Skip to content

Which lesser-known contractors, testers and insurers sit underneath the big national-security tech programs? — saved evidence, page 2

Saved evidence through 2026-08-19. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 21–40 of 70. Page 2 of 4.

Section context and qualifications
Uncertainty
  • Structural view only: evidence producers, operators and advisers do not inherit final authority.
  • package_synthesis — the page cites no sources per corridor; most named firms are rows in the NSSTS hidden-tier registries (pivotal third party, hidden supply chain, hidden referee, transaction trigger, quantum-cryptographic acceptance)
  • Registry rows are joined by name, or by row id where no name matched (each card's 'Matched on' line); a match on a family name such as 'Intertek' or 'FM' may be a sibling entity, and at most two matching rows are shown per name.
  • 4 of the seven hidden-tier registries are marked pending workbench evidence: NSSTS Hidden Acceptance Economy Registry; NSSTS Hidden Referee and Decision-Record Deep-Dive Registry; NSSTS Quantum and Cryptographic Acceptance Registry; NSSTS Transaction, Failure and Return-to-Service Trigger Registry. Each matched card names its registry and status.
  • Evidence through August 19, 2026 (the corridor master's own date).
SectionRecordSaved detailsSources and dates
Corridor by corridor · Grid / AI campusesPearl Street
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'Pearl Street' (name)
Registry row: Pearl Street Technologies, LLC
pivotal third-party registry (no status field), row third-pearl-street. Role: Automate power-flow model construction, constraint identification, mitigation selection and upgrade-cost estimation. Target status: no public target award or queue assignment found. Still missing: Target load or associated network-upgrade study using SUGAR and an accepted study result.
Corridor by corridor · Grid / AI campusesPowerGEM
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'PowerGEM' (name)
Registry row: PowerGEM, LLC
pivotal third-party registry (no status field), row third-powergem. Role: Build and run power-flow models, review results, develop upgrades and support cost allocation through TARA. Target status: no public target model or task found. Still missing: Named target-load model, utility assignment and accepted study output.
Corridor by corridor · Grid / AI campusesElectric Power Engineers
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'Electric Power Engineers' (name)
Registry row: Electric Power Engineers, LLC
pivotal third-party registry (no status field), row third-electric-power-engineers. Role: Determine transmission impacts, necessary upgrades and reliability mitigations. Target status: no public target load study found. Still missing: Target large-load or science-campus interconnection study and accepted utility result.
Corridor by corridor · Grid / AI campusesDoble
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'Doble' (name)
Registry row: Doble Engineering Company
pivotal third-party registry (no status field), row third-doble. Role: Test transformer, bushing, breaker and relay condition to support repair, replacement and re-energization decisions. Target status: no public target asset test order found. Still missing: Target transformer/substation service order, diagnostic result and owner permission to return to service.
Corridor by corridor · Grid / AI campusesEmprimus
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'Emprimus' (name)
Registry row: Emprimus LLC
hidden supply-chain registry (no status field), row hidden-emprimus. Role: Neutral-blocking devices protecting high-voltage transformers from geomagnetically induced current. Target status: current operating precedent. Still missing: Repeat utility orders, qualified production and longer-duration fleet evidence.
Corridor by corridor · Grid / AI campusesEPS
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'EPS' (row id)
Registry row: Electric Power Systems International, Inc. d/b/a Electric Power Systems
pivotal third-party registry (no status field), row third-eps-international. Role: Perform ATS, relay, switchgear, breaker, transformer and substation testing before equipment is placed in service. Target status: no public target commissioning plan or purchase order found. Still missing: Target commissioning plan, purchase order, passed test package and owner energization acceptance.
Corridor by corridor · Grid / AI campusesShermco
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'Shermco' (name)
Registry row: Shermco Industries, Inc.
pivotal third-party registry (no status field), row third-shermco. Role: Verify electrical installation, calibration, protection and safe operating readiness. Target status: no public target site scope found. Still missing: Target-site purchase order, exact equipment list, passed commissioning package and energization record.
Corridor by corridor · Grid / AI campusesEnerNex
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'EnerNex' (name)
Registry row: EnerNex, LLC
pivotal third-party registry (no status field), row third-enernex. Role: Develop models, functional requirements, procurement specifications, power-quality studies and field-validation plans. Target status: no public target task or subaward found. Still missing: Live target study, laboratory task, procurement specification or field demonstration with accepted results.
Corridor by corridor · Grid / AI campusesNAES-family entities
Sub
Grid / AI campuses
Badge
Text
Has a row in an NSSTS registry
Matched on
'NAES' (name)
Registry row: NAES Corporation
hidden supply-chain registry (no status field), row hidden-naes-corporation. Role: Owner-side engineering, construction monitoring, commissioning, O&M, compliance and asset management on behalf of owners. Target status: adjacent capability candidate. Still missing: Named DOE, national-laboratory, Genesis, Argonne or federal AI-site O&M, commissioning, owner-engineer or onsite-power instrument and accepted operation.
Corridor by corridor · Quantum / PNT / cryptoMaybell
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'Maybell' (row id)
Registry row: MAYBELL QUANTUM INDUSTRIES, INC.
quantum and cryptographic acceptance registry (status: pending workbench evidence), row maybell-flax. Role: Develop flexible low-thermal-load cryogenic wiring and related quantum-control infrastructure. Target status: completed component rd. Still missing: Target order, production-lot qualification and accepted integration.
Verified registry reference
maybell-flax: Completed component R&D; target order, production-lot qualification and accepted integration remain unproved.
Corridor by corridor · Quantum / PNT / cryptoXMA/Amphenol
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'XMA' (name)
Registry row: Amphenol Corporation / XMA Corporation
quantum and cryptographic acceptance registry (status: pending workbench evidence), row amphenol-xma. Role: Cryogenic RF attenuators, terminations, cabling and control/readout interconnect developed in QED-C matched R&D. Target status: completed rd parent consolidated. Still missing: Current legal seller and target qualification record.
Corridor by corridor · Quantum / PNT / cryptoBluefors
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'Bluefors' (name)
Registry row: Bluefors Oy / Bluefors Cryocooler Technologies Inc.
pivotal third-party sector-expansion registry (no status field), row sector-bluefors. Role: Provide and commission dilution refrigeration, pulse-tube cryocooling, thermalized RF I/O, cooldown automation and diagnostic logs. Target status: no public science strategy target assignment found. Still missing: Named target BOM, security and foreign-supplier review, full-wiring-load base-temperature, cooling-power, vibration, cooldown and uptime tests, helium-3 plan and signed SAT.
Also in: Bluefors Cryocooler Technologies Inc.
quantum and cryptographic acceptance registry (status: pending workbench evidence), row bluefors-cryocooler.
Corridor by corridor · Quantum / PNT / cryptoPhoton Spot
Sub
Quantum / PNT / crypto
Badge
Text
Named only in this list
Master's note
The corridor master lists this name as not found in the package registries.
For this row’s sourcing, see the saved details, section context and linked research.
Corridor by corridor · Quantum / PNT / cryptoVescent
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'Vescent' (name)
Registry row: VESCENT TECHNOLOGIES INC. / Vescent Photonics, LLC
quantum and cryptographic acceptance registry (status: pending workbench evidence), row vescent-identity-seam. Role: Develop lasers, frequency controls and timing-related quantum subsystems. Target status: active awards identity mismatch. Still missing: Resolved legal performer and target qualification.
Corridor by corridor · Quantum / PNT / cryptoFormFactor
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'FormFactor' (name)
Registry row: FormFactor, Inc.
pivotal third-party sector-expansion registry (no status field), row sector-formfactor. Role: Screen quantum devices at cryogenic temperature before scarce millikelvin integration time and create incoming-inspection or wafer-sort evidence. Target status: no public science strategy target assignment found. Still missing: Target-qualified recipes, golden devices, 4 K-to-mK correlation, contact and de-embedding controls, measurement uncertainty and signed FAT/SAT.
Also in: FormFactor, Inc.; Northrop Grumman Systems Corporation; Quantum Opus, LLC; Triton Systems, Inc.
quantum and cryptographic acceptance registry (status: pending workbench evidence), row qedc-cryogenic-cohort.
Corridor by corridor · Quantum / PNT / cryptoPHIX
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'PHIX' (name)
Registry row: PHIX B.V. / PHIX Inc.
pivotal third-party sector-expansion registry (no status field), row sector-phix. Role: Perform hybrid PIC assembly, precision fiber attach, RF and electrical interconnection, thermal and mechanical packaging and end-of-line testing. Target status: no public science strategy target assignment found. Still missing: U.S. target-approved source, export and IP review, DFM, golden module, qualified process, lot genealogy, reliability testing and domestic second-source plan.
Also in: PHIX Photonics Assembly
quantum and cryptographic acceptance registry (status: pending workbench evidence), row phix-photonic-packaging.
Corridor by corridor · Quantum / PNT / cryptoEntrust
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'Entrust' (name)
Registry row: Entrust Corporation
quantum and cryptographic acceptance registry (status: pending workbench evidence), row entrust-pki-hsm. Role: Operate federal PKI shared services and supply validated HSM infrastructure with PQC algorithm implementations under separate evidence objects. Target status: operating pki cmvp link incomplete. Still missing: Exact PQC-to-module approved-service linkage and deployed target profile.
Corridor by corridor · Quantum / PNT / cryptoWidePoint
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'WidePoint' (name)
Registry row: WidePoint Cybersecurity Solutions Corp.
quantum and cryptographic acceptance registry (status: pending workbench evidence), row widepoint-pki. Role: Operate FPKI/ECA trust services and legacy certificate infrastructure that can become a migration chokepoint. Target status: operating pki no public pqc evidence. Still missing: Public PQC product, validation and deployment evidence.
Corridor by corridor · Quantum / PNT / cryptoCrypto4A
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'Crypto4A' (name)
Registry row: Crypto4A Technologies Inc.
quantum and cryptographic acceptance registry (status: pending workbench evidence), row crypto4a-qasm. Role: Supply a sovereign HSM platform with PQC implementations and validated entropy. Target status: algorithm validated module transitioning. Still missing: Active 140-3 certificate with PQC approved-service linkage.
Corridor by corridor · Quantum / PNT / cryptoSafeLogic
Sub
Quantum / PNT / crypto
Badge
Text
Has a row in an NSSTS registry
Matched on
'SafeLogic' (name)
Registry row: SafeLogic, Inc.
quantum and cryptographic acceptance registry (status: pending workbench evidence), row safelogic-cryptocomply. Role: Provide an OEM-embeddable cryptographic module with PQC algorithms. Target status: cavp and entropy cmvp pending. Still missing: Issued 140-3 validation and exact OEM/target mapping.