Skip to content

National security technology HIDDEN REFEREE AND DECISION RECORD DEEP DIVE REGISTRY 2026-08-19

{
  "title": "NSSTS Hidden Referee and Decision-Record Deep-Dive Registry",
  "as_of": "2026-08-19",
  "status": "pending_workbench_evidence",
  "purpose": "Resolve the companies and institutions that render test stimuli, produce or custody acceptance evidence, write technical-resource records, operate range infrastructure, move regulated material, insure projects, or otherwise condition a decision without necessarily appearing as a prime awardee.",
  "governance": {
    "exact_entity_and_entity_clock_required": true,
    "ownership_seam_is_not_demonstrated_conflict": true,
    "evidence_producer_is_not_decision_authority": true,
    "adjacent_task_is_not_science_strategy_target_assignment": true,
    "qualified_person_is_issuer_retained_not_regulator_appointed": true,
    "package_certificate_holder_is_not_carrier_or_target_contractor": true,
    "automatic_monitoring_active": false,
    "investment_use": false,
    "vault_or_observatory_promotion_authorized": false
  },
  "waves": [
    {"wave": 1, "scope": "Ownership, independence and role-compression seams", "case_count": 10},
    {"wave": 2, "scope": "PNT test-truth constitution and private evidence functions", "case_count": 4},
    {"wave": 3, "scope": "Range task-order shadows and delegated operating rails", "case_count": 9},
    {"wave": 4, "scope": "Critical-minerals qualified-person and technical-report networks", "case_count": 7},
    {"wave": 5, "scope": "Commercial-fusion custody, transport, waste and insurance pathways", "case_count": 8}
  ],
  "role_seams": {
    "R1": "designs or supplies the object it later calibrates or tests",
    "R2": "advises or remediates before an assessment in the same corporate family",
    "R3": "studies or specifies while an affiliate may implement",
    "R4": "produces evidence but is mistaken for the decision authority",
    "R5": "standards, certification, insurance or finance share a corporate family",
    "R6": "acquisition, divestiture, trade name or novation obscures the performing entity",
    "R7": "vendor controls raw evidence or a proprietary transformation needed to reproduce the result",
    "R8": "foreign ownership or protected-data access requires a separate review from technical competence",
    "R9": "market concentration weakens practical second-source choice"
  },
  "cases": [
    {
      "id": "ref-spirent-keysight-viavi",
      "wave": 1,
      "sector": "PNT and communications test",
      "entities": ["Spirent Federal Systems, Inc.", "Keysight Technologies, Inc.", "VIAVI Solutions Inc."],
      "entity_clock": "Keysight acquired Spirent Communications plc on 2025-10-15; on 2025-10-16 VIAVI acquired specified Ethernet, network-security and RF-channel-emulation lines, while PNT and satellite-positioning simulation remained with Keysight.",
      "role": "Generate PNT/NAVWAR scenarios and other test evidence; current product-line ownership determines the responsible seller and custodian.",
      "seams": ["R4", "R6", "R7", "R9"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Exact product line and seller, target test plan, authorized-signal approval, approved truth library, raw I/Q custody, independent witness and government disposition.",
      "disconfirmers": ["VIAVI did not acquire Spirent PNT", "DOJ competition findings addressed three divested markets and do not prove impaired PNT test integrity", "An installed simulator does not establish target use or acceptance"],
      "sources": ["https://investor.keysight.com/investor-news-and-events/financial-press-releases/press-release-details/2025/Keysight-Technologies-Completes-Acquisition-of-Spirent-Communications-PLC/default.aspx", "https://www.viavisolutions.com/en-us/news-releases/viavi-closes-acquisition-spirent-communications-plcs-high-speed-ethernet-network-security-and", "https://www.justice.gov/opa/pr/justice-department-requires-keysight-divest-assets-proceed-spirent-acquisition"]
    },
    {
      "id": "ref-quanta-danovo",
      "wave": 1,
      "sector": "Grid studies and commissioning",
      "entities": ["Quanta Technology, LLC", "Danovo Energy Solutions", "Danovo Energy Solutions, LLC", "Quanta Services, Inc."],
      "entity_clock": "California fictitious-name evidence identifies Quanta Technology, LLC as owner of the Danovo trade name, while Quanta's 2025 subsidiary exhibit separately lists Danovo Energy Solutions and Danovo Energy Solutions, LLC.",
      "role": "Large-load studies, protection/control testing, digital simulation, commissioning and utility coordination.",
      "seams": ["R3", "R4", "R6"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Target W-9 or contract, model/task, affiliate-role matrix, Quanta-family bid disclosure, OCI terms and accepted utility disposition.",
      "disconfirmers": ["No target-specific conflicting Quanta-family roles were found", "Family ownership does not invalidate engineering work", "The trade name does not by itself identify the award recipient"],
      "sources": ["https://investors.quantaservices.com/sec-filings/all-sec-filings/content/0001050915-26-000006/pwr-ex211x12x31x2025.htm", "https://quanta-technology.com/about-us/", "https://www.dailyrecorder.news/LegalNotices/SAC-2026-02-03.pdf"]
    },
    {
      "id": "ref-entrust-leidos",
      "wave": 1,
      "sector": "Utility and federal engineering",
      "entities": ["EN Engineering, LLC", "ENTRUST Solutions Group", "Leidos, Inc."],
      "entity_clock": "Leidos acquired KENE Parent, Inc., the ENTRUST parent, on 2026-03-27 for approximately $2.4 billion.",
      "role": "Utility design, asset integrity, automation, program management and owner-engineering evidence within a larger federal integrator.",
      "seams": ["R2", "R3", "R6"],
      "fit": 3,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Exact EN Engineering, ENTRUST or Leidos entity; target role matrix; affiliate bids; OCI plan; reliance language and owner acceptance.",
      "disconfirmers": ["Leidos says the combination avoids construction exposure", "No target-specific self-review was found", "Acquisition proximity does not establish an award"],
      "sources": ["https://investors.leidos.com/static-files/37a8cfee-bfd7-44fb-a182-c3e11d4d8d93", "https://www.leidos.com/insights/leidos-completes-24-billion-acquisition-entrust"]
    },
    {
      "id": "ref-nsimi-ametek",
      "wave": 1,
      "sector": "Antenna, radome and RCS test",
      "entities": ["NSI-MI Technologies, LLC", "AMETEK, Inc."],
      "entity_clock": "AMETEK acquired NSI-MI Technologies on 2021-05-04; NSI-MI Technologies, LLC remains the operating entity.",
      "role": "Design and supply ranges and instrumentation, calibrate installed systems, develop test plans, run tests and provide analyzed reports.",
      "seams": ["R1", "R4", "R7"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Exact accredited method/site, independent golden reference, owner-controlled raw near-field data and transformations, independent witness and separate acceptance authority.",
      "disconfirmers": ["ISO/IEC 17025 scope is a material competence safeguard", "Accreditation is method-specific rather than blanket system certification", "No manipulated result was found"],
      "sources": ["https://investors.ametek.com/news-releases/news-release-details/ametek-acquires-nsi-mi-technologies", "https://www.nsi-mi.com/test-services/what-we-do", "https://www.nsi-mi.com/customer-support/rf-system-calibration"]
    },
    {
      "id": "ref-nts-element-temasek",
      "wave": 1,
      "sector": "Environmental and qualification testing",
      "entities": ["NTS Labs, LLC", "National Technical Systems, Inc.", "Element Materials Technology", "Temasek Holdings (Private) Limited"],
      "entity_clock": "Element acquired NTS on 2022-09-22; Temasek reported an 88% interest in Element as of 2026-03-31. Accreditation may identify NTS Labs, LLC rather than the legacy brand.",
      "role": "Environmental, EMI/EMC, shock, vibration, materials and space/defense qualification evidence.",
      "seams": ["R4", "R6", "R8", "R9"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Exact performing entity and lab, accreditation scope, data-handling approval, foreign-ownership review if required, witness plan and accepted report.",
      "disconfirmers": ["Temasek says Singapore's government does not direct portfolio-company operations", "Foreign state-linked ownership does not prove impaired judgment", "Legacy NTS examples do not establish a current target assignment"],
      "sources": ["https://www.element.com/about-element/news/2022/09/22/element-acquires-nts", "https://www.temasek.com.sg/en/our-investments/our-portfolio", "https://www.temasek.com.sg/en/about-us/faqs"]
    },
    {
      "id": "ref-intertek",
      "wave": 1,
      "sector": "Data-center commissioning and product certification",
      "entities": ["Intertek Testing Services NA, Inc.", "Intertek Group plc"],
      "entity_clock": "Intertek Testing Services NA, Inc. is the exact U.S. OSHA-recognized NRTL within the public Intertek group.",
      "role": "Advise, commission, test, inspect and certify across an asset lifecycle.",
      "seams": ["R2", "R4", "R5", "R6"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Exact entity, site, standard and scope; separate advisory and certification personnel; impartiality disclosure; owner acceptance distinct from the certificate.",
      "disconfirmers": ["NRTL recognition is standard- and site-scoped", "The Intertek group does not imply one team performs every service", "No target self-certification was found"],
      "sources": ["https://www.intertek.com/datacenters/", "https://www.osha.gov/nationally-recognized-testing-laboratory-program/its"]
    },
    {
      "id": "ref-fm-approvals",
      "wave": 1,
      "sector": "Certification, risk engineering and insurance",
      "entities": ["FM Approvals LLC", "Factory Mutual Insurance Company"],
      "entity_clock": "FM Approvals LLC is the separate OSHA-recognized certification entity within the Factory Mutual family.",
      "role": "Produce product/loss-prevention certification while related FM risk engineering and insurance may separately condition treatment of an asset.",
      "seams": ["R4", "R5", "R6"],
      "fit": 3,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Separate approval certificate, engineering recommendation, owner response and bound-policy record, with exact product and standard.",
      "disconfirmers": ["FM Approvals has separate legal and NRTL status", "No improper tying of certification to coverage was found", "Insurance recommendations are not government acceptance"],
      "sources": ["https://www.osha.gov/laws-regs/federalregister/2021-03-05-7", "https://www.osha.gov/nationally-recognized-testing-laboratory-program/current-list-of-nrtls", "https://www.fm.com/About-Us/Our-Financials"]
    },
    {
      "id": "ref-transcat",
      "wave": 1,
      "sector": "Calibration and laboratory services",
      "entities": ["Transcat, Inc.", "Essco Calibration Laboratory, LLC", "Martin Calibration, LLC"],
      "entity_clock": "Transcat acquired Martin Calibration effective 2024-12-10, Essco on 2025-08-05 and SCM Metrology in April 2026.",
      "role": "Accredited calibration, field service, asset-program consulting, instrument distribution/rental and management of specialist subcontracting.",
      "seams": ["R1", "R6", "R7", "R9"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Exact lab and scope, CMC, equipment ownership, subcontractor identity, as-found/as-left data and accepted conformity rule.",
      "disconfirmers": ["Selling and calibrating instruments is common", "ISO/IEC 17025 can manage the seam when scoped correctly", "No target assignment or improper result was found"],
      "sources": ["https://www.sec.gov/Archives/edgar/data/99302/000143774926018588/trns20260328_10k.htm", "https://www.sec.gov/Archives/edgar/data/99302/000120677425000540/trns4517241-8k.htm"]
    },
    {
      "id": "ref-schellman",
      "wave": 1,
      "sector": "Cyber and information assurance",
      "entities": ["Schellman Compliance, LLC", "Schellman & Company, LLC"],
      "entity_clock": "Goldman Sachs Alternatives announced a strategic investment on 2026-03-05; Lightyear became a minority investor. The public release does not establish Goldman's percentage or sole control.",
      "role": "FedRAMP 3PAO, CMMC, ISO, PCI and related assessment evidence.",
      "seams": ["R2", "R4", "R6", "R9"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Exact assessment entity, prior-services screen, assessor-team independence, report and government authorization or certification.",
      "disconfirmers": ["FedRAMP lists Schellman Compliance as assessment-only", "No consulting to assessed CSPs is reported under the FedRAMP policy", "Goldman's stake is unquantified publicly"],
      "sources": ["https://am.gs.com/en-se/advisors/news/press-release/2026/schellman-private-equity", "https://www.fedramp.gov/marketplace/assessors/136571/", "https://www.schellman.com/services/federal-compliance/fedramp/business-policy"]
    },
    {
      "id": "ref-lake-shore",
      "wave": 1,
      "sector": "Cryogenic metrology",
      "entities": ["Lake Shore Cryotronics, LLC", "DwyerOmega", "Arcline Investment Management"],
      "entity_clock": "DwyerOmega acquired Lake Shore on 2026-06-10; current branding uses Lake Shore Cryotronics, LLC while older certificates use Inc.",
      "role": "Manufacture cryogenic temperature and magnetic instrumentation and produce serial-specific calibration evidence.",
      "seams": ["R1", "R6", "R7"],
      "fit": 4,
      "path": 1,
      "evidence": "A",
      "target_status": "no_public_science_strategy_target_referee_assignment_found",
      "missing_gate": "Current LLC/W-9, accreditation-continuity confirmation, exact scope, serial curve, operating-point uncertainty and independent in-situ cross-check.",
      "disconfirmers": ["OEM calibration is normal under ISO/IEC 17025", "Sensor calibration does not certify the assembled quantum system", "No target assignment was found"],
      "sources": ["https://www.lakeshore.com/about-us/press-releases/2026/06/10/arcline-backed-dwyeromega-acquires-lake-shore-cryotronics", "https://www.lakeshore.com/about-us/iso-certifications"]
    },
    {
      "id": "pnt-talenx",
      "wave": 2,
      "sector": "Resilient PNT",
      "entities": ["Talen-X, Inc. d.b.a. Safran Federal Systems", "Orolia Government Systems, Inc.", "Safran S.A."],
      "entity_clock": "Safran acquired Orolia on 2022-07-08. The Safran Federal Systems brand includes separately caged Talen-X and Orolia Government Systems proxy entities.",
      "role": "Render authorized M-Code-capable, CRPA/wavefront, jamming, spoofing and I/Q scenarios through BroadSim/Skydel systems.",
      "seams": ["R4", "R7", "R8"],
      "fit": 4,
      "path": 3,
      "evidence": "A",
      "target_status": "supported_federal_comparable_no_public_science_strategy_target_assignment",
      "missing_gate": "Target task, government-furnished threat library, protected-signal authority, CDRL for raw configuration/IQ/calibration and independent CIGTF/JNWC/OTA review.",
      "disconfirmers": ["Proxy status permits cleared work but confers no sovereign authority", "Vendor-built representative threats are not official threats", "Simulator installation does not prove acceptance use"],
      "sources": ["https://www.safranfederalsystems.com/proxy-information", "https://www.safran-group.com/pressroom/safran-acquires-orolia-and-plans-become-world-leader-resilient-pnt-2022-07-08", "https://sam.gov/opp/09226e12eae240dcbd8ca9ce53970d1b/view"]
    },
    {
      "id": "pnt-navsys",
      "wave": 2,
      "sector": "Resilient PNT",
      "entities": ["NAVSYS Corporation"],
      "entity_clock": "Independent Colorado Springs small business; strongest public simulator award is a 2001 SBIR, while current alternate-PNT cohort participation is newer.",
      "role": "Hybrid GNSS/RF simulation, raw-sensor record/replay and resilient-PNT integration.",
      "seams": ["R4", "R7"],
      "fit": 3,
      "path": 3,
      "evidence": "B",
      "target_status": "supported_federal_comparable_no_public_science_strategy_target_assignment",
      "missing_gate": "Current SSC or 746th deliverable, named tool use, government-owned scenario/IQ package and independent range validation.",
      "disconfirmers": ["The strongest simulator award is old", "Current work may emphasize NAVSYS products rather than independent test", "No target assignment was found"],
      "sources": ["https://www.navsys.com/navsys-corporation", "https://www.sbir.gov/awards/78571", "https://spacewerx.us/accelerate/cohorts/"]
    },
    {
      "id": "pnt-rohde-schwarz",
      "wave": 2,
      "sector": "Resilient PNT",
      "entities": ["Rohde & Schwarz USA, Inc.", "Rohde & Schwarz GmbH & Co. KG"],
      "entity_clock": "The U.S. supplier is a subsidiary of the privately held German parent.",
      "role": "Calibrated RF generation, commercial GNSS simulation, HIL, interference and measurement.",
      "seams": ["R1", "R4", "R8"],
      "fit": 3,
      "path": 2,
      "evidence": "B",
      "target_status": "supported_federal_comparable_no_public_science_strategy_target_assignment",
      "missing_gate": "Exact target purchase, protected-signal authorization, official scenario, external calibration trace and government-controlled raw data.",
      "disconfirmers": ["M-noise is not proof of authorized encrypted M-Code", "Instrumentation is not the evaluator", "No target assignment was found"],
      "sources": ["https://www.rohde-schwarz.com/us/about-united-states/rohde-schwarz-united-states/about-rohde-schwarz-usa_251170.html", "https://www.rohde-schwarz.com/us/manual/r-s-smw200a-satellite-navigation-user-manual-manuals_78701-479187.html", "https://sam.gov/opp/2e22a23e40ce4883b2d7e45cff7e76ca/view"]
    },
    {
      "id": "pnt-viavi-jackson",
      "wave": 2,
      "sector": "Resilient PNT",
      "entities": ["VIAVI Solutions Inc.", "Jackson Labs Technologies, Inc."],
      "entity_clock": "VIAVI acquired Jackson Labs Technologies on 2022-10-06; this is distinct from VIAVI's 2025 purchase of specified non-PNT Spirent product lines.",
      "role": "Timing distribution, holdover, transcoding, field record/replay and counter-PNT effect generation.",
      "seams": ["R4", "R6", "R7"],
      "fit": 3,
      "path": 2,
      "evidence": "B",
      "target_status": "supported_operational_comparable_no_public_science_strategy_target_assignment",
      "missing_gate": "Target timing or effect task, government-controlled I/Q and independent range truth.",
      "disconfirmers": ["GPSG-1000 is for non-encrypted receivers", "An effect source is not an independent evaluator", "VIAVI does not own Spirent PNT"],
      "sources": ["https://www.viavisolutions.com/fr-fr/node/122233", "https://www.viavisolutions.com/en-us/products/gpsg-1000-portable-satellite-simulator", "https://www.lineofdeparture.army.mil/Portals/144/PDF/Journals/Gray-Space/Summer-2026-Edition/GS26034_SummerEdition_FNL_UA.pdf"]
    },
    {
      "id": "range-netcentric-clois",
      "wave": 3,
      "sector": "Launch and range infrastructure",
      "entities": ["NetCentric Technology, LLC"],
      "entity_clock": "Current CLOIS III holder under FA2521-23-D-0004.",
      "role": "Cape facilities, payload-processing, ordnance, port and mission-critical support.",
      "seams": ["R4", "R7"],
      "fit": 4,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_named_adjacent_task_orders_not_science_strategy_target_assignment",
      "missing_gate": "PWS, facility-acceptance record, range green, mission authorization and flight result.",
      "disconfirmers": ["Small order values may be chargeback support", "NRO detail stops at the unclassified title", "Mission support is not flight approval"],
      "named_objects": ["Next-Generation OPIR GEO", "GE Aerospace Hypersonic and High-Cadence Airborne Testing", "Conventional Prompt Strike", "Orbital Test Vehicle", "Stoke Space", "NRO Launch 77", "NRO Launch 64", "Commander Evaluation Test 7", "NOTU mid-course radar", "NASA launch-stage vehicle adapter"],
      "sources": ["https://www.fpds.gov/ezsearch/FEEDS/ATOM?FEEDNAME=PUBLIC&q=REF_IDV_PIID:%22FA252123D0004%22%20SIGNED_DATE:%5B2025/10/01%20TO%202026/08/19%5D", "https://www.patrick.spaceforce.mil/Portals/14/Prime%20Subcontracting%20Opportunities%20_%20Apr%202026.pdf"]
    },
    {
      "id": "range-metis-pssc",
      "wave": 3,
      "sector": "Launch safety",
      "entities": ["Metis Technology Partners, LLC"],
      "entity_clock": "Current PSSC II holder under FA2521-22-D-0002 through July 2031.",
      "role": "Pad-safety engineering and hazard evidence; government safety officials retain acceptance authority.",
      "seams": ["R4", "R7"],
      "fit": 4,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_named_adjacent_task_orders_not_science_strategy_target_assignment",
      "missing_gate": "Accepted hazard analysis, performed hazardous operation or flight authorization.",
      "disconfirmers": ["A funded safety order does not prove an operation occurred", "ABL and Astra activity may be residual support", "The government retains waiver and launch authority"],
      "named_objects": ["Stoke Space", "Phantom Space", "ABL Space", "Astra Space", "Relativity", "Blue Origin", "SpaceX", "Missile Defense Agency", "Navy Joint Flight Campaign 5"],
      "sources": ["https://www.fpds.gov/ezsearch/FEEDS/ATOM?FEEDNAME=PUBLIC&q=REF_IDV_PIID:%22FA252122D0002%22%20SIGNED_DATE:%5B2025/10/01%20TO%202026/08/19%5D"]
    },
    {
      "id": "range-amentum-sfrc",
      "wave": 3,
      "sector": "Space Force range operations",
      "entities": ["Amentum Technology, Inc.", "Jacobs Technology Inc."],
      "entity_clock": "FA2521-25-D-0006 was awarded to Jacobs Technology Inc.; current orders name Amentum Technology, Inc. Public novation or name-change evidence remains unresolved.",
      "role": "Eastern and Western Range O&M and mission support.",
      "seams": ["R4", "R6", "R7"],
      "fit": 4,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_named_adjacent_task_orders_not_science_strategy_target_assignment",
      "missing_gate": "Legal-successor instrument, range readiness record, FTS acceptance, launch authorization and mission result.",
      "disconfirmers": ["Tiny task values may cover incremental support", "Mission support is not a launch manifest", "Awardee and current recipient names must not be silently normalized"],
      "named_objects": ["Stratolaunch Mach-TB", "Sentinel", "Firefly", "Minotaur IV", "X-37B Orbital Test Vehicle", "Booster Test Program", "NST-Trident", "Space Safari", "Minuteman III"],
      "sources": ["https://www.defense.gov/News/Contracts/Contract/Article/4203613/", "https://www.fpds.gov/ezsearch/FEEDS/ATOM?FEEDNAME=PUBLIC&q=REF_IDV_PIID:%22FA252125D0006%22%20SIGNED_DATE:%5B2025/10/01%20TO%202026/08/19%5D"]
    },
    {
      "id": "range-full-spectrum-ewocs",
      "wave": 3,
      "sector": "Mission communications",
      "entities": ["Full Spectrum Operations, LLC"],
      "entity_clock": "Current EWOCS holder under FA2521-21-D-0003.",
      "role": "Dynamic voice, video, data and operator-console infrastructure for range missions.",
      "seams": ["R4", "R7"],
      "fit": 4,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_named_adjacent_task_orders_not_science_strategy_target_assignment",
      "missing_gate": "Cyber authorization, telemetry acceptance, mission execution and accepted availability record.",
      "disconfirmers": ["Communications support does not prove a launch date", "Some transactions are modifications rather than new missions", "Network operation does not confer mission acceptance"],
      "named_objects": ["Next Gen GEO", "Orbital Test Vehicle", "NOTU Joint Flight Campaign", "RAD Federation"],
      "sources": ["https://www.fpds.gov/ezsearch/FEEDS/ATOM?FEEDNAME=PUBLIC&q=REF_IDV_PIID:%22FA252121D0003%22%20SIGNED_DATE:%5B2025/10/01%20TO%202026/08/19%5D"]
    },
    {
      "id": "range-arctos-sharp",
      "wave": 3,
      "sector": "Flight and risk analysis",
      "entities": ["ARCTOS Technology Solutions, LLC", "ACTA LLC"],
      "entity_clock": "SHARP II FA2521-20-D-0002 ended 2026-01-31; current SHARP III task FA2521-26-F-0055 was awarded to ARCTOS on 2025-12-18 for $20.147 million through 2031-06-30.",
      "role": "Severable flight analysis and non-severable risk analysis supporting range-safety decisions.",
      "seams": ["R4", "R6", "R7"],
      "fit": 4,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_current_analytical_rail_no_public_vehicle_specific_task",
      "missing_gate": "Vehicle-specific data load, completed analysis, government risk acceptance and flight authorization.",
      "disconfirmers": ["The current award does not name a vehicle", "Analytical output is not the government safety decision", "The predecessor and successor instruments must remain separate"],
      "sources": ["https://www.war.gov/News/Contracts/Contract/Article/4364107/contracts-for-dec-18-2025/", "https://www.patrick.spaceforce.mil/Portals/14/SLD%2045%20Acquisition%20Requirements%20Forecast_06102026.pdf"]
    },
    {
      "id": "range-bae-irsp",
      "wave": 3,
      "sector": "Range instrumentation",
      "entities": ["BAE Systems Technology Solutions & Services Inc."],
      "entity_clock": "Current IRSP III holder under FA2521-20-D-0005.",
      "role": "Radar, telemetry, optics, flight termination, data acquisition and GPS range subsystems.",
      "seams": ["R1", "R4", "R7"],
      "fit": 3,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_range_level_orders_no_public_named_emerging_vehicle",
      "missing_gate": "Vehicle-specific instrumentation task, flight-termination acceptance, radar track or accepted post-flight dataset.",
      "disconfirmers": ["Current public orders are generic", "Range support does not establish target work", "Capability evidence is stronger than target discovery"],
      "sources": ["https://www.fpds.gov/ezsearch/FEEDS/ATOM?FEEDNAME=PUBLIC&q=REF_IDV_PIID:%22FA252120D0005%22%20SIGNED_DATE:%5B2025/10/01%20TO%202026/08/19%5D"]
    },
    {
      "id": "range-southwest-wsmr",
      "wave": 3,
      "sector": "White Sands mission support",
      "entities": ["Southwest Range Services, LLC"],
      "entity_clock": "Successor W51EW7-26-C-A001 was awarded 2026-02-09; predecessor W91151-19-C-0008 has public performance through 2026-08-31, creating phase-in overlap.",
      "role": "Test facilities, instrumentation, engineering, technical and analytical support at WSMR.",
      "seams": ["R4", "R7"],
      "fit": 4,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_range_contract_no_public_target_event",
      "missing_gate": "Named test event, schedule, instrumentation plan, safety release or accepted report.",
      "disconfirmers": ["No public task-order hierarchy exists for the definitive contract", "Phase-in does not prove immediate transfer of every mission", "Classified and protected range records may remain unavailable"],
      "sources": ["https://www.usaspending.gov/award/CONT_AWD_W51EW726CA001_9700_-NONE-_-NONE-", "https://www.gao.gov/products/b-424271%2Cb-424271.2%2Cb-424271.3"]
    },
    {
      "id": "range-beyond-new-horizons",
      "wave": 3,
      "sector": "AEDC test operations",
      "entities": ["Beyond New Horizons, LLC", "National Aerospace Solutions, LLC"],
      "entity_clock": "Beyond New Horizons is the current TOS II operator under FA9101-24-C-B002; National Aerospace Solutions was the TOS I predecessor.",
      "role": "Tunnel and cell readiness, facility controls, instrumentation, sustainment and acceptance support at AEDC.",
      "seams": ["R4", "R6", "R7"],
      "fit": 3,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_current_operator_no_public_named_target_program",
      "missing_gate": "Named vehicle/program test, calibrated facility state, accepted test report and program disposition.",
      "disconfirmers": ["Current factory acceptance evidence concerns facility equipment", "A facility operator is not the tested-program authority", "The predecessor is no longer the current operator"],
      "sources": ["https://www.usaspending.gov/award/CONT_AWD_FA910124CB002_9700_-NONE-_-NONE-", "https://www.afmc.af.mil/News/Article-Display/Article/4550112/aedc-team-completes-factory-testing-and-training-in-switzerland/"]
    },
    {
      "id": "range-curtiss-wright-hsdas",
      "wave": 3,
      "sector": "Flight-test data acquisition",
      "entities": ["Curtiss-Wright DS, Inc.", "Teletronics Technology Corp."],
      "entity_clock": "The parent award named Teletronics Technology Corp. d.b.a. Curtiss-Wright Defense Solutions; current orders name Curtiss-Wright DS, Inc.",
      "role": "Proprietary acquisition hardware, instrumentation, ground support and post-flight analysis/display.",
      "seams": ["R1", "R4", "R6", "R7"],
      "fit": 3,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_current_data_rail_no_public_named_emerging_platform",
      "missing_gate": "Exact legal transition, named platform, data-rights terms, raw dataset and accepted post-flight analysis.",
      "disconfirmers": ["Current orders do not name an emerging platform", "Proprietary tooling can limit but does not prove denial of data access", "Prior B-52 evidence is only a comparator"],
      "sources": ["https://www.defense.gov/News/Contracts/Contract/Article/3279554/", "https://www.usaspending.gov/award/CONT_AWD_FA930226F0001_9700_FA930223D0001_9700"]
    },
    {
      "id": "minerals-mp-srk",
      "wave": 4,
      "sector": "Rare earths",
      "entities": ["SRK Consulting (U.S.), Inc.", "MP Materials Corp."],
      "entity_clock": "SRK prepared the February 2026 S-K 1300 Mountain Pass technical report retained by MP Materials.",
      "role": "Integrate geology, resource/reserve, metallurgy, mine plan, cost and economic evidence for issuer disclosure.",
      "seams": ["R2", "R4", "R7"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_project_report_not_federal_appointment_or_acceptance",
      "missing_gate": "Exact report section, QP consent, current effective date, federal reliance language and any independent agency review.",
      "disconfirmers": ["MP retained the QP firm", "The SEC filing is not a regulator endorsement of the mine", "A technical report does not prove construction or output"],
      "sources": ["https://www.sec.gov/Archives/edgar/data/1801368/000180136826000008/mpmcexhibit961123125.htm", "https://www.sec.gov/Archives/edgar/data/1801368/000180136826000008/mp-20251231.htm"]
    },
    {
      "id": "minerals-thacker-network",
      "wave": 4,
      "sector": "Lithium",
      "entities": ["SGS Canada Inc.", "Sawtooth Mining, LLC", "NewFields Mining Design & Technical Services", "EXP U.S. Services Inc.", "Lithium Americas Corp."],
      "entity_clock": "Third-party technical-report authors coexist with current issuer supervision by employee Rene LeBlanc; report authorship and current disclosure supervision are distinct clocks.",
      "role": "Sectioned geology, process, mine, tailings/infrastructure and economic evidence for Thacker Pass.",
      "seams": ["R2", "R4", "R7"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_project_report_network_not_federal_appointment_or_acceptance",
      "missing_gate": "Current section ownership, effective-date chain, independence statement, federal lender/agency reliance and accepted construction evidence.",
      "disconfirmers": ["Current disclosure supervision is not identical to older report authorship", "Qualified persons are issuer retained", "Federal financing does not convert a QP into an agency decision maker"],
      "sources": ["https://www.sec.gov/Archives/edgar/data/1966983/000119312525002534/d909276dex961.htm", "https://www.sec.gov/Archives/edgar/data/1966983/000119312526115081/lac-20251231.htm"]
    },
    {
      "id": "minerals-graphite-one-network",
      "wave": 4,
      "sector": "Graphite",
      "entities": ["Barr Engineering Co.", "Hatch Ltd.", "Alaska Earth Sciences, Inc.", "Graphite One Inc."],
      "entity_clock": "The 2025 feasibility study is led by Barr with Hatch and Alaska Earth Sciences; the 2022 PFS used JDS Energy & Mining, so the report-generation clock changed.",
      "role": "Qualified-person evidence for resource, mine, processing, infrastructure and economics of the Graphite Creek supply chain.",
      "seams": ["R2", "R3", "R4", "R6"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_project_feasibility_network_with_dpa_support_not_federal_acceptance",
      "missing_gate": "Report/version lock, QP section matrix, permitting record, any EPC role screen and federal acceptance or disbursement condition.",
      "disconfirmers": ["DPA support does not appoint the QPs", "JDS is a legacy rather than current prime", "Feasibility completion does not establish production"],
      "sources": ["https://www.graphiteoneinc.com/graphite-one-advances-its-united-states-graphite-supply-chain-solution-with-completion-of-a-bankable-feasibility-study/", "https://www.graphiteoneinc.com/wp-content/uploads/2025/04/NI-43101_FS_Report_20250422_Final.pdf"]
    },
    {
      "id": "minerals-perpetua-bba",
      "wave": 4,
      "sector": "Antimony and gold",
      "entities": ["Perpetua Resources Idaho, Inc.", "BBA Consultants International, LP", "Hatch Ltd."],
      "entity_clock": "The current 2025 S-K 1300 Stibnite report uses internal QPs James Norine and Christopher Dail plus BBA representative Justin Knudsen; Hatch holds a separate 2026 EPCM role.",
      "role": "Technical-resource and preliminary-feasibility evidence, with a separate process-plant and infrastructure EPCM rail.",
      "seams": ["R2", "R3", "R4"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_project_report_and_epcm_roles_not_federal_acceptance",
      "missing_gate": "Internal/external QP reliance matrix, EPCM conflict screen, current federal-financing conditions, completed design and agency acceptance.",
      "disconfirmers": ["The current report is PFS-level", "Internal QPs are visible rather than hidden independent validators", "Federal EXIM activity is a separate decision rail"],
      "sources": ["https://www.sec.gov/Archives/edgar/data/1526243/000110465926037403/ppta-20251231xex96d1.htm"]
    },
    {
      "id": "minerals-niocorp-network",
      "wave": 4,
      "sector": "Niobium, scandium and rare earths",
      "entities": ["Dahrouge Geological Consulting USA Ltd.", "Understood Mineral Resources Ltd.", "Optimize Group", "Tetra Tech", "Adrian Brown Consultants Inc.", "Metallurgy Concept Solutions", "Magemi Mining Inc.", "L3 Process Development", "Olsson", "A2GC", "Dumas Contracting Ltd.", "NioCorp Developments Ltd."],
      "entity_clock": "The broad QP network appears in 2025 filing and consent materials, but the Elk Creek study effective date remains 2022-06-30.",
      "role": "Sectioned geology, resources, metallurgy, process, mine, infrastructure and economic evidence.",
      "seams": ["R2", "R4", "R6", "R7"],
      "fit": 3,
      "path": 1,
      "evidence": "A",
      "target_status": "confirmed_filing_network_with_older_study_clock_not_federal_acceptance",
      "missing_gate": "Current study update, exact consent/report relationship, section responsibility, financing reliance and any accepted construction package.",
      "disconfirmers": ["A current filing date is not a current study effective date", "Internal QP Scott Honan appears alongside outside firms", "No federal appointment follows from SEC consent"],
      "sources": ["https://www.sec.gov/Archives/edgar/data/1512228/000153949725002690/n2574_424b5.htm"]
    },
    {
      "id": "minerals-energy-fuels-slr",
      "wave": 4,
      "sector": "Uranium and heavy-mineral sands",
      "entities": ["SLR International Corporation", "Energy Fuels Inc."],
      "entity_clock": "SLR prepared the 2026 Pinyon Plain PFS; Energy Fuels uses other named QP teams for Bullfrog and the 2025-effective Vara Mada report.",
      "role": "Prepare project-specific resource, mine, process, infrastructure, environmental and economic evidence across different assets.",
      "seams": ["R2", "R4", "R6", "R7"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_project_reports_not_federal_appointment_or_acceptance",
      "missing_gate": "Asset/report/entity lock, signed QP responsibility table, regulatory reliance and accepted operating or construction decision.",
      "disconfirmers": ["One issuer uses different QP teams across assets", "Vara Mada's effective and signature dates differ", "A filed report is not federal approval"],
      "sources": ["https://www.sec.gov/Archives/edgar/data/1385849/000106299326001182/exhibit99-1.htm", "https://www.sec.gov/Archives/edgar/data/1385849/000106299326000229/exhibit99-1.htm", "https://www.sec.gov/Archives/edgar/data/1385849/000106299325011073/form8k.htm"]
    },
    {
      "id": "minerals-usarare-unresolved-referees",
      "wave": 4,
      "sector": "Rare earths and magnets",
      "entities": ["USA Rare Earth, Inc.", "U.S. Department of Commerce consultants not publicly named"],
      "entity_clock": "Direct Funding Agreement AP-2026-0044 permits Commerce to consult unnamed Department consultants; the company has targeted a Round Top PFS for H2 2026 without publicly naming its future QP firm.",
      "role": "Unresolved third-party review of disbursement conditions, safety implementation, nuclear-material licensing validation, power planning and future technical-resource evidence.",
      "seams": ["R2", "R4", "R7"],
      "fit": 4,
      "path": 3,
      "evidence": "A",
      "target_status": "confirmed_federal_agreement_with_unnamed_consultants_and_unresolved_future_qp",
      "missing_gate": "Consultant identity and task, Round Top QP firm, milestone schedule, signed validation reports and Commerce disbursement disposition.",
      "disconfirmers": ["Disbursement is expressly not approval or acceptance of work", "Company milestones are not completed objects", "No public source identifies the consultants or future PFS author"],
      "sources": ["https://www.sec.gov/Archives/edgar/data/1970622/000121390026064453/ea029340201ex10-1.htm", "https://www.sec.gov/Archives/edgar/data/1970622/000121390026064453/ea0293402-8k_usarare.htm", "https://www.sec.gov/Archives/edgar/data/1970622/000197062225000073/exhibit991-earningsrelease.htm"]
    },
    {
      "id": "fusion-opg-tritium",
      "wave": 5,
      "sector": "Fusion fuel custody",
      "entities": ["Ontario Power Generation Inc."],
      "entity_clock": "Current public source identifies OPG's Darlington operation as the world's only non-military commercial tritium supply.",
      "role": "Extract and store tritium created in CANDU heavy-water reactors.",
      "seams": ["R4", "R7", "R8", "R9"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_commercial_supply_capability_no_public_us_target_procurement",
      "missing_gate": "U.S. target purchase, export/import and license path, assay, package, carrier, custody transfer and accepted receipt.",
      "disconfirmers": ["Canadian supply is not a U.S. target contract", "Available CANDU tritium is not enough for a commercial fusion economy", "Supply custody is distinct from NRC licensing authority"],
      "sources": ["https://www.opg.com/stories/isotopes-from-opgs-nuclear-stations-helping-to-unlock-the-promise-of-nuclear-fusion/", "https://nucleus.iaea.org/sites/connect/FUSEpublic/SitePages/Tritium-Breeding.aspx"]
    },
    {
      "id": "fusion-cnl-custody",
      "wave": 5,
      "sector": "Fusion fuel custody",
      "entities": ["Canadian Nuclear Laboratories Ltd.", "Ontario Power Generation Inc."],
      "entity_clock": "CNL operates the Tritium Facility under Canadian licensing and, under OPG contract, has dispensed, packaged and shipped tritium including for JET.",
      "role": "Assay, dispense, package and transfer tritium between source owner and experiment.",
      "seams": ["R4", "R7", "R8"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_international_custody_comparable_no_public_us_target_procurement",
      "missing_gate": "Target contract, material license, package/certificate, carrier, import/export authorization, chain-of-custody and receiving survey.",
      "disconfirmers": ["JET is an international comparator", "A facility license is not a U.S. target authorization", "CNL's custody role does not make it the material owner in every transaction"],
      "sources": ["https://conferences.iaea.org/event/385/contributions/35508/"]
    },
    {
      "id": "fusion-energysolutions-clive",
      "wave": 5,
      "sector": "Fusion waste",
      "entities": ["EnergySolutions, LLC"],
      "entity_clock": "The Clive, Utah site is an active licensed low-level and mixed-waste disposal facility.",
      "role": "Potential downstream processing/disposal for qualifying waste under its license and waste-acceptance criteria.",
      "seams": ["R4", "R7"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_licensed_capacity_no_public_fusion_target_waste_contract",
      "missing_gate": "Target waste characterization, classification, WAC acceptance, manifest, transport package, contract and disposal record.",
      "disconfirmers": ["Licensed capacity does not prove acceptance of novel fusion waste", "Class and mixed-waste limits apply", "No target contract was found"],
      "sources": ["https://www.nrc.gov/waste/llw-disposal/licensing/locations", "https://deq.utah.gov/businesses-facilities/low-level-radioactive-waste-energysolutions"]
    },
    {
      "id": "fusion-wcs",
      "wave": 5,
      "sector": "Fusion waste",
      "entities": ["Waste Control Specialists LLC"],
      "entity_clock": "Texas license R04100 Amendment 43 was issued 2026-06-18; compact and license conditions govern Class A/B/C acceptance.",
      "role": "Potential downstream low-level radioactive-waste disposal under Texas licensing and compact permissions.",
      "seams": ["R4", "R7"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_licensed_capacity_no_public_fusion_target_waste_contract",
      "missing_gate": "Target characterization, compact authorization, WAC acceptance, manifest, transport and disposal record.",
      "disconfirmers": ["License scope is not universal acceptance", "Compact permission may be required", "No target contract was found"],
      "sources": ["https://www.tceq.texas.gov/permitting/radmat/licensing/wcs_license_app.html"]
    },
    {
      "id": "fusion-nac-package",
      "wave": 5,
      "sector": "Radioactive-material transport",
      "entities": ["NAC International, Inc."],
      "entity_clock": "NAC is the certificate holder for the NRC-certified OPTIMUS-L package, CoC 9390.",
      "role": "Provide a certified packaging design and related transport-system services for qualifying contents.",
      "seams": ["R1", "R4", "R7"],
      "fit": 3,
      "path": 1,
      "evidence": "A",
      "target_status": "confirmed_package_certificate_no_public_fusion_target_or_carrier_assignment",
      "missing_gate": "Target contents determination, certificate revision, approved user, loading procedure, carrier, route, shipment authorization and receipt.",
      "disconfirmers": ["Certificate holder is not necessarily the carrier", "A certified package may not cover the target contents", "No target shipment was found"],
      "sources": ["https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML24032A320", "https://www.nrc.gov/materials/transportation/package"]
    },
    {
      "id": "fusion-marsh",
      "wave": 5,
      "sector": "Fusion insurance and financeability",
      "entities": ["Marsh LLC"],
      "entity_clock": "Marsh publicly identifies fusion projects within its nuclear-construction insurance practice and participated in the 2025 Lloyd's fusion-insurance market event.",
      "role": "Structure and broker construction, property, liability, delay and other coverage needed for project financeability.",
      "seams": ["R4", "R5", "R7"],
      "fit": 4,
      "path": 2,
      "evidence": "A",
      "target_status": "confirmed_fusion_market_capability_no_public_target_placement",
      "missing_gate": "Named target mandate, risk survey, insurer panel, exclusions, limits, premium, binder and claims/commissioning conditions.",
      "disconfirmers": ["Participation in a market event is not a bound policy", "Brokerage does not confer NRC authority", "No target placement was found"],
      "sources": ["https://www.marsh.com/en/industries/construction/expertise/nuclear-construction-insurance.html", "https://www.lloyds.com/news-and-insights/events/fusion-energy"]
    },
    {
      "id": "fusion-specialty-insurance-market",
      "wave": 5,
      "sector": "Fusion insurance and financeability",
      "entities": ["Beazley plc", "Oak Reinsurance Ltd.", "Northcourt Limited", "Newfront Insurance, Inc."],
      "entity_clock": "Beazley and Oak Re appeared as underwriter participants in Lloyd's 2025 fusion event; Northcourt markets NC Fusion through regulated brokers; Newfront published fusion-insurance analysis.",
      "role": "Potential underwriting, reinsurance, intermediary and advisory capacity for novel fusion risks.",
      "seams": ["R4", "R5"],
      "fit": 3,
      "path": 1,
      "evidence": "B",
      "target_status": "market_signal_only_no_public_target_policy_or_placement",
      "missing_gate": "Exact legal carrier/intermediary, regulated permissions, target risk submission, quoted/bound terms, exclusions and capacity commitment.",
      "disconfirmers": ["Event participation is not underwriting commitment", "Thought leadership is not a policy", "NC Fusion inquiries route through regulated brokers"],
      "sources": ["https://www.lloyds.com/news-and-insights/events/fusion-energy", "https://www.nc-fusion.com/", "https://fusionenergyinsights.com/blog/post/affirmative-insurance-coverage-for-fusion-3-key-insights"]
    },
    {
      "id": "fusion-ani-price-anderson",
      "wave": 5,
      "sector": "Nuclear liability",
      "entities": ["American Nuclear Insurers"],
      "entity_clock": "ANI operates the U.S. nuclear insurance pool associated with Price-Anderson coverage for covered nuclear facilities.",
      "role": "Potential nuclear-liability insurance mechanism where the statutory and licensing status brings a facility within or near the Price-Anderson framework.",
      "seams": ["R4", "R5"],
      "fit": 3,
      "path": 1,
      "evidence": "A",
      "target_status": "legal_pathway_watch_not_automatic_fusion_coverage",
      "missing_gate": "Final NRC rule, target license type, statutory determination, indemnity agreement if applicable and bound coverage.",
      "disconfirmers": ["Materials-license fusion is not automatically treated as a utilization facility", "Price-Anderson can be discretionary for byproduct licensees", "No target policy was found"],
      "sources": ["https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/nuclear-insurance", "https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML22273A163"]
    }
  ]
}

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.