---
title: "Network and settlement-connector review — October 26, 2026"
status: current
artifact_role: answer
research_ids: [tokenization-entity-control-map, crypto-infrastructure-comparatives]
evidence_cutoff: 2026-10-26
evidence_scope: Bounded official-site review; each source, permission, dataset and operating date remains separate.
---

# Network and settlement-connector review — October 26, 2026

Official-site refresh against the October 19 vetted supplement and the older buildout ledger. Current inspection is October 26 ET; source publication, activation and future target dates remain separate. Raw HTML/text and endpoint snapshots live in `Source Documents/Company Site Refresh 2026-10-26/`; request/HTTP receipts live in the campaign working folder.

## Changes that affect the charts

- **Ethereum:** the October 22 Foundation notice cancels the October 26 Hoodi Glamsterdam activation and 200M gas-limit schedule while EIP-8037 contract interactions are investigated. No replacement is set. Sepolia October 6 is a separate completed step; mainnet remains TBD. Earlier instructions are superseded, not an October 26 completion.
- **Solana:** the current official page reports Votor mainnet activation October 21, epoch 1064, after the initial 5,000 TowerBFT slots. Genesis is slot 459,652,999; consensus begins at the next slot. The documented read-only `getAgGenesisCert` call to the public mainnet endpoint returned a certificate object with that genesis slot on inspection. This corroborates the status report, without independent signature verification. The roughly 150ms finality figure is conditional expectation; it is not guaranteed transaction latency or fiat/legal settlement. Rotor remains future.
- **Stellar:** developer documentation lists Protocol 28 on mainnet September 16 and Protocol 29 on October 1. A saved current Horizon ledger (65155124, closed October 27 00:36:43 UTC / October 26 ET) reports protocol 29. Protocol 29 fixes security vulnerabilities and introduces no new CAPs. The older chart's Protocol 27/latest and Protocol 28/pending text is corrected. Existing named BENJI fund use justifies a live-named-use component; U.S. Bank's pilot and depository production remain separate. The joint five-year BENJI article supplies historical April/March balances and transfers, not current October balances.
- **Hedera:** v0.78.1 completed October 16. The October 22 status notice schedules v0.78.2 for October 28; it remains future. Release code behind a flag does not establish enabled cross-ledger service.
- **XDC:** its October 26 weekly report adds an SBI XDC/SBI VC Trade–Shinhan Card MOU to explore payment/settlement models. This is a dated relationship proposal, not a production corridor, new bank obligation or MoneyGram validator proof.
- **Partior:** existing live USD/SGD/EUR network remains distinct from expansion. The September 17 LSEG DiSH collaboration is in industry testing with production/onboarding targeted from Q1 2027. October 15 NBB MOU assesses potential BHD settlement subject to feasibility, operating and regulatory work. Neither is a new live currency or generally connected settlement-bank service.

## Other tracked network and connector outcomes

| Research unit | Official routes inspected and disposition |
|---|---|
| Avalanche | Current blog and prior Helicon baseline: no newer protocol activation or measured adoption receipt established in inspected routes. October 14 DIFC document-verification article is not bank money or AVAX value capture. |
| Chainlink | October 21 Q3 review reiterates September CCIP 2.0 availability, Fulcrum and Swift integrations. $85bn token value secured and $15bn migrated are company metrics, not transferred cash, revenues or bank settlement. No new general DTCC production established. |
| Bitcoin | Official releases list remains led by 31.1; no newer release than the saved July update established. Software version is not a bank permission. |
| Algorand | October 21 Foundation discussion distinguishes State Proofs, native Falcon accounts and wallet/custody migration. It does not establish full ecosystem quantum immunity, institutional production or independently audited 2.7m usage. October 22 hackathon winners are development results, not commercial bank adoption. |
| IOTA / TWIN | Current Q3 update is October 13, already held: September Starfish-Speed mainnet, SDK beta and formal snapshots; P-COOL and trade finance remain development. No newer customs acceptance or trade-settlement count established. |
| Wormhole | Current blog retains August 7 network-deprecation and June RLUSD/NTT updates. No new post-baseline institutional deployment or independently supported aggregate value claim established. |
| Quant / GBTD / TCH | October 22 panel recap stresses legal frameworks, interbank settlement and network connections. It does not add a named wholesale GBTD transaction or open the U.S. TCH service planned for H1 2027. Existing UK customer cases remain bounded. UK Finance direct page returned 403; Quant's own account is identified as such. |
| Swift ledger | Current targeted official search and DBS's September 10 report reconfirm named bank transactions. DBS explicitly says Swift matches/nets obligations on banks' own infrastructure before final settlement through existing systems. No verified expansion beyond the previously held named-bank evidence. Broader Swift HTTP route is restricted; no absence claim. |
| Fnality | Current official home/news routes show existing payment-system framing, board appointments and settlement/interoperability commentary. No new currency system, opening or named settled transaction beyond the prior baseline established in those routes. |
| AMM / solver family | No single corporate owner or permission exists to re-certify. Network/product checks above do not promote every solver/AMM to regulated cash or securities settlement; existing permission and correction-path gaps remain. |

No new astrology, public publication, app deployment or token-price thesis is inferred. Component dates are recorded without advancing every older component's evidence cutoff.

## Primary sources

- [Glamsterdam Hoodi postponement](https://blog.ethereum.org/2026/10/22/glamsterdam-hoodi-delay) — 2026-10-22. October 26 testnet activation and 200M gas-limit schedule removed; replacement and mainnet dates unset.
- [Solana Alpenglow activation and status method](https://solana.com/upgrades/alpenglow) — 2026-10-26. Current page inspected October 26, not its original June publication date. Reports October 21 mainnet Votor cutover; ~150ms is conditional expectation, Rotor future. Official RPC returned genesis slot 459652999; no independent signature validation or bank settlement inference.
- [Stellar live ledger 65155124](https://horizon.stellar.org/ledgers/65155124) — 2026-10-26. Snapshot closed 2026-10-27 00:36:43 UTC (October 26 ET), protocol_version=29; current protocol observation, not financial-use volume.
- [Stellar software versions and activation history](https://developers.stellar.org/docs/networks/software-versions) — 2026-10-26. Documentation says Protocol 28 mainnet September 16, Protocol 29 October 1; Protocol 29 is security-focused with no new CAPs.
- [Hedera mainnet status and October 28 schedule](https://status.hedera.com/) — 2026-10-22. v0.78.1 completed October 16; v0.78.2 October 28 remains scheduled at cutoff.
- [XDC October 18–24 weekly report](https://xdc.org/articles/xdc-weekly-oct-18) — 2026-10-26. SBI/Shinhan Card MOU explores payments; no production corridor, MoneyGram validator or bank-liability receipt.
- [Partior LSEG DiSH liquidity collaboration](https://partior.com/news-and-insights/partior-and-lseg-dish-collaborate-to-bring-always-on-settlement-bank-liquidity-to-partiors-cross-border-payments-network) — 2026-09-17. Industry testing; production and commercial onboarding from Q1 2027 are targets, separate from existing live Partior network.
- [Partior National Bank of Bahrain MOU](https://partior.com/news-and-insights/nbb-signs-mou-with-partior-to-explore-on-chain-bhd-settlement-capabilities) — 2026-10-15. Assessment of potential BHD settlement bank with operational and regulatory requirements; not a live BHD currency addition.
- [Quant tokenized deposit conference review](https://quant.network/events/building-a-network-of-networks-five-takeaways-from-uk-finances-tokenised-markets-and-money-conference/) — 2026-10-22. Panel commentary on rulebooks and interoperability; not a new GBTD wholesale transaction or U.S. service opening.
- [Algorand quantum readiness discussion](https://algorand.co/blog/you-cant-build-the-new-financial-system-on-outdated-cryptography) — 2026-10-21. Separates State Proofs, native post-quantum accounts and ecosystem migration; no whole-stack immunity, bank adoption or independently audited 2.7m count.
- [Chainlink Q3 review](https://chain.link/blog/quarterly-review-q3-2026) — 2026-10-21. Company-reported metrics and earlier product milestones; token value secured/migrated is not transaction flow, revenue or cash settlement.
- [DBS: September 10 Swift transactions](https://www.dbs.com/newsroom/DBS_OCBC_and_UOB_complete_first_live_blockchain_enabled_SGD_transactions_on_Swifts_ledger) — obligations matched/netted before final settlement through existing systems.
- [Stellar/Franklin BENJI five-year release](https://stellar.org/press/franklin-templeton-stellar-development-foundation-mark-five-years-of-benji-the-first-u-s-registered-tokenized-money-market-fund) — historical April/March 2026 metrics.
