If one NSSTS program fails, what else breaks, and what are the warning signs? — saved evidence, page 2

Saved evidence through 2026-08-18. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 21–35 of 36. Page 2 of 3.

Section context and qualifications
Uncertainty
  • These are the package's hypotheses about exposure. The registry says downstream positions are exposure markers, not bill-of-material links.
  • The reach rank is the package's ordering; it is not a probability.
SectionRecordSaved detailsSources and dates
Chain by chain, with the warning signs · Failure chains by reach#3 · Two wave active secure cloud reach
Sub
2 sectors · immediacy high · evidence grade A
Badge
Text
Re-check November 24, 2026
Text
An AWS authorization restriction, operating-service interruption, task reduction, or failed IL5, IL6 or OCONUS acceptance affects secure workloads.
Warning signs
ATO restriction or revocation; official service-incident notice; DWWCF scope or budget reduction; JWCC task modification or rejected workload transition
What else breaks
Secret or Restricted Data scientific workloads and DoW Olympus or Joint Operational Edge workloads could lose a common provider path.
Next re-check
November 24, 2026
What softens it
Program-specific Microsoft, Oracle, HPE or on-premises paths and workload portability may provide redundancy after authorization and migration gates.
Sectors reached
AI, secure compute and platform; Information management and cybersecurity
What the record does not prove
The two AWS relationships are direct but distinct environments and instruments; an incident in one is not proof that the other is impaired, and alternative vendors are not automatically authorized or workload-compatible.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#4 · Two wave launch and network reach
Sub
2 sectors · immediacy high · evidence grade B
Badge
Text
Re-check October 31, 2026
Text
A SpaceX launch anomaly or stand-down, assigned-mission delay, or failed Space Data Network prototype milestone occurs.
Warning signs
FAA mishap investigation or launch stand-down; SSC task reassignment; missed assigned launch date; SDN end-to-end acceptance milestone change
What else breaks
SDA or NSSL payload deployment and the separate SDN prototype-delivery clock could both slip.
Next re-check
October 31, 2026
What softens it
ULA, Blue Origin and Rocket Lab provide mission-specific alternatives, while other communications architectures may reduce SDN dependence; none is automatically interchangeable.
Sectors reached
Space, hypersonics and advanced sensing; Communications and networking
What the record does not prove
Both company paths are direct, but the registries do not establish shared vehicles, launch sites or schedules between the assigned launch missions and SDN; one program delay does not prove the other is delayed.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#5 · Four sector component reach
Sub
4 sectors · immediacy high · evidence grade B
Badge
Text
Re-check October 31, 2026
Text
Domestic rare-earth magnet blocks fail DLA or customer qualification, arrive late, or fail to reach recurring accepted output.
Warning signs
DLA lot rejection or late delivery; option not exercised; missing certificate or origin record; customer qualification or recurring-shipment delay
What else breaks
Domestic-source constraints could affect motors, guidance, beam-control positioning, tactical terminals and aerospace mechanisms.
Next re-check
October 31, 2026
What softens it
Three domestic magnet paths, inventory, design substitution and alternate motor topologies provide partial redundancy after platform qualification.
Sectors reached
Critical materials and component supply chains; Space, hypersonics and advanced sensing; Directed energy; Communications and networking
What the record does not prove
DLA orders and magnet capacity paths are direct, but no registry source assigns MP, Noveon or eVAC magnets to the named hypersonic, laser or SATCOM edges; downstream edge IDs are representative exposure markers only.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#6 · Three sector scientific compute reach
Sub
3 sectors · immediacy high · evidence grade B
Badge
Text
Past due, no record
Text
The Argonne frontier-AI center's final agreement, financing, power, cooling or accepted-capacity milestone slips.
Warning signs
final center instrument remains unsigned; financing structure remains unresolved; power or liquid-cooling readiness slip; accepted capacity is below announced scope
What else breaks
Scientific-model, materials-simulation and autonomous-laboratory workloads may be deferred or shifted even if accelerators and software are available.
Next re-check
August 27, 2026
What softens it
Other DOE systems, LANL Mission and Vision, Lux and Discovery, and authorized cloud capacity may absorb selected workloads after portability and security checks.
Sectors reached
AI, secure compute and platform; Semiconductors and microelectronics; Autonomous laboratories and scientific infrastructure
What the record does not prove
The center and compute partnerships are direct; no source proves every Genesis or autonomous-lab workload is assigned to Argonne or that alternate systems have spare authorized capacity.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#7 · Three sector autonomous lab reach
Sub
3 sectors · immediacy medium-high · evidence grade B
Badge
Text
Re-check November 24, 2026
Text
AMP2, M2PC or another autonomous-laboratory testbed is delayed, fails equipment integration, or does not produce an accepted closed-loop workflow.
Warning signs
construction or commissioning delay; selected bill of material remains unpublished; equipment order or integration subcontract is absent; closed-loop experiment metrics fail acceptance
What else breaks
Shared experimental capacity, closed-loop biological or materials discovery, and structured data generation could slow.
Next re-check
November 24, 2026
What softens it
Multiple national-lab testbeds, manual workflows and distributed commercial laboratories provide partial redundancy.
Sectors reached
Autonomous laboratories and scientific infrastructure; Biotechnology and biomanufacturing; AI, secure compute and platform
What the record does not prove
Ginkgo's AMP2 role is direct; Periodic, Chemspeed and Universal Robots do not yet have confirmed orders for the new testbeds, and a facility delay does not prove Ginkgo's separate DARPA or surveillance paths fail.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#8 · Two sector commercial relay reach
Sub
2 sectors · immediacy medium-high · evidence grade B
Badge
Text
Re-check November 18, 2026
Text
A NASA commercial-relay demonstration fails, a constellation or terminal slips, or NASA does not transition the demonstrations to recurring procurement.
Warning signs
planned 2027 end-to-end demonstration slips; terminal or constellation readiness delay; service-qualification failure; no recurring operational solicitation or task order
What else breaks
Civil-space missions expecting commercial relay may retain legacy relay or direct-to-Earth dependencies or delay operating concepts.
Next re-check
November 18, 2026
What softens it
Multiple CSP providers, the Near Space Network and legacy or direct links offer partial mission-specific redundancy.
Sectors reached
Communications and networking; Space, hypersonics and advanced sensing
What the record does not prove
The demonstration relationships are direct, but no registry source assigns a particular W3 mission to these services; a funded Space Act Agreement or successful PExT test is not recurring operational service.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#9 · Three sector memory packaging reach
Sub
3 sectors · immediacy medium · evidence grade B
Badge
Text
Re-check December 31, 2026
Text
A domestic HBM or advanced-packaging project suffers construction, tool-installation, commissioning or accelerator-qualification delay.
Warning signs
CHIPS construction or milestone-payment delay; tool installation or commissioning slip; customer qualification remains unnamed; no qualified U.S. HBM production date
What else breaks
Conversion to domestically fabricated or packaged HBM and accelerators for scientific and secure AI could slow.
Next re-check
December 31, 2026
What softens it
Intel packaging and foreign or legacy supply chains may provide capacity, subject to origin, security and customer-qualification requirements.
Sectors reached
Semiconductors and microelectronics; AI, secure compute and platform; Information management and cybersecurity
What the record does not prove
CHIPS awards and facilities are direct; announced nameplate is not output, and no registry source assigns these facilities to NVIDIA, AMD, OpenAI or Google workloads.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#10 · Three sector pnt infrastructure reach
Sub
3 sectors · immediacy high · evidence grade B
Badge
Text
Re-check October 31, 2026
Text
GPS IIIF delivery, launch, on-orbit checkout or acceptance fails or slips.
Warning signs
GPS IIIF delivery slip; launch reassignment or anomaly; failed on-orbit test; acceptance or constellation-transition delay
What else breaks
Communications and precision mission systems could remain dependent on the older GPS constellation longer than planned.
Next re-check
October 31, 2026
What softens it
Atomic-clock, magnetic-navigation and inertial paths can add resilience after quantitative validation and program integration.
Sectors reached
Quantum information, sensing and resilient PNT; Communications and networking; Space, hypersonics and advanced sensing
What the record does not prove
The GPS successor transition is direct; magnetic navigation and atomic-clock paths are not drop-in replacements for GPS, are not broadly accepted operational substitutes, and their edge IDs mark mitigation candidates rather than confirmed dependencies.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#11 · Three sector ir optics reach
Sub
3 sectors · immediacy high · evidence grade B
Badge
Text
Re-check October 31, 2026
Text
Germanium refining equipment is delayed, refined material misses purity requirements, or domestic germanium or silicon optics fail component acceptance.
Warning signs
equipment commissioning delay; certificate-of-analysis or purity failure; accepted component record absent; recurring qualified shipment absent
What else breaks
Domestic IR detector and optic availability for sensing, tracking and laser-related systems could remain constrained.
Next re-check
October 31, 2026
What softens it
Recycling, inventory and alternate optical materials or designs provide partial redundancy after system qualification.
Sectors reached
Critical materials and component supply chains; Space, hypersonics and advanced sensing; Directed energy
What the record does not prove
The material and optics capacity investments are direct, but the registry does not establish a 5N-to-Lattice supply contract or assignment to a named W3 or W4 platform; downstream edges are representative exposure markers.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#12 · Two wave hpe integration reach
Sub
2 sectors · immediacy high · evidence grade B
Badge
Text
Re-check October 31, 2026
Text
An HPE integration or support failure occurs, or the DISA Cloud Instance signatory and first deployment milestone cannot be resolved and executed.
Warning signs
executed DCI OTA still does not name the legal entity; first accepted DCI deployment milestone slips; Mission or Vision integration milestone slips; support or acceptance defect recurs across programs
What else breaks
DOE exascale or AI integration and sovereign distributed private-cloud deployment could slip in parallel.
Next re-check
October 31, 2026
What softens it
Program-specific alternate integrators, public-cloud paths and existing on-premises systems may provide redundancy after integration and authorization.
Sectors reached
AI, secure compute and platform; Information management and cybersecurity
What the record does not prove
The W1 HPE Company path is direct; the W4 exact legal counterparty remains unresolved and cannot be consolidated as CONFIRMED, and no source proves that the same business unit, workforce or facility supports both paths.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#13 · Two wave ginkgo platform reach
Sub
2 sectors · immediacy high · evidence grade A
Badge
Text
Re-check October 31, 2026
Text
Ginkgo's autonomous-platform commissioning, DARPA RPM independent validation, or current genomic-surveillance contract path fails or lapses.
Warning signs
AMP2 construction or commissioning slip; RPM independent metric failure; no named operational transition customer; current CDC, BARDA or diagnostic-network contract absent
What else breaks
Autonomous experimental capacity, protein-manufacturing validation and genomic-surveillance continuity could each lose a named company path.
Next re-check
October 31, 2026
What softens it
Other DARPA performers, federal laboratories and independent surveillance networks provide program-specific alternatives.
Sectors reached
Autonomous laboratories and scientific infrastructure; Biotechnology and biomanufacturing
What the record does not prove
All three relationships are direct, but a failure in one Ginkgo program does not establish failure, cross-default or shared-facility impairment in the others.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#14 · Two sector quantum fabrication reach
Sub
2 sectors · immediacy high · evidence grade B
Badge
Text
Re-check October 31, 2026
Text
Quantum CHIPS letters of intent expire or fail to become definitive agreements, named sites and qualified fabrication or packaging output.
Warning signs
LOI expiration or scope change; recipient legal entity or site remains unresolved; definitive agreement is not executed; wafer or package qualification fails
What else breaks
Domestic quantum fabrication and packaging redundancy would remain unbuilt, leaving quantum-system programs on existing supply paths.
Next re-check
October 31, 2026
What softens it
Multiple LOI recipients and existing foundry or pilot routes provide partial redundancy, subject to qubit-specific process compatibility.
Sectors reached
Quantum information, sensing and resilient PNT; Semiconductors and microelectronics
What the record does not prove
The LOIs are direct but are not final awards; failure to convert a LOI does not automatically terminate QBI or US2QC participation, and no qualified output is yet established.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#15 · Three sector nde qualification reach
Sub
3 sectors · immediacy high · evidence grade B
Badge
Text
Re-check October 31, 2026
Text
A QTIME rapid inspection system fails speed, repeatability or transition acceptance.
Warning signs
inspection system misses speed or repeatability metric; acceptance record is absent; no transition to DoD, FAA or NASA production; audit or process-control failure
What else breaks
Additive-part qualification could remain slower for flight and weapon-system production.
Next re-check
October 31, 2026
What softens it
Conventional NDE and multiple project teams provide slower but potentially usable alternatives.
Sectors reached
Advanced manufacturing and industrial qualification; Space, hypersonics and advanced sensing; Directed energy
What the record does not prove
QTIME performer selection is direct, but no source ties QTIME to a specific hypersonic, satellite or directed-energy production line; downstream edge IDs are representative qualification exposure only.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#16 · Three sector exact company reach
Sub
3 sectors · immediacy high · evidence grade B
Badge
Text
Past due, no record
Text
A firm-wide Booz Allen eligibility, suspension or capacity event affects multiple exact-entity contracts; a single program test failure is not sufficient.
Warning signs
SAM exclusion or eligibility action; Thunderdome option not exercised; Navy wireless contract not definitized or accepted; HPM follow-on recompete loss
What else breaks
DoDNet migration, Navy wireless installation and HPM test support could each lose the same exact contractor path.
Next re-check
October 18, 2026
What softens it
Program-specific recompetes and alternate integrators or test contractors provide separate replacement paths.
Sectors reached
Information management and cybersecurity; Communications and networking; Directed energy
What the record does not prove
The three Booz Allen Hamilton Inc. relationships are direct, but shared staffing, infrastructure and cross-default terms are not established; one edge does not prove impairment of the others.
Last checked
August 18, 2026
Chain by chain, with the warning signs · Failure chains by reach#17 · Three sector parent family reach
Sub
3 sectors · immediacy high · evidence grade C
Badge
Text
Re-check October 31, 2026
Text
A parent-wide Lockheed eligibility or common-component disruption affects multiple programs; a program-specific laser failure alone is not sufficient.
Warning signs
parent-wide eligibility or supply action; GPS IIIF delivery slip; LRHW or interceptor test failure; JLWS or IFPC acceptance failure; HELIOS operational-test or replication failure
What else breaks
PNT spacecraft, hypersonic or interceptor work and directed-energy prototypes could slip only under a genuinely parent-wide common-cause event.
Next re-check
October 31, 2026
What softens it
Program-specific competitors and separate business or legal entities limit some common-cause exposure.
Sectors reached
Quantum information, sensing and resilient PNT; Space, hypersonics and advanced sensing; Directed energy
What the record does not prove
Individual relationships are direct, but Lockheed Martin Corporation and Lockheed Martin Aculight Corp. are separate canonical legal entities; IFPC trouble does not prove GPS, hypersonic or HELIOS trouble.
Last checked
August 18, 2026