Skip to content

Which organizations, technical components and control roles make up Stellar? — saved evidence, page 1

Saved evidence through 2026-10-26. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 1–11 of 11. Page 1 of 1.

Section context and qualifications
Uncertainty
  • This is a focused selection of saved records, not a census or a fresh check of later changes. Each card retains its source, date role and complete saved fields.
  • The pictures use neutral marks. Recorded status words belong to the cited owner and are not a new score, legal ruling or operating certification.
SectionRecordSaved detailsSources and dates
Complete records · Stellar: its nodesStellar validators
Badge
Text
Current operating
Lane
regulated
Kind
consensus operators
Status
independent quorum participants
Summary
Validators reach agreement under the Stellar Consensus Protocol using configured trust relationships.
Boundary
Validator participation does not confer asset-issuer or custodial authority.
Operational state
current operating
Crypto Hub checked through
2026-10-03
Links
Reference record
Title
Stellar validators
Badge
Text
Current operating
Date
2026-10-03
Date kind
Crypto Hub checked through
Lane
regulated
Kind
consensus operators
Status
independent quorum participants
Summary
Validators reach agreement under the Stellar Consensus Protocol using configured trust relationships.
Boundary
Validator participation does not confer asset-issuer or custodial authority.
Operational state
current operating
Sources
Needs primary source
No
Provenance
Reference page
link-d-operators
Section id
d-nodes-stellar
Declared home
Research Packages/Fintech and Private Rails/Tokenization Entity and Control Map 2026-09-01/TOKENIZATION_ENTITY_RELATIONSHIP_REGISTRY_2026-09-01.json › nodes
Reference anchor
node-stellar-validators
Reference key
node:stellar-validators
Original reference anchor
node-stellar-validators
Reference keys
  • node:stellar-validators
Complete records · Stellar: its nodesStellar asset issuers
Badge
Text
Current operating
Lane
regulated
Kind
issued asset authorities
Status
asset-specific control
Summary
Organizations create issued assets and define redemption and authorization terms.
Boundary
Issuer obligations sit outside the Stellar protocol and vary by asset.
Operational state
current operating
Crypto Hub checked through
2026-10-03
Links
Reference record
Title
Stellar asset issuers
Badge
Text
Current operating
Date
2026-10-03
Date kind
Crypto Hub checked through
Lane
regulated
Kind
issued asset authorities
Status
asset-specific control
Summary
Organizations create issued assets and define redemption and authorization terms.
Boundary
Issuer obligations sit outside the Stellar protocol and vary by asset.
Operational state
current operating
Sources
Needs primary source
No
Provenance
Reference page
link-d-operators
Section id
d-nodes-stellar
Declared home
Research Packages/Fintech and Private Rails/Tokenization Entity and Control Map 2026-09-01/TOKENIZATION_ENTITY_RELATIONSHIP_REGISTRY_2026-09-01.json › nodes
Reference anchor
node-stellar-issuers
Reference key
node:stellar-issuers
Original reference anchor
node-stellar-issuers
Reference keys
  • node:stellar-issuers
Complete records · Stellar: its nodesStellar anchors
Badge
Text
Current operating
Lane
market
Kind
fiat asset gateways
Status
regulated or commercial access layer
Summary
Businesses connect fiat, deposits, withdrawals and issued assets to the Stellar network.
Boundary
Anchor claims and customer protections depend on the named entity and jurisdiction.
Operational state
current operating
Crypto Hub checked through
2026-10-03
Links
Reference record
Title
Stellar anchors
Badge
Text
Current operating
Date
2026-10-03
Date kind
Crypto Hub checked through
Lane
market
Kind
fiat asset gateways
Status
regulated or commercial access layer
Summary
Businesses connect fiat, deposits, withdrawals and issued assets to the Stellar network.
Boundary
Anchor claims and customer protections depend on the named entity and jurisdiction.
Operational state
current operating
Sources
Needs primary source
No
Provenance
Reference page
link-d-operators
Section id
d-nodes-stellar
Declared home
Research Packages/Fintech and Private Rails/Tokenization Entity and Control Map 2026-09-01/TOKENIZATION_ENTITY_RELATIONSHIP_REGISTRY_2026-09-01.json › nodes
Reference anchor
node-stellar-anchors
Reference key
node:stellar-anchors
Original reference anchor
node-stellar-anchors
Reference keys
  • node:stellar-anchors
Complete records · Stellar: its nodesDTC Stellar tokenization connection
Badge
Text
Announced only
Lane
market
Kind
market infrastructure initiative
Status
2026 initiative
Summary
DTC announced work to connect its tokenization service with the Stellar public blockchain.
Boundary
An announced connection is not completed production, universal asset support or delegation of DTC's legal records.
Operational state
announced
Crypto Hub checked through
2026-10-03
Links
Reference record
Title
DTC Stellar tokenization connection
Badge
Text
Announced only
Date
2026-10-03
Date kind
Crypto Hub checked through
Lane
market
Kind
market infrastructure initiative
Status
2026 initiative
Summary
DTC announced work to connect its tokenization service with the Stellar public blockchain.
Boundary
An announced connection is not completed production, universal asset support or delegation of DTC's legal records.
Operational state
announced
Sources
Needs primary source
No
Provenance
Reference page
link-d-operators
Section id
d-nodes-stellar
Declared home
Research Packages/Fintech and Private Rails/Tokenization Entity and Control Map 2026-09-01/TOKENIZATION_ENTITY_RELATIONSHIP_REGISTRY_2026-09-01.json › nodes
Reference anchor
node-dtc-stellar
Reference key
node:dtc-stellar
Original reference anchor
node-dtc-stellar
Reference keys
  • node:dtc-stellar
Complete records · Stellar: its nodesAlso in this family (printed in full under an earlier family): 2 nodes
Nodes
Linked electronic systems and DLT components · SEC proposal 34-106246
Record date
2026-09-01
Source link
No publisher URL is recorded in this row.
Links
Reference record
Title
Also in this family (printed in full under an earlier family): 2 nodes
Date
2026-09-01
Nodes
  • Linked electronic systems and DLT components
  • SEC proposal 34-106246
Sources
    Needs primary source
    No
    Provenance
    Reference page
    link-d-operators
    Section id
    d-nodes-stellar
    Declared home
    Research Packages/Fintech and Private Rails/Tokenization Entity and Control Map 2026-09-01/TOKENIZATION_ENTITY_RELATIONSHIP_REGISTRY_2026-09-01.json › nodes
    Reference anchor
    family-stellar-shared
    Reference key
    family:stellar:shared
    Original reference anchor
    family-stellar-shared
    Reference keys
    • family:stellar:shared
    For this row’s sourcing, see the saved details, section context and linked research.
    Latest saved developments · Planned integrationSecuritize plans Stellar integration
    Group
    stellar
    Source date
    2026-10-28
    Evidence state
    Planned integration
    Summary
    Issuance/management integration is announced, with products and further details still to come.
    Boundary
    Timing/completion risk remains; no launched Stellar fund or exact subsidiary/record arrangement established.
    Ecosystem ids
    • stellar
    • securitize
    Node ids
    • stellar-ledger
    • securitize-corp
    Source ids
    • meridian-securitize-2026-10-28
    Research path
    Research Packages/Fintech and Private Rails/MERIDIAN_STELLAR_COMPONENTS_2026-10-28.md
    Next proof
    Named products, completed connection and authoritative record/servicing terms.
    Reading source id
    current-reading-meridian-2026-10-28
    Graphic ids
    • network-roles-stellar
    • network-roles-securitize
    • securitize-product-lifecycle
    • link-d-operators
    Reading
    /library/readings/f75b7469b9a6315979a8.html
    • Securitize plans Stellar integration ·
      Publisher
      Securitize / SDF
      Date
      2026-10-28
      Boundary
      Planned integration subject to timing/completion risk; products and exact subsidiary roles remain to be announced.
    Latest saved developments · Company-announced launch€GOVY adds euro government-bill exposure
    Group
    stellar
    Source date
    2026-10-28
    Evidence state
    Company-announced launch
    Summary
    Archax announces an auto-rolling euro government-bill product on Stellar, with eligible institutional access via its named EU distribution route.
    Boundary
    No funded issuance or collateral pledge inspected; government-bill exposure is not a euro cash/stablecoin claim.
    Ecosystem ids
    • stellar
    Node ids
    • stellar-ledger
    Source ids
    • meridian-eurgovy-2026-10-28
    Research path
    Research Packages/Fintech and Private Rails/MERIDIAN_STELLAR_COMPONENTS_2026-10-28.md
    Next proof
    Product terms, issuance, holdings, redemption and actual eligible collateral use.
    Reading source id
    current-reading-meridian-2026-10-28
    Graphic ids
    • network-roles-stellar
    • cash-claim-components
    • link-d-operators
    Reading
    /library/readings/f75b7469b9a6315979a8.html
    • Archax announces €GOVY on Stellar ·
      Publisher
      Archax / SDF
      Date
      2026-10-28
      Boundary
      Announced product launch; no funded issuance, balance, completed collateral pledge or universal regulatory treatment established.
    Latest saved developments · Reported live pilotPontoro tests managed private-fund liquidity
    Group
    stellar
    Source date
    2026-10-28
    Evidence state
    Reported live pilot
    Summary
    Pontoro Stellar ALP, LP combines liquid assets and private-fund interests; Archax issues restricted pool-interest tokens.
    Boundary
    Manager retains valuation/control; no secondary market. Redemption may be delayed, reduced or suspended; stress results unverified.
    Ecosystem ids
    • stellar
    Node ids
    • stellar-ledger
    Source ids
    • meridian-pontoro-2026-10-28
    Research path
    Research Packages/Fintech and Private Rails/MERIDIAN_STELLAR_COMPONENTS_2026-10-28.md
    Next proof
    Offering terms, reconciled holdings and completed or stressed redemptions.
    Reading source id
    current-reading-meridian-2026-10-28
    Graphic ids
    • network-roles-stellar
    • crypto-cash-out-routes
    • liquidity-interval
    • link-g-failure
    • link-d-operators
    Reading
    /library/readings/f75b7469b9a6315979a8.html
    • Pontoro reports Stellar ALP pilot ·
      Publisher
      Pontoro / SDF
      Date
      2026-10-28
      Boundary
      Reported live pilot; restricted interests, no secondary market, and redemptions may be delayed, reduced or suspended.
    Latest saved developments · Company-announced launchJQQQ adds an equity-linked fund claim
    Group
    stellar
    Source date
    2026-10-27
    Evidence state
    Company-announced launch
    Summary
    Janus Henderson/Centrifuge report a Nasdaq-100 tracking fund launch exclusively on Stellar.
    Boundary
    Eligible non-U.S. investors only; indirect fund exposure, not constituent shareholder rights. No funded subscription, redemption or collateral use inspected.
    Ecosystem ids
    • stellar
    Node ids
    • stellar-ledger
    Source ids
    • meridian-jqqq-2026-10-27
    Research path
    Research Packages/Fintech and Private Rails/MERIDIAN_ADDITIONAL_PRODUCTS_AND_COVERAGE_2026-10-28.md
    Next proof
    Investor rights, authoritative record, funded subscriptions and reconciled holdings.
    Reading source id
    current-reading-additional-2026-10-28
    Graphic ids
    • network-roles-stellar
    • claims-and-safekeeping-jobs
    • link-d-operators
    Reading
    /library/readings/f8699d3789e77fc515b4.html
    • Janus Henderson / Centrifuge announce JQQQ ·
      Publisher
      Janus Henderson / Centrifuge / SDF
      Date
      2026-10-27
      Boundary
      Company-announced launch for eligible non-U.S. investors; no funded subscription, holdings reconciliation, redemption or collateral use inspected.
    Latest saved developments · FutureNet technology previewProject Thruput previews execution capacity
    Group
    stellar
    Source date
    2026-10-28
    Evidence state
    FutureNet technology preview
    Summary
    SDF previews execution inside a validator, scaling work across machines.
    Boundary
    Not end-to-end mainnet throughput, independently reproduced testing or a current mainnet fee change.
    Ecosystem ids
    • stellar
    Node ids
    • stellar-ledger
    • stellar-development-foundation
    Source ids
    • meridian-thruput-2026-10-28
    Research path
    Research Packages/Fintech and Private Rails/MERIDIAN_STELLAR_COMPONENTS_2026-10-28.md
    Next proof
    Reproduced results and any separately approved mainnet transition.
    Reading source id
    current-reading-meridian-2026-10-28
    Graphic ids
    • network-roles-stellar
    • technology-evidence-language
    • link-d-operators
    Reading
    /library/readings/f75b7469b9a6315979a8.html
    • Stellar Project Thruput preview ·
      Publisher
      Stellar Development Foundation
      Date
      2026-10-28
      Boundary
      FutureNet execution-engine preview within a validator; not measured end-to-end mainnet throughput or current mainnet fee change.
    Latest saved developments · Planned corridor; chronology holdMovantis corridor retains a date hold
    Group
    stellar
    Source date
    2026-10-28 access; October29 body dateline
    Evidence state
    Planned corridor; chronology hold
    Summary
    A source accessible October28 describes a planned USDC/Stellar U.S.–El Salvador route through Movantis subsidiaries/partners.
    Boundary
    Announcement chronology was unresolved at the saved review. Existing corporate network flows are not Stellar volume or completed payouts.
    Ecosystem ids
    • stellar
    Node ids
    • stellar-ledger
    Source ids
    • meridian-movantis-chronology-2026-10-28
    Research path
    Research Packages/Fintech and Private Rails/MERIDIAN_ADDITIONAL_PRODUCTS_AND_COVERAGE_2026-10-28.md
    Next proof
    Confirm source/event date, named regulated providers, launch terms and completed payouts.
    Reading source id
    current-reading-additional-2026-10-28
    Graphic ids
    • network-roles-stellar
    • crypto-cross-border-routes
    • link-d-operators
    • link-i-watch
    Reading
    /library/readings/f8699d3789e77fc515b4.html
    • Movantis planned corridor, source-date hold ·
      Publisher
      Movantis / SDF
      Date
      2026-10-28 access; body dateline 2026-10-29
      Boundary
      Accessible October28 source datelined October29; chronology unresolved at review. U.S.–El Salvador route planned; existing network flows are not Stellar volume.