# INTERNATIONAL MONETARY TRANSITION — FACTUAL TIMELINE

**Status:** Current specialist event and legal-gate spine.
**Original factual cutoff:** 2026-07-20; original rows retain their recorded dates and states.  
**Scope:** Events that change a legal gate, operating rail, settlement window, collateral path or production corridor. Announcements and scheduled dates are not promoted to occurrence.

**Reading route:** [The maintained initiation answer](/library/readings/e03be4ad25540c4f9d0b.html) owns the shared
cross-region conclusion. This specialist retains its detailed evidence and
original research clocks. September 7 consolidation is saved-source
reconciliation, not a fresh review of every region or scheduled milestone.

## Later saved event amendments — separate from the original spine

The following additions reconcile saved sources. They do not convert all
July 20 pending dates into verified September events. The
[Japan August source ledger](/library/readings/ee75cfaff42ec504f0e0.html) carries each numbered source record.

| Observation / legal clock | Publication / retrieval clock | Saved change | Boundary and source owner |
|---|---|---|---|
| March 30, 2026; May 26, 2026 | Saved Korea digital-money research | BOK-Wire+ hours implemented March 30; ISO 20022 production migration May 26 | Hours and message format are separate from token issuance; [Korea digital-money annex](/library/readings/9b3fd439b271dce7122d.html) |
| Controlled July 2026 Agorá testing | Official results July 30 KST | 28 institutions completed 30 real-value prototype transactions across 17 scenarios | Does not establish a production rail, complete RTGS/core integration or final legal opinions; JPN-AUG-014 |
| Act No. 64 promulgated July 23; narrow subset effective August 12 | Saved official docket and FSA partial-commencement notice | Promulgation and limited enforcement gates resolved | Main FIEA commencement, tax, ETF and migration remain separate; JPN-AUG-017 |
| Canton JGB repo/DvP PoC August 13 | August 13 release | Named implementation PoC synchronizes book-entry JGB and blockchain records | Does not establish a selected cash leg or production DvP; JPN-AUG-016 |
| DCP validation began August 20 | August 26 release | 43-company pilot compares three architectures | Does not establish a settled design or production-finality outcome; JPN-AUG-015 |
| JPYSC reserve snapshot June 30, 19:00 JST | Issuer/service pages reached in August | Public reserve snapshot and direct-redemption route located | Historical observation, not current reserves, routine redemption or external circulation; JPN-AUG-018 |
| Earlier end-2026 offshore-KRW pilot horizon; later 2027 operation target | Later saved BOK material carried in Korea annex | Planning clocks differ | Neither target proves completed pilot/production; [Korea digital-money annex](/library/readings/9b3fd439b271dce7122d.html) |

## Status vocabulary

`active law` · `law passed / future effective` · `production` · `completed transaction` · `completed pilot` · `PoC` · `formally initiated` · `scheduled` · `design` · `proposal`.

## Occurred and effective events

| Date | Region / entity | Event | Status | Gate changed |
|---|---|---|---|---|
| 2018 | Indonesia, Malaysia and Thailand authorities/banks | Bilateral local-currency settlement arrangements enter operation | `production` | Direct local-currency trade/investment framework |
| 2021-12-21 | Bank Indonesia | BI-FAST launches | `production` | 24/7 domestic retail fast payments |
| 2022-08 | Indonesia–Thailand | Cross-border QR link enters operation | `production` | Live bilateral retail payment corridor |
| 2022-11 | ASEAN central banks | Regional Payment Connectivity cooperation formalized | `active cooperation` | Regional interoperability mandate; not one settlement operator |
| 2023-03-23 | European Union | DLT Pilot Regime begins applying | `active law` | Authorized DLT market infrastructures may receive targeted exemptions |
| 2023-05 | Indonesia–Malaysia | Cross-border QR link enters operation | `production` | Live bilateral retail corridor |
| 2023-11 | Indonesia–Singapore | Cross-border QR link enters operation | `production` | Live bilateral retail corridor |
| 2024-06-30 | European Union | MiCA titles governing asset-referenced and e-money tokens begin applying | `active law` | Stablecoin authorization/reserve regime |
| 2024-07-01 | South Korea | Onshore FX trading hours extend to 02:00 next day | `production` | Longer won/FX market access; central-bank settlement clock remained separate |
| 2024-12 | Bank Indonesia | Wholesale Digital Rupiah immediate-stage PoC completed | `completed PoC` | Candidate wholesale CBDC architecture tested; no issuance decision |
| 2024-12-30 | European Union | Remaining MiCA regime begins applying | `active law` | Broader crypto-asset service/issuer framework, subject to transition rules |
| 2025-01-06 | BRICS / Brazil presidency | Indonesia announced as a full BRICS member | `political status` | Forum membership; no transfer of payment-system authority |
| 2025-02-26 | OJK / Pegadaian / Bank Syariah Indonesia | Authorized bullion services officially launch | `production` | Regulated gold deposit/finance/trade/custody; not gold-backed money |
| 2025-04 through 2025-06 | Bank of Korea + seven banks | Project Hangang Phase I conducts live user transactions | `completed live pilot` | Tokenized commercial-bank deposits anchored by wholesale BOK digital currency |
| 2025-06-06 | Japan Diet | Payment Services Act amendment enacted as Law No. 66 | `law passed` | Reserve-asset/legal changes for specified electronic-payment-instrument trust structures |
| 2025-07-05 | BRICS leaders / finance officials | Rio documents continue local-currency and interoperability work | `political mandate` | Continued study; no common issuer or operating switch created |
| 2025-08-25 | Indonesia–Japan | QRIS cross-border link launches for the stated initial direction/scope | `production` | Live local-currency retail corridor |
| 2026-01-15 | South Korean National Assembly | Securities-token amendments pass | `law passed / future effective` | DLT may become recognized securities registry under controlled framework |
| 2026-02-02 | Bank Indonesia / Nexus | Indonesia joins Nexus implementation as full participant | `implementation` | BI-FAST connection work begins; production interconnection not yet proven |
| 2026-03-06 | Bank Indonesia + Bank of Korea | Renewed bilateral currency swap becomes effective | `active through 2031-03-05` | KRW/IDR central-bank liquidity support |
| 2026-03-18 | Bank of Korea | Project Hangang Phase II formally initiated | `formally initiated` | Expanded banks/functions; follow-on public use remains scheduled |
| 2026-03-30 | Eurosystem | DLT-issued marketable assets can qualify as collateral under specified existing conditions | `active rule` | Tokenized assets may enter credit operations through eligible CSD/settlement paths |
| 2026-03-30 | Bank of Korea | BOK-Wire+ hours extend to 20:00 | `production` | Longer daily wholesale central-bank-money settlement window |
| 2026-04-01 | Bank Indonesia + Bank of Korea | Bilateral QR payment linkage launches | `production` | Live IDR/KRW retail corridor using local-currency framework |
| 2026-04-20 | JSCC/JPX + Mizuho + Nomura + Digital Asset | JGB digital-collateral PoC announced | `PoC` | Tests 24/7 collateral movement and legal treatment; not production |
| 2026-04-30 | Indonesia–China | Cross-border QR soft launch | `limited production / soft launch` | Initial live corridor |
| 2026-05-08 | Progmat + participating institutions | Tokenized-JGB repo study group announced | `study` | October report and possible projects targeted; no committed market migration |
| 2026-05-16 | Bank of Japan | Tokenized-reserve internal sandbox publicly described | `sandbox` | Technical exploration of BOJ-reserve tokenization; no issuance decision |
| 2026-05-20 | Qivalis bank consortium | Membership expands to 37 European banks while Dutch EMI authorization remains pending | `consortium expansion / conditional issuance` | Broader prospective distribution; no euro token issued |
| 2026-05-22 | Japan FSA | Implementing orders/public-comment results for Payment Services Act amendments published | `final implementing package` | Exact covered instruments, assets, caps and supervision specified |
| 2026-06-01 | Japan | Trust-type stablecoin reserve changes take effect | `effective` | Up to 50% of the covered reserve pool may use qualifying short-dated sovereign bonds under the rule; not a blanket stablecoin/JGB mandate |
| 2026-06-01 | Indonesia | Revised DHE SDA natural-resource export-FX regime becomes effective | `active rule` | Covered export FX redirected into state-bank special accounts with bank/BI and FX SUN/SBSN placement channels |
| 2026-06-10 | MUFG Bank + Mizuho Bank + SMBC | Banks announce shared trust-stablecoin structure and FY2026 commercial-transaction target | `scheduled / implementation preparation` | Common settlor/governance design; no live transaction or production trustee yet |
| 2026-06-10 | KB Kookmin Bank | US$100m two-year digital bond issued through HSBC Orion / HKMA CMU | `issued / production transaction` | Production offshore bank debt; not won stablecoin or tokenized KTB |
| 2026-06-11 | Indonesia–China authorities | China QR linkage grand launch and related financial-cooperation package | `production / cooperation package` | Expanded QR participation; other CIPS/LCT objects remain separate |
| 2026-06-11 | Bank Mandiri + CIPS | Bank Mandiri designated direct CIPS participant; BI/PBOC sign RMB-clearing MOU | `production bank connection / announced clearing arrangement` | Direct RMB payment-system access; Indonesian clearing bank not yet named |
| 2026-06-17 | Bank of Japan | 1.0% policy rate becomes effective; JGB-purchase reduction path continues | `effective policy` | Normalization/stress channel, not a digital-money launch |
| 2026-06-23 | European Parliament ECON committee | Digital-euro negotiating position adopted | `legislative stage` | Enables Parliament negotiation; not final law or issuance |
| 2026-06-24 | SBI Shinsei Trust Bank + SBI VC Trade | JPYSC trust-type yen stablecoin issued and offered inside SBI VC Trade accounts | `production / closed account perimeter` | First identified live trust-type yen electronic payment instrument; external-wallet/public-chain circulation unavailable |
| 2026-06-29 | EIB + Clearstream + DekaBank + Eurex Clearing + Bundesbank | DLT-native EIB commercial paper mobilized through triparty/ECMS for Bundesbank financing | `completed transaction` | Tokenized issuance enters regulated central-bank collateral circuit |
| 2026-07-09 | Swift + participating banks | Shared-ledger system declared ready for initial use; 17 banks prepare pioneer transactions | `controlled go-live / live-pilot preparation` | Shared orchestration state; no new settlement asset |
| 2026-07-15 | Japan Diet | FIEA / Payment Services Act crypto-market reform passes both chambers | `law passed / not yet effective` | Crypto trading, offerings, lending, management, advice, disclosure and unfair-trading rules move into the FIEA perimeter; crypto is not thereby legal tender or automatically a security |

## Scheduled and conditional clocks

| Date / window | Region / entity | Scheduled or conditional event | Exact present status | Promotion evidence required |
|---|---|---|---|---|
| FY2026 | MUFG Bank + Mizuho Bank + SMBC + future trustee | First commercial transaction using shared trust stablecoin | `scheduled / implementation preparation` | Named trustee, reserve/redemption terms and first completed real-value transaction |
| FY2026 | Japan Post Bank | Yucho DCJPY rollout / first tokenized-deposit use | `committed plan / implementation`; no first operating notice | Issuer terms, customer eligibility, core-ledger connection and completed production transaction |
| Within one year after promulgation, on a Cabinet-order date | Japan FSA / Cabinet | Core FIEA crypto-market reforms commence | `law passed`; official docket showed no promulgation date/law number at 2026-07-20 cutoff | Promulgation, Cabinet order, subordinate rules and registration transition |
| after legal/tax/supervisory clearance | SBI Shinsei Trust Bank + SBI VC Trade | JPYSC external-wallet and public-chain circulation | `conditional`; technical preparation claimed complete | Withdrawal enabled under published chain, reserve, redemption and supervisory terms |
| H2 2026 | Qivalis / 37-bank consortium | Potential euro electronic-money-token issuance | `conditional` on Dutch EMI authorization and implementation | DNB authorization, legal issuer and redemption/reserve terms |
| 2026 H2 | Bank of Korea | Project Hangang Phase II follow-on public transactions | `scheduled`; exact date/use sites not publicly stated in launch instrument | BOK opening notice, operating terms and transaction record |
| 2026 H2 | Korean ministries + BOK + participant banks | First programmable EV-charging subsidy paid through a deposit token | `MOU / scheduled disbursement` | Named beneficiary payment and bank/BOK settlement record |
| 2026-09 | Eurosystem / ECB | Pontes initial product launch connecting DLT platforms to TARGET Services | `scheduled`; not yet active | Production rulebook, admitted platforms and settled transaction |
| 2026-09-01 | Bank of Russia + largest banks / qualifying merchants | Statutory first stage of broader digital-ruble access | `future effective / pilot currently limited` | Bank and merchant access actually enabled under platform rules |
| 2026-09-01 in second-reading draft | Russian federal authorities / Bank of Russia | Main digital-currency and digital-rights market framework under Bill No. 1194918-8 | `pending legislation`; first reading passed and second-reading text posted, but no enacted law at cutoff | Duma second/third readings, Federation Council, presidential signature, publication and final commencement text |
| 2027-07-01 in second-reading draft | Russian federal authorities / regulated intermediaries | Residents confined to the named regulated crypto-market perimeter; illegal-market payment blocking matures | `pending legislation / future control gate` | Enacted text and operative Bank of Russia/intermediary rules |
| end-2026 | Bank of Korea | 24-hour Offshore KRW Settlement System pilot | `pilot planned` | Operator, participants, legal finality and first completed settlement |
| 2027 | Nexus Global Payments participants including Indonesia | Nexus go-live target linking national instant-payment systems | `implementation / not live` | Production routing, participant systems, FX and first completed corridor transaction |
| 2027-02-04 | South Korea | Securities-token amendments take effect | `future effective date` | Effective subordinate rules and operational KSD/market infrastructure |
| H2 2027 | ECB | Twelve-month digital-euro beta pilot begins | `scheduled`; beta is not legal digital-euro money | Participant selection, terms and actual pilot start |
| 2027 | Bank Indonesia | BI-RTGS Generation III multicurrency/ISO 20022 phase target | `planned` | BI implementation notice and production cutover |
| 2027-10-11 | European Union securities markets | T+1 settlement implementation date | `legally adopted date` | Operational cutover; this is post-trade compression, not tokenization itself |
| 2028 | ECB / Eurosystem | Appia blueprint target | `planned design output` | Published blueprint; later implementation remains separate |
| 2028 | Bank Indonesia | BI-RTGS cross-border/blockchain-capability phase planned to begin | `planned` | Procurement/build/production records |
| 2029 at earliest under current ECB scenario | European Union / ECB | Possible digital-euro issuance | `conditional` on final legislation and ECB decision | Enacted regulation plus ECB Governing Council issuance decision |

## BRICS workstream clocks without operative launch dates

| Object | Last authoritative public state located | What is missing |
|---|---|---|
| BRICS Cross-Border Payments Initiative | Voluntary/non-binding work and continued discussion | Public operating entity, binding rulebook, admitted participants, production transactions |
| BPTF technical report | Report exists but is restricted in the Brazilian central-bank register | Public architecture and verifiable implementation commitments |
| BRICS Clear | Feasibility study / technical dialogue | Legal operator, CSD/settlement rulebook, assets, finality law and launch date |
| CRA alternative payment currencies | Proposal/revised treaty work | Executed and effective amendment plus operational procedures |
| BRICS Pay | Private/Business Council consortium roadmap and demonstrations | State-system authority; common bloc operator and final-settlement record |
| UNIT | Private proposal/prototype | Official adoption, legal issuer, reserve/custody terms and redemption obligation |

## Comparative reading

Use the [maintained initiation answer](/library/readings/e03be4ad25540c4f9d0b.html)
for the relative weight of these events. The chronology keeps effective rules,
enacted but future-effective statutes, completed transactions and scheduled
projects separate; Korea's securities-token statute was not yet effective at
the original cutoff. A scheduled date passing does not prove operation.
