Failure and remedy: when it breaks, who can freeze, who pays, who decides? — saved evidence, page 22
Saved evidence through 2026-11-03. This table projects the linked graphic data; it does not refresh the underlying research.
Return to the graphic · Complete saved JSON
Rows 419–438 of 446. Page 22 of 23.
Section context and qualifications
- Sub
- 18 of 36 can freeze or block; 15 are not stated in the terms read; 2 have no freeze power found.
- Sub
- Who controls the assets, how claims are decided, and how much has come back, case by case.
- Sub
- Structured research register separating technical acceptance, failed constitutional layer, correction, evidence authority and loss status.
- Sub
- 37 enacted, 4 introduced and not enacted. Tracker data is a discovery and comparison instrument. State session law controls. Blank effective dates are unresolved; enacted does not imply effective.
- Sub
- Cases whose question, standing or stakes concern crypto, blockchain records, stablecoins or crypto custody.
- Sub
- In date order within each case.
- Sub
- Every row in another room that names a firm, coin, network or system shown on this page and is not already shown here, found by the whole-library index. Grouped by room (tap a room to open it), newest first within each home; each row names its home and pointer, where it is read in full.
- Checked through
- 2026-11-03
- Baseline evidence through
- 2026-11-03
- Rule
- Selected dated changes only. The structural comparison, broad maturity, scale and stress assessments keep their original sources and clocks.
- Uncertainty
- 'Not stated' means the terms read did not say; it does not mean the issuer cannot freeze.
- The programmable-payment failure register gives an evidence grade for each case but no source links; those rows carry the no-link label.
- Tracker data is a discovery and comparison instrument. State session law controls. Blank effective dates are unresolved; enacted does not imply effective.
- Collapse rows carry the International Crypto Map's cutoff date; the cases themselves run back to 2014.
| Section | Record | Saved details | Sources and dates |
|---|---|---|---|
| Also in the library (305 rows in 11 other rooms) | XRP / Ripple |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | Asset–Obligation–Authority — Control Map |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | DLT Energy-Finance Convergence Timeline |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | Energy Infrastructure Continuous Finance — Source Document |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | House Financial Services — Strengthening the American Economy |
|
|
| Also in the library (305 rows in 11 other rooms) | The Ledger Goes Live — DTC's First Tokenized Trades in Production |
|
|
| Also in the library (305 rows in 11 other rooms) | Cleveland Studies the Crypto Household — "Do You Even Crypto, Bro?" |
|
|
| Also in the library (305 rows in 11 other rooms) | OCC: Stablecoin Issuer AML/CFT and Sanctions Compliance Programs |
|
|
| Also in the library (305 rows in 11 other rooms) | The Community Banks Ask Kansas City to Take Kraken's Account Back |
|
|
| Also in the library (305 rows in 11 other rooms) | CFTC Policy Statement on Perpetual Contracts (Bitcoin Futures) |
|
|
| Also in the library (305 rows in 11 other rooms) | DTCC Sets Tokenization Timeline: July 2026 Pilot, October 2026 Launch |
|
|
| Also in the library (305 rows in 11 other rooms) | World Liberty Trust Company Files for a National Charter — the President's Family at the OCC's Door |
|
|
| Also in the library (305 rows in 11 other rooms) | 26 executive orders signed Day One |
|
|
| Also in the library (305 rows in 11 other rooms) | Annex - Institutional Ledgers & Wholesale Rails |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | Annex - Market Access, Custody & the Charter Queue |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | Continuous Underwriting and Programmable Credit — Source Document |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | Circle–IBM Blockchain Patent Portfolio — Disclosure Audit |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | Circle–IBM Patent Claims — Wave 2 Taxonomy |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | Circle–IBM Patent Portfolio — Landscape and Cluster Map |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Also in the library (305 rows in 11 other rooms) | Circle–IBM Patent Universe — Wave 1 Recovery |
| For this row’s sourcing, see the saved details, section context and linked research. |