Skip to content

The operators: which companies and networks run it, and how far along is each? — saved evidence, page 66

Saved evidence through 2026-10-26. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 1162–1181 of 3717. Page 66 of 194.

Section context and qualifications
Uncertainty
  • Primary sources only (Katie, 2026-10-19): official records and the actor's own documents. News, newsletters, blogs and law-firm summaries were removed on 2026-10-19; what rested on them is held in masters/_held/needs_primary_source_2026-10-19.json.
  • July deck sources carry no dates in the library; their 'date' is null unless re-verified on the web. Web sources checked on 2026-10-19 carry their publication date.
  • Technical finality, authoritative legal record and cash or redemption remedy are separate endpoints. Proposal, staff position, registration, ownership, partnership, software capability, pilot and production are different facts and clocks.
  • This is a capability-and-receipt map, not a league table, safety rating or investment view. A group can lead one surface and depend on another institution for the claim, authoritative record, cash, custody, collateral rulebook or remedy.
  • This is a functional and control comparison, not a ranking of safety, adoption, token value or investment merit. A live partner connection is not group ownership, and an approved or conditional charter is not automatically an operating service.
  • A place on this map records a bounded capability or comparison. It does not establish SEC selection, TSV qualification, a production integration, legal equivalence between models or an investment view.
  • This ledger records dated technology, deal and operating receipts. Announcements, integrations, pilots, availability, named live use and scaled use remain separate states. Company-reported activity is not independently verified volume, legal finality, token value capture or control of a third-party network.
  • The bank comparison, field guide and build-out ledger carry their own cutoffs (late September to October 3); the build-status master (October 19) is current where they differ.
  • placements.json is an index whose rows copy from their homes; its legal rows are on link E, and its countries and timeline rows belong to links H and I (not built in this wave).
  • The Major Bank Digital Transition package has no JSON registry in this workbench (README only); its comparison is read from BANK_TRANSITION_COMPARISON_2026-09-26.json.
SectionRecordSaved detailsSources and dates
Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedswift-ledger · New build
Date
2026-10-01
Date kind
Date
Name
Swift Hackathon 2026: ISO 20022 corporate-actions prototype for tokenized equities
Legal entities
S.W.I.F.T. SC (Swift), Chainlink Labs
Networks
Four blockchains (not named in the source)
State
research
Date
2026-10-01
Summary
Chainlink says a hackathon solution using ISO 20022 messages to run a cash dividend on tokenized equities across four blockchains was named runner-up; Swift published the hackathon winners on Oct 1.
Boundary
Hackathon prototype; not deployed.
Vetted
  • Verdict: confirmed
  • Evidence quote: Runners-up ... Business Challenge: Chainlink Labs
  • Reason: Swift's Oct 1 page (now opened) confirms Chainlink Labs as Business Challenge runner-up; the solution description (cash dividend across four blockchains, ISO 20022 throughout) comes from Chainlink's own Sibos recap about its own entry. 'research' fits.
Needs primary source
No
Question pages
Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedswift-ledger · New deal
Date
2026-09-28
Date kind
Date
Counterparty
'Most of the 17' roster banks (not named)
Legal entities
S.W.I.F.T. SC (Swift)
State
pilot
Date
2026-09-28
Summary
Swift says most of the 17 early-adopter banks have now used the ledger for 24/7 real-time payments in EUR, GBP, HKD, SGD and USD, moving tokenized value between Africa, Asia, Australia, Europe, North America and South America, for institution-to-institution settlement, corporate treasury and interbank funding. The ledger's dated cases stop at Sep 7.
Boundary
Only 8 banks are named in published cases; amounts, transaction logs, finality terms and loss rules are not disclosed. Press relays of a Swift Community post say at least 19 banks are expected to use the ledger by end-2026 (press only).
Vetted
  • Verdict: confirmed
  • Evidence quote: Most of the 17 first-mover banks ... have now used it for 24/7 real-time payments
  • Reason: Date, five currencies, six regions and use cases confirmed. Swift calls the release an 'MVP' and the banks 'first-mover'; its product page lists them as 'Pilot banks', which supports 'pilot'.
Needs primary source
No
Question pages
Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedswift-ledger · State change: Swift blockchain-based shared ledger (ecosystem transition state)
Date
2026-09-28
Date kind
Date
Item
Swift blockchain-based shared ledger (ecosystem transition state)
From state
live named use
To state
pilot
Date
2026-09-28
Evidence
Reclassification, not a new event: the banks' own disclosures call the activity live pilots or a controlled proof of concept (Citi: July-December 2026), Swift gives no general-availability date as of its Sep 28 statement, and the newer master (checked Oct 19) labels it 'pilot'. Under the ladder, 'pilot' means a bounded participant or transaction trial, which matches what the participants describe.
Vetted
  • Verdict: confirmed
  • Evidence quote: Pilot banks ... pilot initial live transactions
  • Reason: Swift's product page lists 17 'Pilot banks' with no availability date; Citi's Sep 2, 2026 release calls its activity 'a focused, controlled proof-of-concept phase running from July to December 2026'; Swift's Sep 28 page gives no general-availability date.
Needs primary source
No
Question pages
Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedswift-ledger · Master correction
Date
2026-10-19
Date kind
Home checked through
File
_Workspace/Indexes/masters/crypto_companies_and_networks.json
Field
chains
Library says
'Swift's own shared ledger (the underlying technology provider is not recorded in the library)'.
Evidence says
Swift's Sep 29, 2025 release says it 'will work with Consensys on a conceptual prototype of the ledger'. Swift has not publicly named the production stack. Suggest recording 'Swift said it would work with Consensys on a conceptual prototype (2025-09-29); production stack not disclosed'. Oracle's Sep 28, 2026 release describes only Oracle's own connecting platform as EVM-based.
Vetted
  • Verdict: narrowed
  • Evidence quote: Swift will work with Consensys on a conceptual prototype of the ledger
  • Reason: The 2025 release states a plan to work with Consensys, not that Consensys built the prototype; the quoted phrase in the input was not verbatim.
Needs primary source
No
Question pages
Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedswift-ledger · Master correction
Date
2026-10-19
Date kind
Home checked through
File
_Workspace/Indexes/masters/crypto_companies_and_networks.json
Field
operator
Library says
'Swift (bank-owned cooperative)'.
Evidence says
Swift's by-laws are issued by the legal entity S.W.I.F.T. SC (a Belgian cooperative company); suggest naming it in the operator field.
Vetted
  • Verdict: confirmed
  • Evidence quote: a limited liability company with the form of a cooperative company
  • Reason: By-laws (now opened) name S.W.I.F.T. SC, Society for Worldwide Interbank Financial Telecommunication, governed by Belgian law.
Needs primary source
No
Question pages
Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum: what changed, September 27 to October 19
Badge
Text
Live available
Date
2026-10-26
Date kind
Checked through
Ecosystem id
ethereum
Ledger refreshed through
2026-09-27
Checked through
2026-10-26
Proposed transition state
live available
Proposed basis
The network is live and Glamsterdam only reached public testnets (Sepolia activated Oct 6; Hoodi scheduled Oct 26; mainnet date not decided, per the Ethereum Foundation Oct 16 post); hosted named products are tracked as separate deals.
Open questions
  • Glamsterdam mainnet activation date (not decided as of Oct 16, 2026).
  • JPMD on Ethereum: contract address, first named client transaction, circulating balance, and the booking legal entity as stated by J.P. Morgan.
  • Has tokenized ARKVX actually been issued on Ethereum, and which Securitize entity is transfer agent?
  • zerohash legal entity providing Interactive Brokers' ETH staking.
  • Hegotá: no finalized scope found in the window.
Site review 2026 10 26
  • Checked on: 2026-10-26
  • Scope: Official pages and source snapshots in wave 5; prior component dates retained unless specifically amended.
  • Result path: COMPANY_SITE_REFRESH_WAVE_05_NETWORKS_2026-10-26.md
Needs primary source
No
Question pages
    Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · New build
    Date
    2026-10-06
    Date kind
    Date
    Name
    Glamsterdam Sepolia activation; Hoodi schedule superseded
    Legal entities
    Ethereum Foundation
    Networks
    Ethereum Sepolia testnet, Ethereum Hoodi testnet
    State
    testnet
    Date
    2026-10-06
    Summary
    Sepolia activated October6. The earlier October26 Hoodi/200M gas-limit schedule in this source was superseded by the Foundation’s October22 postponement; replacement and mainnet dates unset.
    Boundary
    This dated testnet milestone does not establish Hoodi or mainnet activation. See the separate October22 superseding notice.
    Vetted
    • Verdict: confirmed
    • Evidence quote: Hoodi at epoch 132,352 ... (October 26, 2026, 17:42:48 UTC). The mainnet activation date has not yet been decided.
    • Reason: Network foundation's own post. States Sepolia activation Oct 6, 2026 (epoch 353,024), Hoodi schedule, 200M gas limit, EIP-7732 and EIP-7928. Erigon, go-ethereum and Reth had no Hoodi release listed, which supports the client-readiness boundary.
    Historical summary before oct22
    Glamsterdam activated on Sepolia on Oct 6, 2026 (epoch 353,024). Hoodi activation is scheduled for Oct 26, 2026 at 17:42:48 UTC, with the Hoodi gas limit rising to 200M. Main contents include enshrined proposer-builder separation (EIP-7732) and block-level access lists (EIP-7928).
    Needs primary source
    No
    Question pages
      Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · New build
      Date
      2026-10-22
      Date kind
      Date
      Name
      Hoodi Glamsterdam postponed
      Date
      2026-10-22
      State
      roadmap
      Summary
      October 26 Hoodi activation and 200M gas-limit schedule removed; replacement date unset.
      Boundary
      Sepolia October 6 remains distinct; mainnet not scheduled.
      Networks
      ethereum
      Vetted
      • Verdict: confirmed
      • Reason: Sepolia October 6 remains distinct; mainnet not scheduled.
      Needs primary source
      No
      Question pages
        Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · New deal
        Date
        2026-10-19
        Date kind
        Date
        Counterparty
        J.P. Morgan (Kinexys) - JPM Coin (JPMD) deposit token on Ethereum mainnet
        State
        live limited
        Date
        2026-10-19
        Summary
        J.P. Morgan says its USD deposit token JPM Coin (JPMD), already on Base, is now live on Ethereum mainnet for J.P. Morgan institutional clients, for peer-to-peer transfers between those clients.
        Boundary
        The release names only J.P. Morgan, Kinexys by J.P. Morgan and J.P. Morgan Payments; no legal entity is named. JPMorgan Chase Bank, N.A. is not in the source and comes only from the stablecoins master. The release says Ethereum 'the Layer 1 blockchain network' (the word 'mainnet' is not used). No client, first transaction, contract address or balance disclosed; the $4 trillion and $7 billion figures cover all of Kinexys.
        Vetted
        • Verdict: narrowed
        • Evidence quote: JPM Coin goes live on Ethereum ... Available to J.P. Morgan's institutional clients
        • Reason: Live status, institutional clients, peer-to-peer transfers and the Base precedent are all supported. The legal entity JPMorgan Chase Bank, N.A. does not appear in the source, so it is removed from legal_entities.
        State note
        Limited under the Observatory rule: a service open only to a bank's own eligible clients is limited, not live.
        Needs primary source
        No
        Question pages
          Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · New deal
          Date
          2026-10-13
          Date kind
          Date
          Counterparty
          Interactive Brokers - ETH staking for clients (via zerohash)
          Legal entities
          Interactive Brokers Group, Inc., Interactive Brokers LLC
          State
          live available
          Date
          2026-10-13
          Summary
          Interactive Brokers announced that eligible Interactive Brokers LLC clients can stake ETH through the Staking Dashboard in Client Portal, with staking provided by zerohash. ETH only at launch.
          Boundary
          Availability varies by affiliate and country of residence; no client count or staked amount disclosed. zerohash's legal entity is not named in the release.
          Vetted
          • Verdict: confirmed
          • Evidence quote: At launch, eligible Interactive Brokers LLC clients can stake Ethereum.
          • Reason: Company's own release. Names Interactive Brokers Group, Inc. (About section) and Interactive Brokers LLC; says 'Staking services are provided by zerohash'; ETH only at launch; availability varies by affiliate and country.
          Needs primary source
          No
          Question pages
            Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · New deal
            Date
            2026-09-24
            Date kind
            Date
            Counterparty
            ARK Investment Management / Securitize - tokenized ARK Venture Fund (ARKVX) on Ethereum
            Legal entities
            ARK Investment Management LLC, ARK Venture Fund
            State
            announced
            Date
            2026-09-24
            Summary
            ARK and Securitize announced that tokenized interests in ARK Venture Fund, a closed-end interval fund, will be available on Ethereum to eligible investors accessing the fund through Securitize.
            Boundary
            The release is forward-looking ('upon release'); no live token, holder count or amount was confirmed. The release text names Securitize both as 'Securitize Corp.' and 'Securitize, Inc.', and no transfer agent is named, so the Securitize entity is left out.
            Vetted
            • Verdict: confirmed
            • Evidence quote: Upon release, tokenized ARKVX will be available on Ethereum.
            • Reason: Accepted as the deal party's own press release carried on a wire service (source line 'SOURCE Securitize'), not a news article. Supports 'announced' only. Names ARK Investment Management LLC and ARK Venture Fund (closed-end interval fund).
            Needs primary source
            No
            Question pages
              Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · State change: Glamsterdam / Hegotá roadmap
              Date
              2026-10-06
              Date kind
              Date
              Item
              Glamsterdam / Hegotá roadmap
              From state
              roadmap
              To state
              testnet
              Date
              2026-10-06
              Evidence
              Glamsterdam (not Hegotá) activated on the Sepolia public testnet on Oct 6, 2026; Hoodi follows on Oct 26. Hegotá remains roadmap; no new Hegotá evidence was found.
              Vetted
              • Verdict: confirmed
              • Evidence quote: Glamsterdam activated on Sepolia ... epoch 353,024 ... (UTC 2026-10-06 13:53:36)
              • Reason: Supports Glamsterdam reaching public testnet on Oct 6, 2026. The page does not mention Hegota, which fits the item's statement that Hegota stays at roadmap.
              Needs primary source
              No
              Question pages
                Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · Legal event: Time-limited (five-year) conditional exemptions letting 'Tokenized Securities Venues' trade tokenized NMS stock through gated automated-market-maker pools, with smart contracts required on a public, permissionless ledger; volume and symbol caps apply.
                Badge
                Text
                Exemptive order issued (Release No. 34 106402)
                Date
                2026-09-17
                Date kind
                Date
                Legal entity
                U.S. Securities and Exchange Commission
                Regulator
                U.S. Securities and Exchange Commission
                Status
                Exemptive order issued (Release No. 34-106402)
                Date
                2026-09-17
                Vetted
                • Verdict: confirmed
                • Evidence quote: must be auditable, public, and deployed on a public, permissionless distributed ledger
                • Reason: The order and press release 2026-90 both load. Five-year expiry, TSVs, AMM Liquidity Pools and symbol/volume caps (Tier 1: 75 symbols / 0.25% ADV; Tier 2: 250 / 2.5%) are confirmed; it also requests comment.
                Needs primary source
                No
                Question pages
                  Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · Legal event: Proposed rules under the Advisers Act and Investment Company Act for crypto-asset custody by registered advisers and regulated funds, including letting state trust companies act as custodians and permitting self-custody in some cases.
                  Date
                  2026-10-01
                  Date kind
                  Date
                  Legal entity
                  U.S. Securities and Exchange Commission
                  Regulator
                  U.S. Securities and Exchange Commission
                  Status
                  Proposed (Release 2026-100 / IA-7023); 60-day comment period from Federal Register publication
                  Date
                  2026-10-01
                  Vetted
                  • Verdict: confirmed
                  • Evidence quote: allow the use of state trust companies as custodians for client and regulated fund crypto assets
                  • Reason: Press release 2026-100 (Oct 1, 2026) and the proposing release both load. Confirms the Advisers Act / Investment Company Act custody proposal, state trust companies, limited self-custody, and 60 days for comment after Federal Register publication. Note: 2026-100 is the press-release number; the rule release numbers are IA-7023 and IC-36353.
                  Needs primary source
                  No
                  Question pages
                    Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · Legal event: SEC approved the exchange rule change to list six 3x daily-leveraged VS Trust funds, including a 3x Ether ETF (futures-based, not holding ETH).
                    Date
                    2026-10-02
                    Date kind
                    Date
                    Legal entity
                    Cboe BZX Exchange, Inc.; Volatility Shares LLC (sponsor of VS Trust)
                    Regulator
                    U.S. Securities and Exchange Commission
                    Status
                    Exchange listing rule change approved (Release No. 34-106577). The order does not address whether the funds' registration is effective or whether trading has begun.
                    Date
                    2026-10-02
                    Vetted
                    • Verdict: narrowed
                    • Evidence quote: the proposed rule change (SR-CboeBZX-2026-065) be, and hereby is, approved.
                    • Reason: Order confirms six funds incl. 3x Ether ETF, futures-based, VS Trust sponsored by Volatility Shares LLC, listed on Cboe BZX Exchange, Inc. The order says nothing about registration effectiveness, so 'registration not yet effective, so no trading' is removed.
                    Needs primary source
                    No
                    Question pages
                      Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedethereum · Master correction
                      Date
                      2026-10-19
                      Date kind
                      Home checked through
                      File
                      stablecoins.json
                      Field
                      chains
                      Library says
                      ["Base", "Kinexys private ledger (Blockchain Deposit Accounts)"] (evidence_through 2026-09-30)
                      Evidence says
                      J.P. Morgan states JPM Coin (JPMD) is now live on Ethereum mainnet as of Oct 19, 2026; Ethereum should be added.
                      Vetted
                      • Verdict: confirmed
                      • Evidence quote: JPM Coin goes live on Ethereum ... the Layer 1 blockchain network
                      • Reason: The issuer's own release supports adding Ethereum (Layer 1) to the chains field as of Oct 19, 2026.
                      Needs primary source
                      No
                      Question pages
                        Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedsolana: what changed, September 27 to October 19
                        Badge
                        Text
                        Live named use
                        Date
                        2026-10-26
                        Date kind
                        Checked through
                        Ecosystem id
                        solana
                        Ledger refreshed through
                        2026-09-27
                        Checked through
                        2026-10-26
                        Proposed transition state
                        live named use
                        Proposed basis
                        Named live payment products continue (Western Union/MoneyGram per ledger) and new live products added in the window (Open USD on Solana Sep 30; Fiserv platform with Bank of North Dakota's Roughrider Coin Oct 1), though volumes remain undisclosed or foundation-reported.
                        Open questions
                        • Did Alpenglow activate on mainnet-beta on Oct 21, 2026, and did the 82% stake genesis certificate complete?
                        • Exact mainnet activation date of the 250ms slot target (epoch 1,019).
                        • Roughrider Coin: transaction volume, and whether VersaBank or VersaBank USA, N.A. is the legal issuer.
                        • Solana DvP: production release date and first named participant.
                        • Samsung Wallet: did the U.S. launch happen in the last week of October, and with which issuer/ramp entities?
                        • Column's exact legal entity name and launch date for Solana stablecoin conversion.
                        • OUSD supply on Solana specifically.
                        Site review 2026 10 26
                        • Checked on: 2026-10-26
                        • Scope: Official pages and source snapshots in wave 5; prior component dates retained unless specifically amended.
                        • Result path: COMPANY_SITE_REFRESH_WAVE_05_NETWORKS_2026-10-26.md
                        Needs primary source
                        No
                        Question pages
                          Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedsolana · New build
                          Date
                          2026-10-19
                          Date kind
                          Home checked through
                          Name
                          250ms target slot time on mainnet
                          Legal entities
                          Solana Foundation
                          Networks
                          Solana mainnet-beta
                          State
                          live available
                          Summary
                          The Solana Foundation reports slots are now produced with a 250ms target (down from 400ms, via a 350ms step), starting at block 440,208,000 (epoch 1,019); the September roundup ties it to a Sept 18 changelog with Transaction V1. Measured skip rate stayed low; vote latency rose in Asia and South America.
                          Boundary
                          Exact activation date not stated in the post (published Sep 28). Measurements are foundation-authored, not independent. Supersedes the ledger's 300ms figure.
                          Vetted
                          • Verdict: confirmed
                          • Evidence quote: Solana activated Transaction V1 on mainnet alongside ... a 250-millisecond target slot time
                          • Reason: Network foundation's own posts. The Sep 28 'Slot Time Reduction Effects' post states 'now producing slots with a 250ms target, going down from 400ms', with the 350ms step and block 440,208,000 / epoch 1,019. Neither post gives an activation date, so date stays null; 'Sept 18' appears only in a link URL.
                          Needs primary source
                          No
                          Question pages
                            Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedsolana · New build
                            Date
                            2026-09-25
                            Date kind
                            Date
                            Name
                            Alpenglow consensus upgrade
                            Networks
                            Solana devnet
                            State
                            testnet
                            Date
                            2026-09-25
                            Summary
                            Alpenglow went live on Solana devnet on Sept 25, 2026, opening the consensus upgrade to developer and validator testing ahead of a mainnet deployment.
                            Boundary
                            Devnet only. The mainnet-beta date (Oct 21, ~14:50 UTC), the 82% stake threshold and the Firedancer note came from an Anza X post that would not load, so they are removed.
                            Vetted
                            • Verdict: narrowed
                            • Evidence quote: Alpenglow went live on devnet ... ahead of mainnet deployment
                            • Reason: Devnet launch on Sept 25 is confirmed by the Solana Foundation. The Anza X post would not load, so the mainnet schedule is unsupported and removed.
                            Historical milestone note
                            Devnet stage at September25; superseded as the latest stage by the separately recorded October21 mainnet Votor cutover.
                            Needs primary source
                            No
                            Question pages
                              Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedsolana · New build
                              Date
                              2026-10-06
                              Date kind
                              Date
                              Name
                              Solana DvP (atomic delivery-versus-payment escrow program)
                              Legal entities
                              Solana Foundation
                              Networks
                              Solana
                              State
                              announced
                              Date
                              2026-10-06
                              Summary
                              Open-source (MIT) escrow program to settle asset and payment legs together, supporting SPL Token and Token-2022 issuer controls. Externally audited (auditors not named). J.P. Morgan gave input on settlement practice only.
                              Boundary
                              The foundation says it is 'ready for use with real funds' but is still recruiting design partners 'ahead of the production release'; no named user or transaction. J.P. Morgan explicitly did not design, endorse or guarantee it.
                              Vetted
                              • Verdict: confirmed
                              • Evidence quote: welcomes design partners and early participants ahead of the production release
                              • Reason: Foundation's own program. Confirms MIT license, external audits (auditors unnamed), SPL Token / Token-2022 support, 'ready for use with real funds', and J.P. Morgan's input-only role with disclaimer. 'Announced' is a correct reading because production release is still ahead.
                              Needs primary source
                              No
                              Question pages