Skip to content

The watch: what is dated, overdue, or still unknown? — saved evidence, page 5

Saved evidence through 2026-11-04. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 81–100 of 1689. Page 5 of 85.

Section context and qualifications
Uncertainty
  • Past due means the date passed and the home holds no record dated on or after it. Work may have happened outside the library.
  • Most Innovation Exemption and Fed-proposal clocks count from an event (publication, notice, filing) that has not happened, so they have no calendar date yet.
  • Open questions carry their master's check-by date, not a date of their own.
  • Return Ledger questions are included when their question or tags name a crypto subject; the full ledger is on the government waiting-on page.
SectionRecordSaved detailsSources and dates
Already happened, as recorded (346 dated items, newest first)Hong Kong: Live HKMA and SFC registers and issuer and bank product surfaces were checked at the evidence cutoff
Badges
  • Text
    published
Date
2026-10-01
As of
2026-10-01
Needs primary source
No
Entities
    Pages
    When
    2026-10-01
    Status
    published
    Home
    International Crypto Map · Hong Kong
    Detail
    A cutoff snapshot must be refreshed for later licensing, suspension, withdrawal, Full Launch, reserve attestation or product launch claims.
    Already happened, as recorded (346 dated items, newest first)China: Current instruments, operator rosters, infrastructure, six-large-bank products and route claims were recertified through the intraday cutoff
    Badges
    • Text
      published
    Date
    2026-10-01
    As of
    2026-10-01
    Needs primary source
    No
    Entities
      Pages
      When
      2026-10-01
      Status
      published
      Home
      International Crypto Map · China
      Detail
      No post-15 September operating-state delta was found; later law, readiness, incident and transaction evidence requires a new cutoff.
      Already happened, as recorded (346 dated items, newest first)United Arab Emirates: CBUAE, VARA, DFSA, SCA, ADGM and the four D-SIB bank records were recertified through the intraday evidence cutoff
      Badges
      • Text
        published
      Date
      2026-10-01
      As of
      2026-10-01
      Needs primary source
      No
      Entities
        Pages
        When
        2026-10-01
        Status
        published
        Home
        International Crypto Map · United Arab Emirates
        Detail
        The fresh sweep found no post-15 September crypto regime or operating-state delta; a cutoff snapshot must still be refreshed for later licences, conditions, suspensions, launches and transactions.
        Already happened, as recorded (346 dated items, newest first)Switzerland: Swiss authority, infrastructure and four-systemic-bank records were recertified through the intraday cutoff
        Badges
        • Text
          published
        Date
        2026-10-01
        As of
        2026-10-01
        Needs primary source
        No
        Entities
          Pages
          When
          2026-10-01
          Status
          published
          Home
          International Crypto Map · Switzerland
          Detail
          No post-15 September crypto operating-state delta was found; the cutoff remains provisional for later-day publications.
          Already happened, as recorded (346 dated items, newest first)France: SG-FORGE disclosed EUR 167.01 million EURCV and USD 12.55 million USDCV in circulation
          Badges
          • Text
            scale disclosed
          Date
          2026-10-01
          As of
          2026-10-01
          Needs primary source
          No
          Entities
          • Name
            Société Générale
          Pages
          When
          2026-10-01
          Status
          scale disclosed
          Home
          International Crypto Map · France
          Detail
          Dated supply and reserve allocation are issuer disclosures, not independent assurance, holder count or redemption performance.
          Already happened, as recorded (346 dated items, newest first)Treasury's procedure for certifying state regimes takes effect, but intake is closed
          Badges
          • Text
            In effect not open
          Date
          2026-09-30
          As of
          2026-10-21
          Needs primary source
          No
          Entities
            Pages
            When
            September 30, 2026
            Status
            in effect not open
            Home
            GENIUS Act milestones
            Detail
            Treasury (Stablecoin Certification Review Committee). Interim final rule, effective September 30; comments due November 30. Treasury will not accept certifications until the paperwork approval comes through and it posts an acceptance notice. No state has been certified
            Already happened, as recorded (346 dated items, newest first)United States: Open USD launched on Base, Ethereum, Solana and Tempo
            Badges
            • Text
              technical launch
            Date
            2026-09-30
            As of
            2026-10-01
            Needs primary source
            No
            Entities
            • Name
              OUSD
            • Name
              Ethereum
            • Name
              Solana
            Pages
            When
            2026-09-30
            Status
            technical launch
            Home
            International Crypto Map · United States
            Detail
            Live contracts and integration paths do not establish outstanding supply, current reserve balances, first monthly attestation or redemption performance.
            Already happened, as recorded (346 dated items, newest first)United Kingdom: FCA cryptoasset authorization gateway opened at 09:00
            Badges
            • Text
              applications open
            Date
            2026-09-30
            As of
            2026-10-01
            Needs primary source
            No
            Entities
              Pages
              When
              2026-09-30
              Status
              applications open
              Home
              International Crypto Map · United Kingdom
              Detail
              An open application window and any submitted application are not an authorization, permission or product launch.
              Already happened, as recorded (346 dated items, newest first)Japan: First On-Chain Finance Forum and roadmap work program
              Badges
              • Text
                published
              Date
              2026-09-30
              As of
              2026-10-03
              Needs primary source
              No
              Entities
                Pages
                When
                2026-09-30
                Status
                published
                Home
                International Crypto Map · Japan
                Detail
                National coordination and study agenda; not a rule, permission, settlement system or issuance.
                Already happened, as recorded (346 dated items, newest first)European Union: ESMA published MiCA review recommendations
                Badges
                • Text
                  published
                Date
                2026-09-30
                As of
                2026-10-01
                Needs primary source
                No
                Entities
                  Pages
                  When
                  2026-09-30
                  Status
                  published
                  Home
                  International Crypto Map · European Union
                  Detail
                  Recommendations on lending, DeFi, marketing and enforcement are not current rules.
                  Already happened, as recorded (346 dated items, newest first)European Union: Commission targeted MiCA-review consultation closed
                  Badges
                  • Text
                    published
                  Date
                  2026-09-30
                  As of
                  2026-10-01
                  Needs primary source
                  No
                  Entities
                    Pages
                    When
                    2026-09-30
                    Status
                    published
                    Home
                    International Crypto Map · European Union
                    Detail
                    Consultation close is not a Commission proposal, adopted amendment or effective law.
                    Already happened, as recorded (346 dated items, newest first)Australia: ASIC no-action filing hinge reached with more than 45 applications recorded
                    Badges
                    • Text
                      effective
                    Date
                    2026-09-30
                    As of
                    2026-10-01
                    Needs primary source
                    No
                    Entities
                      Pages
                      When
                      2026-09-30
                      Status
                      effective
                      Home
                      International Crypto Map · Australia
                      Detail
                      Conditional no-action treatment and application are not licences; non-qualifying firms risk breach from 1 October.
                      Already happened, as recorded (346 dated items, newest first)Australia: ANZ, BHP, Citi and Swift completed live Melbourne-New York USD tokenized-deposit payments
                      Badges
                      • Text
                        first transaction
                      Date
                      2026-09-30
                      As of
                      2026-10-01
                      Needs primary source
                      No
                      Entities
                      • Name
                        Citi
                      • Name
                        Swift
                      Pages
                      When
                      2026-09-30
                      Status
                      first transaction
                      Home
                      International Crypto Map · Australia
                      Detail
                      Value, exact final-system entries, beneficiary credit, recurring scale and exceptions were not disclosed.
                      Already happened, as recorded (346 dated items, newest first)South Africa: Draft Crypto Assets Manual comment period closed
                      Badges
                      • Text
                        effective
                      Date
                      2026-09-30
                      As of
                      2026-10-01
                      Needs primary source
                      No
                      Entities
                        Pages
                        When
                        2026-09-30
                        Status
                        effective
                        Home
                        International Crypto Map · South Africa
                        Detail
                        Closing consultation did not finalize, enact or commence the proposed cross-border framework.
                        Already happened, as recorded (346 dated items, newest first)Ghana: Bank of Ghana's target for general VASP application and fee pages elapsed; both remained unavailable at the 1 October cutoff
                        Badges
                        • Text
                          scheduled
                        Date
                        2026-09-30
                        As of
                        2026-10-01
                        Needs primary source
                        No
                        Entities
                          Pages
                          When
                          2026-09-30
                          Status
                          scheduled
                          Home
                          International Crypto Map · Ghana
                          Detail
                          A missed public-interface target is an implementation-state observation, not proof that the Act is ineffective, that no private supervisory work occurred or that an applicant was rejected.
                          Already happened, as recorded (346 dated items, newest first)Fed proposes how its member banks apply to issue stablecoins through a subsidiary (R-1900)
                          Badges
                          • Text
                            Proposed
                          Date
                          2026-09-29
                          As of
                          2026-10-21
                          Needs primary source
                          No
                          Entities
                            Pages
                            When
                            September 29, 2026
                            Status
                            proposed
                            Home
                            GENIUS Act milestones
                            Detail
                            Federal Reserve Board. Published September 29; comments due November 30, 2026
                            Already happened, as recorded (346 dated items, newest first)Fed proposes reserve, capital and redemption standards for the issuers it supervises (R-1899)
                            Badges
                            • Text
                              Proposed
                            Date
                            2026-09-29
                            As of
                            2026-10-21
                            Needs primary source
                            No
                            Entities
                              Pages
                              When
                              September 29, 2026
                              Status
                              proposed
                              Home
                              GENIUS Act milestones
                              Detail
                              Federal Reserve Board. Announced September 24; published September 29; comments due November 30, 2026
                              Already happened, as recorded (346 dated items, newest first)United States: SEC filed alleged USD15 million cross-border crypto confidence-scam case
                              Badges
                              • Text
                                stress observed
                              Date
                              2026-09-29
                              As of
                              2026-10-01
                              Needs primary source
                              No
                              Entities
                                Pages
                                When
                                2026-09-29
                                Status
                                stress observed
                                Home
                                International Crypto Map · United States
                                Detail
                                A complaint and requested freeze are allegations and procedural steps, not adjudication, restitution or proof of failure at a regulated platform.
                                Already happened, as recorded (346 dated items, newest first)Japan: TradeWaltz stablecoin-linked trade-document experiment selected as PIP-4
                                Badges
                                • Text
                                  announced
                                Date
                                2026-09-29
                                As of
                                2026-10-03
                                Needs primary source
                                No
                                Entities
                                  Pages
                                  When
                                  2026-09-29
                                  Status
                                  announced
                                  Home
                                  International Crypto Map · Japan
                                  Detail
                                  Support decision and experiment plan; no completed trade, payment or bank-settlement leg.
                                  Already happened, as recorded (346 dated items, newest first)Brazil: CSD BR and Ripple announce a first-phase XRPL record mirror for selected BTG Pactual fund shares
                                  Badges
                                  • Text
                                    published
                                  Date
                                  2026-09-29
                                  As of
                                  2026-10-01
                                  Needs primary source
                                  No
                                  Entities
                                  • Name
                                    CSD BR
                                  • Name
                                    Ripple
                                  • Name
                                    XRP Ledger
                                  • Name
                                    BTG Pactual
                                  Pages
                                  When
                                  2026-09-29
                                  Status
                                  published
                                  Home
                                  International Crypto Map · Brazil
                                  Detail
                                  The named operators report live use, but CSD BR's system remains the official record and no public project issuance ID or transaction hash was located.