| Corridor by corridor · Minerals / nuclear / fusion | Element/NTS | - Sub
- Minerals / nuclear / fusion
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'Element' (name)
- Registry row: Element Materials Technology Holding USA Inc.
- pivotal third-party registry (no status field), row third-element. Role: Test powders, witness coupons and finished AM parts through chemical, mechanical, CT/NDT, failure and fatigue methods. Target status: no public qtime order or subcontract found. Still missing: QTIME order, exact U.S. lab and accredited method scope, government witness plan, blind or round-robin tests and accepted report.
- Also in: NTS Labs, LLC, National Technical Systems, Inc., Element Materials Technology, Temasek Holdings (Private) Limited
- hidden referee registry (status: pending workbench evidence), row ref-nts-element-temasek.
| |
|---|
| Corridor by corridor · Minerals / nuclear / fusion | Intertek | - Sub
- Minerals / nuclear / fusion
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'Intertek' (name)
- Registry row: Intertek Testing Services NA, Inc.
- pivotal third-party registry (no status field), row third-intertek. Role: Evaluate electrical load, power quality, cooling, enclosure, ICT, cybersecurity and turnover documentation; certify products within recognized scope. Target status: no public target test or certification assignment found. Still missing: Exact target contracting entity, recognized scope, test plan, completed results and AHJ/owner acceptance.
- Also in: Intertek Testing Services NA, Inc., Intertek Group plc
- hidden referee registry (status: pending workbench evidence), row ref-intertek.
| |
|---|
| Corridor by corridor · Failure / restart control | E3 | - Sub
- Failure / restart control
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'E3' (name)
- Registry row: E3 Consulting Services, LLC
- pivotal third-party registry (no status field), row third-e3. Role: Perform technical and commercial due diligence, fatal-flaw analysis, construction monitoring and independent-engineer reporting for lenders and investors. Target status: no public target lender or owner assignment found. Still missing: Named target financing, lender reliance letter, independent-engineer report and milestone certificate.
| |
|---|
| Corridor by corridor · Failure / restart control | Leidos owner-engineering comparators | - Sub
- Failure / restart control
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'Leidos' (name)
- Registry row: EN Engineering, LLC, ENTRUST Solutions Group, Leidos, Inc.
- hidden referee registry (status: pending workbench evidence), row ref-entrust-leidos. Role: Utility design, asset integrity, automation, program management and owner-engineering evidence within a larger federal integrator. Target status: no public science strategy target referee assignment found. Still missing: Exact EN Engineering, ENTRUST or Leidos entity; target role matrix; affiliate bids; OCI plan; reliance language and owner acceptance.
- Also in: Gossamer Security Solutions, Inc.; Leidos, Inc. AT&E; AEGISOLVE, INC.; Penumbra Security, Inc.; Advanced Data Security, LLC
- quantum and cryptographic acceptance registry (status: pending workbench evidence), row other-cst-labs.
| |
|---|
| Corridor by corridor · Failure / restart control | Intertek | - Sub
- Failure / restart control
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'Intertek' (name)
- Registry row: Intertek Testing Services NA, Inc.
- pivotal third-party registry (no status field), row third-intertek. Role: Evaluate electrical load, power quality, cooling, enclosure, ICT, cybersecurity and turnover documentation; certify products within recognized scope. Target status: no public target test or certification assignment found. Still missing: Exact target contracting entity, recognized scope, test plan, completed results and AHJ/owner acceptance.
- Also in: Intertek Testing Services NA, Inc., Intertek Group plc
- hidden referee registry (status: pending workbench evidence), row ref-intertek.
| |
|---|
| Corridor by corridor · Failure / restart control | FM-linked entities | - Sub
- Failure / restart control
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'FM' (name)
- Registry row: FM Approvals LLC, Factory Mutual Insurance Company
- hidden referee registry (status: pending workbench evidence), row ref-fm-approvals. Role: Produce product/loss-prevention certification while related FM risk engineering and insurance may separately condition treatment of an asset. Target status: no public science strategy target referee assignment found. Still missing: Separate approval certificate, engineering recommendation, owner response and bound-policy record, with exact product and standard.
- Also in: Factory Mutual Insurance Company, FM Approvals LLC
- transaction-trigger registry (status: pending workbench evidence), row risk-fm.
| |
|---|
| Corridor by corridor · Failure / restart control | Transcat | - Sub
- Failure / restart control
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'Transcat' (name)
- Registry row: Transcat, Inc.
- pivotal third-party registry (no status field), row third-transcat. Role: Create NIST-traceable calibration and facility/equipment qualification records supporting defensible data and regulatory readiness. Target status: no public target order or subcontract found. Still missing: Target order, correct site accreditation scope, approved intervals and completed IQ/OQ/PQ package.
- Also in: Transcat, Inc., Essco Calibration Laboratory, LLC, Martin Calibration, LLC
- hidden referee registry (status: pending workbench evidence), row ref-transcat.
| |
|---|
| Corridor by corridor · Failure / restart control | EPS | - Sub
- Failure / restart control
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'EPS' (row id)
- Registry row: Electric Power Systems International, Inc. d/b/a Electric Power Systems
- pivotal third-party registry (no status field), row third-eps-international. Role: Perform ATS, relay, switchgear, breaker, transformer and substation testing before equipment is placed in service. Target status: no public target commissioning plan or purchase order found. Still missing: Target commissioning plan, purchase order, passed test package and owner energization acceptance.
| |
|---|
| Corridor by corridor · Failure / restart control | Shermco | - Sub
- Failure / restart control
- Badge
- Text
- Has a row in an NSSTS registry
- Matched on
- 'Shermco' (name)
- Registry row: Shermco Industries, Inc.
- pivotal third-party registry (no status field), row third-shermco. Role: Verify electrical installation, calibration, protection and safe operating readiness. Target status: no public target site scope found. Still missing: Target-site purchase order, exact equipment list, passed commissioning package and energization record.
| |
|---|
| Corridor by corridor · Failure / restart control | specialty forensic/restart firms | - Sub
- Failure / restart control
- Badge
- Text
- A kind of firm, no company named
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|