---
title: TSP minutes document real Roth conversions, audit checks and an approved budget
artifact_role: factual_spine
research_id: government-hidden-control-surfaces-2026
status: current
evidence_cutoff: 2026-10-30T23:18:05-04:00
evidence_cutoff_note: Selected historical meeting recovery and current publication gaps; parent cutoffs unchanged.
---

# TSP minutes reach actual use and a Board budget decision

The May 28 joint Board/Employee Thrift Advisory Council minutes fill the
missing 2026 ETAC proceeding. The August 25 Board minutes add reported Roth
conversion use, a manual fallback during a manager’s IT incident, audit
oversight and a completed FY2027–2029 budget vote. September/October completed
records remain a separate publication gap.

## May joint meeting: operation and participant questions

The [five-page May minutes](https://www.frtib.gov/meeting_minutes/2026/2026May.pdf)
were read in full. Board and ETAC chairs separately call their bodies to order;
each approves its own prior minutes. ETAC members ask about optional Roth
conversions and contribution/withdrawal processes. The minutes do not document
a newly adopted substantive ETAC recommendation causing those services.

Staff report that January’s Roth in-plan conversion launch had reached about
27,000 participants, more than 30,000 conversions and over $683 million by the
May briefing; the separate April flow was nearly 7,000 conversions/$135 million.
These are different denominators and periods. The chair’s question elicits
that conversion is optional and has no numeric agency target. This supplies
reported actual use beyond the [earlier closeout’s launch-only gap](../Institutional%20Signals%20and%20Thesis%20Test%202025-2026/PUBLIC_DELIVERY_OPENING_CLOSEOUT_FINDINGS_2026-09-28.md).
It does not independently establish tax correctness, individual benefit,
exception handling or conversion suitability for any participant.

The May account-change and installment-timing improvements are described as
planned. The seven-day withdrawal security wait is said to remain. A proposal
to simplify updating information is not proof that the change was deployed.
ETAC adjourns at about 10:33 a.m.; the Board separately enters executive session
and finally adjourns at 11:18. Closed contents are not inferred.

## August: operating volume, fallback and qualified audit evidence

The [six-page August minutes](https://www.frtib.gov/meeting_minutes/2026/2026Aug.pdf)
were read in full. They report more than 49,000 cumulative Roth conversions
totaling approximately $1 billion. That is recurring-use evidence reported by
the operator, not an independently reconciled transaction ledger or proof ETAC
caused adoption. Satisfaction near 95% is a reported survey measure, not a
universal participant outcome.

The same record describes a June 22 State Street IT problem that prevented
electronic trade-order transmission. Staff used email and received a daily
confirmation after the 2 p.m. target; the minutes say investments were not
impacted. This is a bounded operator account of a manual fallback, not proof
every exception was harmless or all settlement/reconciliation obligations met.

Internal Audit reports recomputing a subset of Converge satisfaction metrics,
with similar results and no findings. The minutes also recount Williams
Adley’s FY2026 FISMA presentation: level-five ratings and one prior-year
recommendation still open. The auditors explicitly caution that maturity does
not remove cybersecurity risk. The underlying audit reports and their full
testing evidence were not separately inspected in this component. Neither
audit summary certifies each AI use or participant remedy.

## Board action: the budget passed

The August 25 minutes record a motion adopted without objection approving
the FY2027–2029 budget. Presented estimates were $534 million for FY2027,
$528 million for FY2028 and $519 million for FY2029. Priorities include digital
payments, phishing-resistant multifactor authentication, AI adoption,
Saver’s Match implementation and operational-resilience exercises.

This is a Board budget/planning authorization. It is not a congressional
appropriation, signed contract, obligation, payment, completed security fix,
Saver’s Match launch or measured savings. Staff describe some work as future
and distinguish development from continuing operating costs. The agency’s
reported service scale and expense estimates were not independently audited.

## Later meeting records and next evidence

The [minutes index](https://www.frtib.gov/meeting-minutes/) currently ends at
August, displaying an October 7 update. The
[October 7 ETAC notice](https://www.govinfo.gov/content/pkg/FR-2026-10-07/pdf/2026-20519.pdf)
schedules **October 20 at 10 a.m.**, including approval of the May joint
minutes and investment/participant/risk reports. The
[October 19 Board notice](https://www.govinfo.gov/content/pkg/FR-2026-10-19/html/2026-21269.htm)
schedules **October 27 at 9 a.m.** and approval of September 22 minutes. Neither
notice establishes occurrence, approval or substantive results. No exact
October ETAC/Board or September Board completed packet was recovered from
the inspected archive and focused official searches. The draft annual calendar
does not override a later event-specific notice.

Return for those completed records or cancellations, project-specific
contracts/obligations/deployments under the budget, full relevant audit and
remediation reports, conversion exceptions/corrections and participant outcomes.
The [source ledger](Meeting%20Catchup%202%202026-10-30/FRTIB_ETAC_SOURCE_LEDGER.json)
labels its preserved reader representation separately from original PDF bytes.
August action, underlying operational periods, October index maintenance and
retrieval dates remain distinct. No live roster or canonical chart is changed.
