and not a strength change. Index: MyNavy HR NAVADMIN 2026. Full message PDF not opened this sitting.
- NAVADMIN 211/26 FY27 STA-21 selection; 210/26 NFAAS update — routine personnel admin.
- NAVADMIN 208/26 (Sep 8, pre-exclusive-start): order to account for personnel ICO Hurricane Lowell. Accountability order, not a new activation. Fold as pre-window unless a later accountability close appears (none retrieved).
- Space Force FY27 Interservice Transfer window Sep 15–Oct 2. Solicitation ≠ accessions.
- AETC “1,500-pilot goal” (AFNS 2026-09-15): on-track FY26 undergraduate-pilot throughput under FUPT; shortfall still cited at ~2,407. Training-pipeline status, not an end-strength change and not 1,500 already winged this FY as a closed count.
- CCA popular names FQ-42 Vengeance / FQ-44 Fury (SecAF keynote Sep 14). Naming ≠ production (June) ≠ 150 Increment 1 aircraft delivered ≠ 500 by 2032.
- MARADMIN 415/26 (R 141918Z SEP 26): updated COTS ammunition/explosives policy for Marine Corps Shooting Team (Quantico) and EOD air-show support; cancels 455/23. Policy for a narrow user set, not a Class V(W) inventory action. Print
- MARADMIN 414/26 CY27 DARPA Service Chiefs Fellowship — personnel solicitation.
- MARADMIN 411/26 / 410/26: 09-11 owned (Innovation Challenge round 2; Congressional Fellowship results).
Space Force acquisition / organization
- Space Technology Portfolio Executive established (ASAF/SQ announcement, AFNS/Space Force Sep 15). New PE seat to accelerate emerging space capability. Organization announcement ≠ first PE award.
- SCAR Commercial Solutions Opening strategy (Space Force Sep 16): CSO acquisition strategy for Satellite Communications Augmentation Resource / satellite C2. Strategy ≠ awarded CSO, ≠ on-orbit capability.
- CSO Schiess AFA priorities (ethos / arm / integrate) and “double in size over five years” remarks: leadership intent, not a programmed end-strength decision.
DARPA / DIU
- DARPA D2 Sprint (news 2026-09-14): $1M prize competition (Documentation and Decision Support) for AI medical documentation/decision support; team qualifications opened Sep 10; Industry Day Sep 22 (after cutoff for the event itself). Prize announcement ≠ tool fielded. DARPA
- DARPA events calendar: Firefox Proposers Day Sep 21; NGHCM / D2 / Surgical Industry Days Sep 22; Hubble Sep 25; APM / BEAMERS Sep 30 — all after cutoff or open solicitations. SBIR topics still closing Sep 23 / opening Sep 23. Solicitation ≠ award.
- DIU: no in-window project-spotlight award retrieved (last retrieved JSDT awards were July 9 / January–June). Empty dated in-window as a news object, not inactivity.
2026-09-11 date-only replay (then dedupe)
Reached: Sept. 11 War contracts dump (kept — 5 p.m. is after 09-11 freeze); MARADMIN 410/26 and 411/26 (fold — 09-11 owned); ceremonial 9/11 Pentagon observance (reject as ceremonial); CAE Morocco award-date correction (grouped). Super Garuda close and Freedom Edge close sit on Sep 11; SGS close is a later clock on an owned exercise, Freedom Edge close is new to this wave (object 9).
09-11 WAVE_2D already owned Crane MMR, JASSM/LRASM P00020, Nitradyn IMX-104, NGEAU FRP, MK 48 options, DARC Site 3, Hawaii SAD/Lowell staging, Washington wildfire close, SGS live fire, YS91 close, Phoenix Express start, Kilmer keel. Those are not new atomics.
09-11 hole retry (Sept. 3 / 4 / 8 dedicated contract pages; af.mil; dla.mil)
Dedicated War contract pages for Sept. 3, 4, and 8: still unread as official HTML from this host. The contracts index remains a JS shell (“simulated response” / Load More). Curl to war.gov/defense.gov article URLs returns Akamai 403. open_page retrieved Sept. 11/14/15 in full; it did not land dedicated Sept. 3/4/8 slugs. Secondary snippets quoting the Sept. 4 dump (not a substitute for the official page) name:
- Huntington Ingalls / Newport News $336,112,000 cost-only UCA for CVN 82 (USS *William J. Clinton*) long-lead materials; FY26 SCN obligated; ECD March 2039; 10 U.S.C. 3204. HII’s own release is 2026-09-11. Advance procurement ≠ keel ≠ construction start (HII cites planning for a 2027 keel as program talk, not this award’s completion). Because the official Sept. 4 page was a 09-11 unread hole, record the object as hole-retry recovered from secondary/company text, official page still unread.
- MDA Northrop Grumman Chandler ~$508.5M follow-on IRBM/ICBM target flight-test support (HQ0855-26-C-E001) — secondary snippet only.
- DLA Pentaq Manufacturing ~$763M IDIQ for physical fitness gear — secondary snippet only.
- Griffon Outlaw remains the Sep 4 announcement / Sep 8 actual award already corrected on the 09-11 Sep 10 page.
Do not promote CVN 82 / MDA targets / Pentaq as this-window atomics until the official Sept. 4 page is read. They are 09-11-window awards that this sitting still cannot certify from war.gov HTML.
af.mil: curl/Akamai 403 from this host on some flagship URLs; reached this sitting via search, print handlers, and open_page (Sentinel Pathfinder, CCA naming, AETC 1,500, B-52 wrapping, AFA keynotes). A 403 on one path is not inactivity.
dla.mil: curl 403 from this host on some paths; reached this sitting via search (Industry Collider Day Sep 9 event / Sep 16 story; Risk-to-Readiness logistics summit Sep 9–10 / Sep 11 story; Distributed Production Wargame Sep 1–3 / Sep 16 wrapping). No distinct in-window DLA production/finance object beyond War-contracts commodity lines.
Bounded negatives
- No public War DPA Title I/III instrument after exclusive start.
- No public B61-13 Pantex assembly-complete or War-acceptance receipt.
- No public IOC / fielding claim that is not an exercise, experiment, naming, or test-stack (Sentinel Pathfinder is inert; MQ-25/Blackbeard/PrSM Inc 2 are production vehicles; CCA names are names).
- No Title 10 Guard/Reserve call-up instrument. Hawaii Lowell recovery remains state active duty.
- No in-window War implementing instrument for EO 14427 or EO 14426.
- No census of SAM.gov, FPDS, USAspending, classified OTAs, or every PEO.
Surfaces
| Surface | Status | Note |
|---|---|---|
| war.gov Contracts Sept. 11 | reached | Full text via open_page. In-window 5 p.m. dump. |
| war.gov Contracts Sept. 14 | reached | Full text via open_page (Army through DHA). |
| war.gov Contracts Sept. 15 | reached | Full text via open_page. Includes Onebrief ECD correction and NG Radford withdrawal. |
| war.gov Contracts Sept. 16 | unread / not confirmed posted | Index JS shell; no dedicated page retrieved before freeze. Not treated as empty. |
| war.gov Contracts Sept. 3, 4, 8 | unread as dedicated pages | 09-11 hole not closed. Curl 403; index JS. Secondary snippets only for Sept. 4. |
| war.gov Releases | reached | Elmet IBAS; Feinberg memo; 9/11 ceremonial fold |
| war.gov News Stories / Transcripts | reached (selected) | MQ-25 story; Germany SOI; JTF-SB barriers; 9/11 observance |
| army.mil news | reached | SGS close; Hawaii Lowell recovery; Southern Vanguard; ACC-RI wrapping; Sunset Canopy |
| navy.mil Press Releases / News Stories | reached | Blackbeard production; Freedom Edge close; Phoenix Express at-sea; MQ-25 wrapping |
| marines.mil News | reached (thin) | No distinct in-window operational atomic beyond MARADMINS |
| marines.mil MARADMINS | reached | 415/26, 414/26 in-window; 410/26–411/26 fold |
| af.mil News | reached via search/print/open_page; curl 403 on some flagship URLs | Sentinel Pathfinder; CCA names; AETC 1,500; B-52 wrapping. 403 ≠ inactivity. |
| spaceforce.mil News | reached (index/search) | WGS Amendment Three; Space Technology PE; SCAR CSO strategy; IST window; Schiess AFA remarks. Some guessed article slugs 404’d. |
| nationalguard.mil News | reached (index/search) | Hawaii Lowell later clock taken from army.mil; Patriot 26 is pre-window wrap |
| darpa.mil/news | reached | D2 Sprint announcement; remaining items are open events/SBIR clocks |
| diu.mil | reached; empty dated in-window news | Last retrieved awards July 9 |
| dla.mil News | reached via search; curl 403 on some paths | Wrapping of pre-window wargame/summit; no distinct production object |
| nnsa.energy.gov / pantex.energy.gov | reached | No post-CSA B61-13 later clock. Pantex homepage is people/9-11 features. |
| mynavyhr.navy.mil NAVADMIN index | reached (index) | 213/26 titled; full PDF unread |
| SAM.gov / FPDS / USAspending | not recensus’d | Bounded negative |
| Classified / nonpublic ops | classified_nonpublic | Not inactivity |
Coverage receipt
| Publisher family | Status | Missed (new) | Enrichment / clock | Routine/reject |
|---|---|---|---|---|
| War contracts (business-day $7.5M+) | mixed: Sep 11/14/15 reached; Sep 16 unread; Sep 3/4/8 dedicated pages still unread | 4 promoted production/industrial (PrSM Inc 2; MQ-25 LRIP; Blackbeard lot; Olin ammo) | AMPV mod promoted; NAMC/GBSD ITC/MLRS UCA grouped; NG Radford withdrawn | civil-works; clothing; ECAT add-ons |
| War releases / news | reached | 2 (Feinberg memo; Elmet IBAS) | Germany SOI; JTF-SB barriers | ceremonial 9/11; POW/MIA advisory for Sep 18 |
| Army flagship | reached | 1 (HI Lowell recovery clock) | SGS close; Southern Vanguard | ACC-RI Aug wrapping; Sunset Canopy |
| Navy press + numbered fleets | reached | 2 (Blackbeard wrapping as production lot; Freedom Edge close) | Phoenix Express at-sea | CNO/AFA adjacent |
| Marines news + MARADMINS | reached | 0 | 1 (415/26 COTS A&E policy) | fellowship/challenge |
| Air Force flagship | reached this sitting via search/print | 1 (Sentinel Pathfinder stack) | CCA names; AETC 1,500 | B-52 MS wrapping; AFA keynotes |
| Space Force flagship | reached (index) | 0 promoted | WGS Amd 3; Space Tech PE; SCAR CSO strategy | Schiess speech; IST window |
| National Guard | reached | 0 new atomics (HI is later clock) | Lowell recovery | Patriot 26 pre-window |
| DARPA / DIU | reached | 0 | D2 prize announcement | open SBIR/event clocks |
| DLA news | reached via search | 0 | 0 | pre-window wargame wrapping |
| NNSA / Pantex | reached | 0 | 0 | CSA fold; no Pantex later clock |
| Award systems | not enumerated | — | — | bounded |
Closed: no for a complete business-day contracts series (unread dedicated pages still: Sept. 3, 4, 8; Sept. 16 dump not confirmed). Yes for the named service newsrooms actually retrieved (Army, Navy press, Marines MARADMINS, Air Force via search/print, Space Force index, Guard index, War releases, DARPA news, NNSA). Named unread or blocked publishers: dedicated War contract pages for Sept. 3/4/8, Sept. 16 contracts if posted, NAVADMIN 213/26 full PDF, WGS Amendment Three full text, Feinberg appendix beyond the release HTML (PDF URL retrieved, full appendix not line-read). Those are tool-path or scope bounds, not inactivity findings.
This is public-surface research, not a census of every contract, PEO, COCOM action, field outcome, or classified operation.
Sources
Full saved reading
View cited sources (17)
These are the sources cited by this reading. Each source keeps its own date and scope.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Original title: Wave 2D — military direct sites