---
title: "NASA awards relay concept work, reports the final ISS array, and loses a servicing demonstrator"
research_id: federal-science-operating-system
artifact_role: factual_spine
status: current
evidence_cutoff: 2026-11-05
---

# NASA's relay procurement, ISS power and servicing experiment

- **Procurement.** On November 4 NASA announced firm-fixed-price NextSTEP-3 Appendix E awards to Astranis, Global Enterprise Solutions and Viasat for Ka-band relay concepts and risk reduction. Combined ceilings are $1,065.6 million including options. The initial period runs through May 3, 2027, with options for work toward in-orbit demonstrations through 2029. Award, actual obligated value, option exercise and an accepted operating relay are separate. [NASA award announcement](https://www.nasa.gov/news-release/nasa-announces-ka-band-satellite-relay-awards-for-space-communications/)
- **Hardware deployed.** NASA's November 5 3:52 p.m. EST mission post reports the eighth ISS Roll-Out Solar Array deployed on channel 3B. The EVA concluded 3:35 p.m. NASA states generation capacity of about 215 kW compared with 160 kW before the upgrades. The agency reports installation and capacity. Long-run observed power output remains a separate measurement. [NASA mission post](https://www.nasa.gov/blogs/spacestation/2026/11/05/spacewalkers-install-final-roll-out-solar-array/)
- **Demonstration stopped.** NASA's November 3 5:18 p.m. report records that Starfish Space's Otter spacecraft for SSPICY was deemed unrecoverable after loss of communication during commissioning. October 1 launch and initial contact occurred. Inspection and servicing were unachieved. NASA is the funding sponsor and publisher. Starfish is the spacecraft operator. Root cause remains open. [NASA SSPICY status](https://www.nasa.gov/blogs/smallsatellites/2026/11/03/nasa-funded-sspicy-mission-experiences-communications-loss/)

The [November 3 space declaration](AMERICAN_DECLARATION_OF_FREEDOM_IN_SPACE_2026-11-03.md) controls its own policy statement. These three projects show different stages of procurement and actual capability, under separate authority and before/after clocks.
