---
title: Federal Government Fiscal-Year-Close Delta — Wave 0 Control Preflight
status: complete
artifact_role: method
research_id: federal-government-fiscal-year-close-delta-2026-09-30
---

# Wave 0 — control preflight

## Question

What materially changed on official U.S. federal sources strictly after the
September 25 weekly close through the frozen September 30 morning cutoff, and
did fiscal-year close produce evidence of obligation, payment, delivery or
operation rather than only announcements, ceilings, rules or requests?

## Authority and baseline

The Chronicle router, Workbench context, research instructions and
government-wide instructions control. The September 25 weekly package is the
immediate baseline. Existing topic owners retain their facts; this package
records the delta and routes material objects back to them.

## Admission test

Retain an object only when an official source establishes a material change in
legal authority, process, program state, acquisition state, supervision,
implementation, operation, oversight or delivery. Preserve separately:

- signature, filing, publication, effective and applicability dates;
- proposal, final rule, approval, implementation and operation;
- ceiling, obligation, outlay, payment, delivery and acceptance;
- audit finding, agency response, remediation and measured effect.

Homepage or index change is only a locator. Removed machine objects are not
repeals. A route failure is an access limit, not proof of inactivity.

## Mutation boundary

Authorized: new Workbench package, Catalog/Registry integration and the closest
Workbench owner extension. Not authorized: Chronicle, canonical watches,
Federal Group, app/site projection, Git commit or push.
