{"canonical_id":"graphic:global-layer-one","section":"XRP Ledger assessment","record":{"key":"xrpl-review-foundation","title":"Foundation self-assessment · All 10 principles","description":"The XRP Ledger Foundation assessed the ledger against all 10 GL1 toolkit principles and says it documented evidence for each control. That scope included legal basis, settlement finality and accounting. For controls written for a single private operator, the Foundation explained how XRPL addresses the equivalent risks through protocol design, open-source governance, amendments and issuer controls.","source_refs":["xrpl","mi"],"sources":[{"id":"xrpl","title":"XRP Ledger Foundation · November 18 announcement","url":"https://pages.xrpl.foundation/xrp-ledger-gl1/"},{"id":"mi","title":"GL1 · Market Infrastructure Toolkit","url":"https://mi-toolkit.global-layer-one.org/"}],"evidence_through":"2026-11-18","evidence_date_basis":"Graphic evidence cutoff; not a source publication or event date.","public_url":"https://freedom250observatory.com/library/graphics/global-layer-one/records/xrpl-review-foundation.json","announced_on":"2026-11-18","certik_report_date":"2026-11-13","uncertainty":["The November 18 announcement describes a technical due diligence milestone. The public materials reviewed don’t identify the exact XRPL controls checked or their individual findings. Any GL1 certification, regulatory approval or production deployment would require separate evidence."],"source_path":"/xrpl_review/foundation","saved_record":{"label":"Foundation self-assessment · All 10 principles","detail":"The XRP Ledger Foundation assessed the ledger against all 10 GL1 toolkit principles and says it documented evidence for each control. That scope included legal basis, settlement finality and accounting. For controls written for a single private operator, the Foundation explained how XRPL addresses the equivalent risks through protocol design, open-source governance, amendments and issuer controls.","sources":["xrpl","mi"]}},"clock_rule":"Each graphic, study, source, announcement, report, event and target keeps its own clock. A target is not a completed implementation.","relationship_rule":"Profile links and cited design references are navigation, not evidence of membership, endorsement, GL1 adoption or production use. Catalog relationships remain in the associated study."}