# Contested Logistics

The [November 25 Iowa lead-azide detonation explainer](IOWA_LEAD_AZIDE_DETONATION_2026-11-25.md)
adds ammunition-stockpile safety context, the court/disposal dispute and the
distinction between early success reports and measured environmental results.
The broader production and logistics cutoffs remain unchanged.

The [neutralization contract and decision trace](IOWA_NEUTRALIZATION_CONTRACT_AND_DECISION_TRACE_2026-11-25.md)
follows the 2025 notice, MuniRem award, May 2026 detonation decision, temporary
storage permits and American Ordnance's dated leadership and oversight record.

Start with the [Contested Logistics research package](CONTESTED_LOGISTICS_RESEARCH_PACKAGE.md)
for prepared commercial lift, ports, rail, fuel, production, sustainment and
payment. Its July 15 baseline and September 30 FORTRESS-focused update keep
authority, activation and operating clocks separate.

The [October 2026 industrial and transport capacity delta](OCTOBER_2026_INDUSTRIAL_AND_TRANSPORT_CAPACITY_DELTA.md)
adds the $2.3 billion CRISI rail selections, $426 million INFRA selections,
$128.2 million PHMSA safety-grant package, the enacted critical-infrastructure
manufacturing study, updated USGS deposit map and helium designation. It keeps
selection, agreement, obligation, construction, commissioning and measured
capacity separate.

The October 23 [Hampton Roads barracks financial-close answer](HAMPTON_ROADS_BARRACKS_FINANCIAL_CLOSE_2026-10-23.md)
records a private-capital transaction-stage receipt for 8,098 planned beds over
five years. It keeps financial close, construction, delivery, occupancy,
sustainment funding and projected savings on separate clocks.

For the installation-power question, follow the child
[FORTRESS America research package](../FORTRESS%20America%20and%20Military%20Installation%20Energy%20Independence%202026-09-30/README.md).
It owns the September 30 program, covered-site and critical-load questions,
financing, project registry, source gaps and proof of tested resilience. The
[program-to-proved-resilience graphic](../FORTRESS%20America%20and%20Military%20Installation%20Energy%20Independence%202026-09-30/FORTRESS_AMERICA_PROGRAM_TO_PROVED_RESILIENCE_INFOGRAPHIC.html)
is one view of that source package, not another research owner.

For command, data and acquisition architecture, return to the separate
[Military Modernization package](../Military%20Modernization/README.md).
An award, activation agreement, installed system and accepted operating
capability remain different receipts.

## November 25, 2026 — reactor-licensing component

The [final NRC prior-authorization guidance return](NRC_PRIOR_AUTHORIZATION_FINAL_GUIDANCE_RETURN_2026-11-25.md) records November 23 issuance/effectiveness separately from the rule’s November 25 date and future application/licensing outcomes. Earlier broad evidence cutoffs remain unchanged.