Skip to content

The operators: which companies and networks run it, and how far along is each? — saved evidence, page 62

Saved evidence through 2026-10-26. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 1091–1110 of 3717. Page 62 of 194.

Section context and qualifications
Uncertainty
  • Primary sources only (Katie, 2026-10-19): official records and the actor's own documents. News, newsletters, blogs and law-firm summaries were removed on 2026-10-19; what rested on them is held in masters/_held/needs_primary_source_2026-10-19.json.
  • July deck sources carry no dates in the library; their 'date' is null unless re-verified on the web. Web sources checked on 2026-10-19 carry their publication date.
  • Technical finality, authoritative legal record and cash or redemption remedy are separate endpoints. Proposal, staff position, registration, ownership, partnership, software capability, pilot and production are different facts and clocks.
  • This is a capability-and-receipt map, not a league table, safety rating or investment view. A group can lead one surface and depend on another institution for the claim, authoritative record, cash, custody, collateral rulebook or remedy.
  • This is a functional and control comparison, not a ranking of safety, adoption, token value or investment merit. A live partner connection is not group ownership, and an approved or conditional charter is not automatically an operating service.
  • A place on this map records a bounded capability or comparison. It does not establish SEC selection, TSV qualification, a production integration, legal equivalence between models or an investment view.
  • This ledger records dated technology, deal and operating receipts. Announcements, integrations, pilots, availability, named live use and scaled use remain separate states. Company-reported activity is not independently verified volume, legal finality, token value capture or control of a third-party network.
  • The bank comparison, field guide and build-out ledger carry their own cutoffs (late September to October 3); the build-status master (October 19) is current where they differ.
  • placements.json is an index whose rows copy from their homes; its legal rows are on link E, and its countries and timeline rows belong to links H and I (not built in this wave).
  • The Major Bank Digital Transition package has no JSON registry in this workbench (README only); its comparison is read from BANK_TRANSITION_COMPARISON_2026-09-26.json.
SectionRecordSaved detailsSources and dates
Build-out ledger: 20 profiles and their transition statesRLUSD access through Coinbase
Date
2026-10-28
Date kind
Date
Publisher
Ripple / Coinbase
Date
2026-10-28
Boundary
Company-reported Prime/Exchange/app availability; Global Exchange and collateral support remain future. No inspected client transaction.
Needs primary source
No
Question pages
    Build-out ledger: 20 profiles and their transition statesSecuritize plans Stellar integration
    Date
    2026-10-28
    Date kind
    Date
    Publisher
    Securitize / SDF
    Date
    2026-10-28
    Boundary
    Planned integration subject to timing/completion risk; products and exact subsidiary roles remain to be announced.
    Needs primary source
    No
    Question pages
      Build-out ledger: 20 profiles and their transition statesArchax announces €GOVY on Stellar
      Date
      2026-10-28
      Date kind
      Date
      Publisher
      Archax / SDF
      Date
      2026-10-28
      Boundary
      Announced product launch; no funded issuance, balance, completed collateral pledge or universal regulatory treatment established.
      Needs primary source
      No
      Question pages
        Build-out ledger: 20 profiles and their transition statesPontoro reports Stellar ALP pilot
        Date
        2026-10-28
        Date kind
        Date
        Publisher
        Pontoro / SDF
        Date
        2026-10-28
        Boundary
        Reported live pilot; restricted interests, no secondary market, and redemptions may be delayed, reduced or suspended.
        Needs primary source
        No
        Question pages
          Build-out ledger: 20 profiles and their transition statesStellar Project Thruput preview
          Date
          2026-10-28
          Date kind
          Date
          Publisher
          Stellar Development Foundation
          Date
          2026-10-28
          Boundary
          FutureNet execution-engine preview within a validator; not measured end-to-end mainnet throughput or current mainnet fee change.
          Needs primary source
          No
          Question pages
            Build-out ledger: 20 profiles and their transition statesJanus Henderson / Centrifuge announce JQQQ
            Date
            2026-10-27
            Date kind
            Date
            Publisher
            Janus Henderson / Centrifuge / SDF
            Date
            2026-10-27
            Boundary
            Company-announced launch for eligible non-U.S. investors; no funded subscription, holdings reconciliation, redemption or collateral use inspected.
            Needs primary source
            No
            Question pages
              Build-out ledger: 20 profiles and their transition statesMovantis planned corridor, source-date hold
              Date
              2026-10-28
              Date kind
              Date
              Publisher
              Movantis / SDF
              Date
              2026-10-28 access; body dateline 2026-10-29
              Boundary
              Accessible October28 source datelined October29; chronology unresolved at review. U.S.–El Salvador route planned; existing network flows are not Stellar volume.
              Needs primary source
              No
              Question pages
                Build-out ledger: 20 profiles and their transition statesSelig Frontier Forum written remarks
                Date
                2026-10-28
                Date kind
                Date
                Publisher
                CFTC / Chairman Michael S. Selig
                Date
                2026-10-28
                Boundary
                Officially published Chairman personal views; not a Commission order/rule or a developer exemption. No panel recording content reviewed.
                Needs primary source
                No
                Question pages
                  Build-out ledger: 20 profiles and their transition statesDTC Tokenization Service goes live
                  Date
                  2026-10-28
                  Date kind
                  Date
                  Publisher
                  DTCC / DTC
                  Date
                  2026-10-28
                  Boundary
                  Operator-reported preliminary service launch and twenty signed access agreements; no first post-opening trade or onchain cash settlement established.
                  Needs primary source
                  No
                  Question pages
                    Build-out ledger: 20 profiles and their transition statesDTC current tokenization service page
                    Date
                    2026-10-28
                    Date kind
                    Date
                    Publisher
                    DTCC / DTC
                    Date
                    2026-10-28 checked
                    Boundary
                    Advertised 34 eligible securities, 24/7 intra-chain peer transfers and Canton/private Besu; custody-universe amounts are not tokenized issuance or volume.
                    Needs primary source
                    No
                    Question pages
                      Build-out ledger: 20 profiles and their transition statesChainlink October25 feed additions
                      Date
                      2026-10-25
                      Date kind
                      Date
                      Publisher
                      Chainlink
                      Date
                      2026-10-25
                      Boundary
                      Provider-documented zTreasury+ NAV and Data Streams availability; not issuance, a trade or cash settlement.
                      Needs primary source
                      No
                      Question pages
                        Build-out ledger: 20 profiles and their transition statesFSB final responsible-AI practices
                        Date
                        2026-10-15
                        Date kind
                        Date
                        Publisher
                        Financial Stability Board
                        Date
                        2026-10-15
                        Boundary
                        Final non-prescriptive toolkit; not binding international law, national adoption or proved firm implementation.
                        Needs primary source
                        No
                        Question pages
                          Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedcircle: what changed, September 27 to October 19
                          Badge
                          Text
                          Live named use
                          Date
                          2026-10-19
                          Date kind
                          Checked through
                          Ecosystem id
                          circle
                          Ledger refreshed through
                          2026-09-27
                          Checked through
                          2026-10-19
                          Proposed transition state
                          live named use
                          Proposed basis
                          No closing, failure or new operating metric changed the ledger's picture: Arc mainnet, USDC and CPN remain live with named participants (CPN payout partners per Circle's Feb 17, 2026 post), while Tazapay is still only a signed agreement and every new Sept 28–Oct 19 partnership is announced, not operating.
                          Open questions
                          • Tazapay: no closing, regulatory approval or completion filing found through Oct 19, 2026. Taurus Acquisition Inc. is still only the proposed purchaser of Tazapay Pte. Ltd.
                          • Which Binance legal entity signed the subscription and commercial agreements? The 8-K and release say only 'Binance'.
                          • cirBTC: Circle's own release notes show no cirBTC CCTP route. The issuer entity and custodian of cirBTC were not found.
                          • Press says EURC moves over CCTP on Avalanche and World Chain. Not confirmed in Circle's release notes.
                          • First National Digital Currency Bank, N.A. (Circle National Trust): no new operating, Federal Reserve stock or Federal Reserve account event found after the Sept 30 OCC list.
                          • Arc: no audited or Circle-reported operating or fee metrics found after the Sept 16 launch. The ARC token is still a genesis mint only, with no decision on a public launch.
                          • Footers on the new releases list Circle International Bermuda Limited. Its role is not established in the library.
                          Needs primary source
                          No
                          Question pages
                            Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedcircle · New build
                            Date
                            2026-10-08
                            Date kind
                            Date
                            Name
                            CCTP on Sui (mainnet and testnet)
                            Legal entities
                            Circle Technology Services, LLC
                            Networks
                            Sui
                            State
                            live available
                            Date
                            2026-10-08
                            Summary
                            Circle added Sui mainnet and testnet as supported CCTP blockchains (CCTP domain 8), so native USDC can burn on one chain and mint on Sui.
                            Boundary
                            A release note shows availability only; it says nothing about volume. Circle's Sept 2 post names Circle Technology Services, LLC as the CCTP provider; the release note itself names no entity.
                            Vetted
                            • Verdict: confirmed
                            • Evidence quote: [paraphrase of Oct 8 entry] Sui mainnet and testnet added as CCTP chains, domain 8
                            • Reason: Release note supports availability on Oct 8 (domain 8). Entity comes from Circle's Sept 2 blog: 'CCTP is a crosschain messaging infrastructure service provided by Circle Technology Services, LLC'.
                            Needs primary source
                            No
                            Question pages
                              Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedcircle · New build
                              Date
                              2026-09-16
                              Date kind
                              Date
                              Name
                              CCTP for non-USDC tokens (EURC and issuer-registered tokens), Arc mainnet and Starknet paths
                              Legal entities
                              Circle Technology Services, LLC
                              Networks
                              Ethereum, Base, Arc, Starknet
                              State
                              live available
                              Date
                              2026-09-16
                              Summary
                              Not in the ledger. EURC burn-and-mint started on Ethereum and Base (Sept 2). On Sept 16 Circle opened CCTP to non-USDC tokens, with a permissionless layer where issuers register their own tokens, and added Arc mainnet. A Starknet path to and from Arc followed on Sept 18.
                              Boundary
                              Press (crypto.news via Pluang, Sept 24) also lists EURC on Avalanche and World Chain and a cirBTC route between Arc and Ethereum. Circle's release notes do not show those, so they are left out here. Opening CCTP to other tokens does not make Circle the issuer of tokens other issuers register.
                              Vetted
                              • Verdict: confirmed
                              • Evidence quote: [paraphrase of Sept 16 entry] CCTP for non-USDC assets launched; permissionless token registration
                              • Reason: Release notes show non-USDC launch and Arc mainnet on Sept 16 and Starknet-Arc path on Sept 18; Avalanche, World Chain and cirBTC are absent, as the item says. Sept 2 blog: EURC burn-and-mint live 'starting with Ethereum and Base' and names Circle Technology Services, LLC.
                              Needs primary source
                              No
                              Question pages
                                Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedcircle · New build
                                Date
                                2026-09-16
                                Date kind
                                Date
                                Name
                                Circle Gateway on Arc mainnet
                                Networks
                                Arc
                                State
                                live available
                                Date
                                2026-09-16
                                Summary
                                Not in the ledger. Gateway, Circle's unified USDC balance service, added Arc mainnet as a supported blockchain on launch day.
                                Boundary
                                Availability only. The release note does not name which Circle entity provides Gateway.
                                Vetted
                                • Verdict: confirmed
                                • Evidence quote: Added Arc mainnet as a supported blockchain for Gateway.
                                • Reason: Date and availability match; no entity named, as the item says.
                                Needs primary source
                                No
                                Question pages
                                  Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedcircle · New build
                                  Date
                                  2026-09-10
                                  Date kind
                                  Date
                                  Name
                                  USDC on Noble — redemption-only wind-down
                                  Networks
                                  Noble
                                  State
                                  announced
                                  Date
                                  2026-09-10
                                  Summary
                                  On Sept 10, 2026 Circle announced a wind-down of USDC on Noble: new minting through Circle Mint to be disabled Oct 13, 2026; CCTP V1 burn limits to fall to zero from Oct 31; contracts pause and balance snapshot Jan 12, 2027; manual redemption from Jan 13, 2027.
                                  Boundary
                                  The state shown applies to redemption only. Minting has stopped and the route is being retired. The Oct 13 date comes from Circle's Sept 10 schedule; no separate after-the-fact confirmation was found.
                                  Vetted
                                  • Verdict: narrowed
                                  • Evidence quote: minting of USDC on Noble through Circle Mint will be disabled on October 13, 2026
                                  • Reason: The only source is a forward-dated schedule. It supports an announced wind-down, not that minting was in fact disabled on Oct 13 or that redemptions are live. Item already concedes no after-the-fact confirmation.
                                  Needs primary source
                                  No
                                  Question pages
                                    Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedcircle · New deal
                                    Date
                                    2026-09-17
                                    Date kind
                                    Date
                                    Counterparty
                                    Binance
                                    Legal entities
                                    • Circle Internet Group, Inc.
                                    • Binance (contracting entity not named in the 8-K or release)
                                    State
                                    announced
                                    Date
                                    2026-09-17
                                    Summary
                                    Not in the ledger. Circle sold Binance 1,237,011 Class A shares at $80.84 each, for $100 million in a private placement that closed when signed. The parties also signed a new five-year commercial agreement: Binance promotes USDC held through Circle's Modular Smart Contract Wallet infrastructure, and Circle pays Binance a monthly incentive fee set as a percentage of the USDC held. It replaces the Nov 2024 and Aug 2025 arrangements.
                                    Boundary
                                    The share sale is complete. The new commercial agreement is signed but has no operating or volume receipt yet. The fee is a distribution cost to Circle and gives USDC holders no rights.
                                    Vetted
                                    • Verdict: confirmed
                                    • Evidence quote: a monthly incentive fee representing a percentage of the amount of USDC held
                                    • Reason: 8-K: Subscription Agreement entered Sept 17, 2026, 1,237,011 shares at $80.84, closing concurrent with signing; five-year term; supersedes Nov 2024 and Aug 2025 agreements; Binance entity not named. Report dated Sept 17, signed Sept 22.
                                    Needs primary source
                                    No
                                    Question pages
                                      Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedcircle · New deal
                                      Date
                                      2026-09-28
                                      Date kind
                                      Date
                                      Counterparty
                                      Volante Technologies
                                      Legal entities
                                      • Circle Internet Group, Inc.
                                      • Volante Technologies (legal suffix not given)
                                      State
                                      announced
                                      Date
                                      2026-09-28
                                      Summary
                                      Strategic collaboration to put USDC workflows (mint, redeem, wallet registration, funding, wallet-to-wallet payment) into Volante's payments platform for banks to evaluate.
                                      Boundary
                                      Clients 'can soon test'. No live client, network or volume is named.
                                      Vetted
                                      • Verdict: confirmed
                                      • Evidence quote: Volante clients can soon test USDC workflows within our AI-powered Payments Platform
                                      • Reason: Workflows listed also include notifications. No live client, network or volume; Volante suffix not given.
                                      Needs primary source
                                      No
                                      Question pages
                                        Dated component updates: 20 ecosystems, 120 vetted items, 26 rejectedcircle · New deal
                                        Date
                                        2026-10-07
                                        Date kind
                                        Date
                                        Counterparty
                                        Tereina (SAP-backed)
                                        Legal entities
                                        Circle Internet Group, Inc., Tereina (legal entity not given)
                                        State
                                        announced
                                        Date
                                        2026-10-07
                                        Summary
                                        Partnership to bring USDC and EURC payments into Tereina's infrastructure, starting with SAP Cloud ERP through SAP Pay.
                                        Boundary
                                        The release says the integration 'is available' to SAP customers but also that proof-of-value programs will run 'in the coming months'. No named customer or network, so it is treated as announced.
                                        Vetted
                                        • Verdict: confirmed
                                        • Evidence quote: Over the coming months, Tereina and Circle plan to conduct joint proof-of-value programs
                                        • Reason: Release also says integration 'is available to SAP customers via SAP Pay'; no named customer or network, so 'announced' holds. Release writes 'Circle Internet Group (Circle)' without ', Inc.'.
                                        Needs primary source
                                        No
                                        Question pages