{"public_navigation":{"rule":"Use these literal full URLs when your fetcher cannot open relative paths. The saved data paths and evidence clocks are unchanged.","urls":{"/library/bot/current-graphics/research/ny-projects.json":"https://freedom-250-observatory.katiekaim.chatgpt.site/library/bot/current-graphics/research/ny-projects.json"}},"schema":"f250.focused.ny-projects/v1","question":"Which big New York factory and lab projects are still under construction or only proposed?","answer":"Of the 156 sites on the New York map, 12 are under construction or commissioning, 3 have an award but no construction yet and 3 are only proposed or in permitting; the biggest by stated value are Micron White Pine campus (up to $100B), Project Double Reed ($19.46B), Chobani Rome megafactory ($1.2B).","evidence_through":"2026-09-04","check_by":null,"sections":[{"type":"stats","title":"At a glance","items":[{"value":12,"label":"Under construction or commissioning","note":"Physical build, installation, commissioning, or validation underway."},{"value":3,"label":"Awarded, not yet built","note":"Formal award, financing, or site-readiness commitment without verified construction/operation."},{"value":3,"label":"Proposed or in permitting","note":"MOU, proposal, permit, review, or demand-conditioned plan."},{"value":156,"label":"Sites on the whole map","note":"Registry evidence cutoff 2026-09-04 ET"}]},{"type":"bars","title":"By region","rows":[{"label":"Western New York","value":4,"display":"4"},{"label":"Southern Tier","value":3,"display":"3"},{"label":"Long Island","value":2,"display":"2"},{"label":"Mohawk Valley","value":2,"display":"2"},{"label":"North Country","value":2,"display":"2"},{"label":"Capital Region","value":1,"display":"1"},{"label":"Central New York","value":1,"display":"1"},{"label":"Fulton County","value":1,"display":"1"},{"label":"Hudson Valley","value":1,"display":"1"},{"label":"New York City","value":1,"display":"1"}]},{"type":"cards","title":"Site by site","sub":"Search by place, sector or infrastructure (for example 'hydropower' or 'I-90').","groups":[{"label":"Under construction or commissioning","note":"Physical build, installation, commissioning, or validation underway.","items":[{"key":"ny:micron-clay","face":3,"title":"Micron White Pine campus","sub":"Clay · Central New York","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","Up to $100B / four-fab, 20+ year New York vision"],["What","First fab in vertical construction; production target 2030"],["Sector","semiconductors"],["Infrastructure","process water, wastewater, power grid, I-90 rail corridor"],["Ownership","Not recorded in the registry"],["What the record does not prove","Long-range program value is not current spend or operating output."]],"sources":[{"label":"investors.micron.com","url":"https://investors.micron.com/news/press-release/2026/Micron-Accelerates-U-S--Investments-Pours-First-Concrete-at-New-York-Fab/default.aspx","date":null}],"anchor":"ny-micron-clay"},{"key":"ny:chobani-rome","face":3,"title":"Chobani Rome megafactory","sub":"Rome · Mohawk Valley","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","$1.2B; 1.4M square feet"],["What","Large dairy-processing plant and utility build"],["Sector","food bioprocessing"],["Infrastructure","process water, wastewater, I-90 rail corridor"],["Ownership","Not recorded in the registry"],["What the record does not prove","No direct Erie Canal freight link documented."],["Proof boundary","The linked April 22, 2025 investment announcement alone does not prove later construction. The project-state label is the saved September 4 registry classification."]],"sources":[{"label":"agriculture.ny.gov","url":"https://agriculture.ny.gov/news/governor-hochul-announces-chobani-make-nations-largest-investment-ever-natural-food-production","date":null}],"anchor":"ny-chobani-rome"},{"key":"ny:edwards-stamp","face":3,"title":"Edwards Vacuum dry-pump plant","sub":"Town of Alabama / STAMP · Western New York","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","$319M; up to $18M final CHIPS award"],["What","Plant and equipment installed; late-2026 opening/commissioning lane"],["Sector","semiconductors"],["Infrastructure","hydropower, power grid, I-90 rail corridor"],["Ownership","Not recorded in the registry"],["What the record does not prove","Sustained production and shipment not yet proven."]],"sources":[{"label":"edwardsvacuum.com","url":"https://www.edwardsvacuum.com/en-us/about-us/genesee-dry-pump-facility","date":null}],"anchor":"ny-edwards-stamp"},{"key":"ny:orbic-hauppauge","face":3,"title":"Orbic Electronics Manufacturing","sub":"Hauppauge · Long Island","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","$110 million; 144,500 square feet; designed for up to five million devices annually"],["What","Connected-device electronics manufacturing hub under buildout"],["Sector","communications"],["Infrastructure","power grid"],["Ownership","Not recorded in the registry"],["What the record does not prove","The 2025 announcement projected early-2026 production, but no later opening or first-output receipt was found."]],"sources":[{"label":"governor.ny.gov","url":"https://www.governor.ny.gov/news/made-new-york-governor-hochul-announces-groundbreaking-orbic-electronics-110-million","date":null}],"anchor":"ny-orbic-hauppauge"},{"key":"ny:electrovaya-jamestown","face":3,"title":"Electrovaya Jamestown","sub":"Jamestown · Western New York","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","$50.8M EXIM loan; state commitments"],["What","Pack assembly operating; cell line in acceptance testing"],["Sector","energy storage"],["Infrastructure","power grid"],["Ownership","Not recorded in the registry"],["What the record does not prove","Domestic cell production expected late 2026/early 2027, not yet verified."]],"sources":[{"label":"electrovaya.com","url":"https://electrovaya.com/press/electrovaya-reports-fiscal-year-q3-2026-results/","date":null}],"anchor":"ny-electrovaya-jamestown"},{"key":"ny:raymond-energy-kirkwood","face":3,"title":"Raymond Energy Solutions Manufacturing Center","sub":"Kirkwood · Southern Tier","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","$15.6 million project; up to 45 jobs"],["What","Lithium-ion solution assembly center for material-handling equipment"],["Sector","energy storage"],["Infrastructure","power grid"],["Ownership","Not recorded in the registry"],["What the record does not prove","The physical project is established; current utilization and sustained output remain unverified."]],"sources":[{"label":"esd.ny.gov","url":"https://www.esd.ny.gov/esd-media-center/press-releases/governor-hochul-announces-raymond-corporation-toyota-material-manufacturing-coe","date":null}],"anchor":"ny-raymond-energy-kirkwood"},{"key":"ny:regeneron-rensselaer","face":3,"title":"Regeneron Rensselaer","sub":"Rensselaer · Capital Region","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","350,000-square-foot fill/finish addition"],["What","Operating biologics campus; new fill/finish facility validating"],["Sector","biotech"],["Infrastructure","Hudson corridor, I-90 rail corridor"],["Ownership","Not recorded in the registry"],["What the record does not prove","Physical completion and validation do not equal approved commercial production."]],"sources":[{"label":"sec.gov","url":"https://www.sec.gov/Archives/edgar/data/872589/000087258926000008/regn-20251231.htm","date":null}],"anchor":"ny-regeneron-rensselaer"},{"key":"ny:regeneron-tarrytown","face":3,"title":"Regeneron Tarrytown R&D expansion","sub":"Tarrytown · Hudson Valley","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","Multi-phase expansion scheduled through 2027"],["What","Laboratory, preclinical manufacturing and process-development expansion"],["Sector","biotech"],["Infrastructure","power grid, Hudson corridor"],["Ownership","Not recorded in the registry"],["What the record does not prove","The operating R&D headquarters and unfinished expansion capacity are separate clocks."]],"sources":[{"label":"newsroom.regeneron.com","url":"https://newsroom.regeneron.com/news-releases/news-release-details/regeneron-announces-new-investment-manufacturing-its-industry/","date":null}],"anchor":"ny-regeneron-tarrytown"},{"key":"ny:sbmt-empire-wind","face":3,"title":"South Brooklyn Marine Terminal","sub":"Brooklyn · New York City","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","810 MW project; 2027 target operation"],["What","Empire Wind 1 staging, preassembly and O&M base"],["Sector","port logistics"],["Infrastructure","waterborne freight, power grid"],["Ownership","Not recorded in the registry"],["What the record does not prove","Port assembly/logistics, not turbine manufacturing."]],"sources":[{"label":"nyserda.ny.gov","url":"https://www.nyserda.ny.gov/All-Programs/Offshore-Wind/Focus-Areas/NY-Offshore-Wind-Projects","date":null}],"anchor":"ny-sbmt-empire-wind"},{"key":"ny:menlo-micro-ithaca","face":3,"title":"Menlo Micro Ideal Fab","sub":"Ithaca · Southern Tier","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","Company materials target the New York fab online in 2027"],["What","RF MEMS Ideal Switch fab startup and retrofit"],["Sector","semiconductors"],["Infrastructure","power grid"],["Ownership","Not recorded in the registry"],["What the record does not prove","The Ithaca site is real; commercial New York wafer output is not yet proven."]],"sources":[{"label":"menlomicro.com","url":"https://menlomicro.com/images/general/Sales_Product_Presentation-High-Speed_Digital_R4.0_08-27-2025_.pdf","date":null}],"anchor":"ny-menlo-micro-ithaca"},{"key":"ny:battery-ny","face":3,"title":"Battery-NY Prototyping Center","sub":"Johnson City / Binghamton · Southern Tier","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","97,000 square feet; first sample cells expected around end-2026"],["What","Industry-scale cell development and prototyping center"],["Sector","energy storage"],["Infrastructure","power grid, I-90 rail corridor"],["Ownership","Not recorded in the registry"],["What the record does not prove","Not a commercial gigafactory; coalition award is not all assigned to this building."]],"sources":[{"label":"eda.gov","url":"https://www.eda.gov/funding/programs/american-rescue-plan/build-back-better/finalists/the-state-university-of-new-york-at-binghamton","date":null}],"anchor":"ny-battery-ny"},{"key":"ny:moog-niagara-falls","face":3,"title":"Moog Niagara Falls","sub":"Niagara Falls · Western New York","badge":{"text":"Under construction or commissioning","cls":"green"},"kv":[["Scale","New propulsion cleanroom under construction at an existing production site"],["What","Operating propulsion site with satellite and missile cleanroom expansion"],["Sector","aerospace defense"],["Infrastructure","power grid, I-90 rail corridor"],["Ownership","Not recorded in the registry"],["What the record does not prove","Existing propulsion production is operating; expanded cleanroom output is not yet established."]],"sources":[{"label":"moog.com","url":"https://www.moog.com/news/operating-group-news/2025/niagara-falls-clean-room-expansion.html","date":null}],"anchor":"ny-moog-niagara-falls"}]},{"label":"Awarded, not yet built","note":"Formal award, financing, or site-readiness commitment without verified construction/operation.","items":[{"key":"ny:corning-canton","face":3,"title":"Corning semiconductor-glass expansion","sub":"Canton · North Country","badge":{"text":"Awarded, not yet built","cls":"blue"},"kv":[["Scale","Up to $315M; up to $32M final CHIPS award"],["What","High-purity fused-silica and ULE glass expansion"],["Sector","semiconductors"],["Infrastructure","hydropower"],["Ownership","Not recorded in the registry"],["What the record does not prove","Awarded expansion is not yet verified production capacity."]],"sources":[{"label":"commerce.gov","url":"https://www.commerce.gov/news/press-releases/2025/01/us-department-commerce-announces-chips-incentives-awards-corning","date":null}],"anchor":"ny-corning-canton"},{"key":"ny:onsemi-stony-brook","face":3,"title":"onsemi / Stony Brook SiC Research Center","sub":"Stony Brook · Long Island","badge":{"text":"Awarded, not yet built","cls":"blue"},"kv":[["Scale","$20 million project with $8 million onsemi commitment"],["What","Public-private silicon-carbide research facility"],["Sector","semiconductors"],["Infrastructure","power grid"],["Ownership","Not recorded in the registry"],["What the record does not prove","The award and site are established; construction, opening and active tool use were not verified in this pass."]],"sources":[{"label":"esd.ny.gov","url":"https://esd.ny.gov/esd-media-center/press-releases/governor-hochul-announces-20-million-state-art-semiconductor-research-facility-stony-brook","date":null}],"anchor":"ny-onsemi-stony-brook"},{"key":"ny:niagara-bottling-tryon","face":3,"title":"Niagara Bottling / Adirondack Bottling Works","sub":"Tryon Technology Park / Perth · Fulton County","badge":{"text":"Awarded, not yet built","cls":"blue"},"kv":[["Scale","Phase-one proposal: approximately 362,440 square feet, two bottling lines and 55 jobs"],["What","Proposed automated purified-water and bottle-manufacturing plant"],["Sector","food bioprocessing"],["Infrastructure","power grid, water, wastewater, road freight"],["Ownership","No public-company ticker identified."],["What the record does not prove","A land transaction, incentives and preliminary site work are established; no completed plant, installed line or operating production was verified by the cutoff."]],"sources":[{"label":"fcida.org","url":"https://www.fcida.org/february-17th-2026-meeting-minutes-2/","date":null}],"anchor":"ny-niagara-bottling-tryon"}]},{"label":"Proposed or in permitting","note":"MOU, proposal, permit, review, or demand-conditioned plan.","items":[{"key":"ny:double-reed","face":3,"title":"Project Double Reed","sub":"Town of Alabama / STAMP · Western New York","badge":{"text":"Proposed or in permitting","cls":"amber"},"kv":[["Scale","2.2M square feet; $19.46B developer proposal"],["What","Proposed 500 MW data-center campus"],["Sector","compute"],["Infrastructure","power grid, brownfield site"],["Ownership","Not recorded in the registry"],["What the record does not prove","SEQRA/site-plan stage; no verified construction or energization."]],"sources":[{"label":"gcedc.com","url":"https://www.gcedc.com/projects","date":null}],"anchor":"ny-double-reed"},{"key":"ny:aperam-titanium-center-frankfort","face":3,"title":"Aperam Recycling Titanium Solids Center of Excellence","sub":"Frankfort · Mohawk Valley","badge":{"text":"Proposed or in permitting","cls":"amber"},"kv":[["Scale","Up to 50 planned jobs; company target to become operational January 1, 2027"],["What","Company-announced automated titanium-solids processing center"],["Sector","advanced materials"],["Infrastructure","power grid, Erie Canal corridor, I-90 rail corridor"],["Ownership","Aperam Recycling is a division of Aperam S.A."],["What the record does not prove","This is a named company project with a stated locality and operating target; the reviewed source does not establish construction completion or operating output."]],"sources":[{"label":"elgmetals.com","url":"https://elgmetals.com/en-de/news/aperam-recycling-announces-state-of-the-art-titanium-center-of-excellence-in-frankfort-ny/","date":null}],"anchor":"ny-aperam-titanium-center-frankfort"},{"key":"ny:massena-data-center","face":3,"title":"NCCS/NYDIG Massena expansion","sub":"Massena · North Country","badge":{"text":"Proposed or in permitting","cls":"amber"},"kv":[["Scale","Large-load local review"],["What","Proposed roughly 635 MW expansion on former industrial land"],["Sector","compute"],["Infrastructure","power grid, brownfield site"],["Ownership","Not recorded in the registry"],["What the record does not prove","No verified construction; power source unresolved; Mohawk Council of Akwesasne opposes."]],"sources":[{"label":"akwesasne.ca","url":"https://www.akwesasne.ca/news/posts/mca-opposes-proposed-data-center-development/","date":null}],"anchor":"ny-massena-data-center"}]}],"search":true}],"uncertain":["The map keeps operating, building, pilot, awarded and proposed sites apart; an incentive, permit or power allocation is not production.","The editorial review counted 22 under-construction or proposed sites from the old map's filter; the registry has 18 with these three statuses (plus 9 research or pilot sites, not shown). The registry count is used here.","Target dates in the scale text (for example 2027 openings) are the companies' own targets.","Project-state labels are saved registry classifications. For Chobani Rome, the linked April22,2025 announcement alone does not establish later construction; its saved stage and September4,2026 cutoff remain separate from that source proof."],"sources":["New York Manufacturing and Innovation Map package: NEW_YORK_INDUSTRIAL_NODE_REGISTRY_2026.json (nodes[]), read in place.","Each card links the site's own source as the registry records it."],"research":[],"row_dates":["2026-09-04"],"pictures":[{"type":"pipeline","title":"Every New York site, by how far it has got","sub":null,"stages":[{"key":"Proposed or in permitting","label":"Proposed / permitting","tone":"announced","step":"","sub":"","side":false,"w":null},{"key":"Awarded, not yet built","label":"Awarded","tone":"pilot","step":"","sub":"","side":false,"w":null},{"key":"Under construction or commissioning","label":"Building or commissioning","tone":"live","step":"","sub":"","side":false,"w":null}],"items":[{"label":"Micron White Pine campus","stage":"Under construction or commissioning","date":null,"go":"ny-micron-clay","note":"Clay · Central New York"},{"label":"Chobani Rome megafactory","stage":"Under construction or commissioning","date":null,"go":"ny-chobani-rome","note":"Rome · Mohawk Valley"},{"label":"Edwards Vacuum dry-pump plant","stage":"Under construction or commissioning","date":null,"go":"ny-edwards-stamp","note":"Town of Alabama / STAMP · Western New York"},{"label":"Orbic Electronics Manufacturing","stage":"Under construction or commissioning","date":null,"go":"ny-orbic-hauppauge","note":"Hauppauge · Long Island"},{"label":"Electrovaya Jamestown","stage":"Under construction or commissioning","date":null,"go":"ny-electrovaya-jamestown","note":"Jamestown · Western New York"},{"label":"Raymond Energy Solutions Manufacturing Center","stage":"Under construction or commissioning","date":null,"go":"ny-raymond-energy-kirkwood","note":"Kirkwood · Southern Tier"},{"label":"Regeneron Rensselaer","stage":"Under construction or commissioning","date":null,"go":"ny-regeneron-rensselaer","note":"Rensselaer · Capital Region"},{"label":"Regeneron Tarrytown R&D expansion","stage":"Under construction or commissioning","date":null,"go":"ny-regeneron-tarrytown","note":"Tarrytown · Hudson Valley"},{"label":"South Brooklyn Marine Terminal","stage":"Under construction or commissioning","date":null,"go":"ny-sbmt-empire-wind","note":"Brooklyn · New York City"},{"label":"Menlo Micro Ideal Fab","stage":"Under construction or commissioning","date":null,"go":"ny-menlo-micro-ithaca","note":"Ithaca · Southern Tier"},{"label":"Battery-NY Prototyping Center","stage":"Under construction or commissioning","date":null,"go":"ny-battery-ny","note":"Johnson City / Binghamton · Southern Tier"},{"label":"Moog Niagara Falls","stage":"Under construction or commissioning","date":null,"go":"ny-moog-niagara-falls","note":"Niagara Falls · Western New York"},{"label":"Corning semiconductor-glass expansion","stage":"Awarded, not yet built","date":null,"go":"ny-corning-canton","note":"Canton · North Country"},{"label":"onsemi / Stony Brook SiC Research Center","stage":"Awarded, not yet built","date":null,"go":"ny-onsemi-stony-brook","note":"Stony Brook · Long Island"},{"label":"Niagara Bottling / Adirondack Bottling Works","stage":"Awarded, not yet built","date":null,"go":"ny-niagara-bottling-tryon","note":"Tryon Technology Park / Perth · Fulton County"},{"label":"Project Double Reed","stage":"Proposed or in permitting","date":null,"go":"ny-double-reed","note":"Town of Alabama / STAMP · Western New York"},{"label":"Aperam Recycling Titanium Solids Center of Excellence","stage":"Proposed or in permitting","date":null,"go":"ny-aperam-titanium-center-frankfort","note":"Frankfort · Mohawk Valley"},{"label":"NCCS/NYDIG Massena expansion","stage":"Proposed or in permitting","date":null,"go":"ny-massena-data-center","note":"Massena · North Country"}],"arrows":false,"limit":18,"picture":true}],"catalog_context":[],"research_trail":"/library/bot/current-graphics/research/ny-projects.json","interaction_contract":{"single":"Open the exact existing saved record.","aggregate":"Open every matching saved entry; each retains its date and source.","summary_only":"Label summary marks when no further per-mark detail is held on this page.","card_face":"Record title, card face or Open button expands existing detail; sources remain independent links."}}