Program → portfolio → operating proof
What FORTRESS America promises—and what is not proved
Click for more: Independent power for major military installations
A five-pillar resilience program whose installation-power objective is real—but whose technical constitution and delivered portfolio still have to be proved.
Current evidence state: program established → implementation constitution not yet public → fleet-wide delivery unproven.
Five mutually dependent pillars
Energy independenceIndependent power for every major U.S. installation
Supply chain + industrial baseMaterials, components, production and skilled capacity
Strategic defense reserveMunitions, fuel, medicine and blood through disruption
Installation hardening + cyberProtection against intrusion, sabotage and drones
Space + spectrumAssured sensing, navigation and communications
Three statements that must not be collapsed
Object
Covered boundary
Evidence state
FORTRESS
Every major U.S. installation; “independent power” undefined
Program objective established
10 U.S.C. §2920
Each installation’s critical-mission load
99.9% minimum annual availability required by end FY2030
Next Great American Base
One future model installation
Completely off-grid design objective, not an operating site
Evidence ladder
Select a state to see the receipt required before a claim can move.
Where the public record stops
Program direction
FORTRESS AmericaSite list, definition and funding unresolved
Selection / negotiation
Army SCISix conditional pairings
Janus + NWS CranePairings and planned 2028 deployment
EielsonNotice of intent; up to 5 MW critical load
Prototype lane
Project PeleINL demonstration, not base service
Operational description
MCAS YumaFull-load backup described
SUBASE New LondonEssential functions
McCoy + SigonellaGate / tenant-facility scope
Island test observed
MCAS MiramarMission-critical islanding; endurance still separate
Decision rule: an independence claim is only as strong as its load boundary + duration + operating-test receipt.
About this graphic and its research
Compare the program's five parts with the separate legal requirement for critical loads, then see which bases have plans, funded work, completed systems or tested results.