Skip to content

The operators: which companies and networks run it, and how far along is each? — saved evidence, page 58

Saved evidence through 2026-10-26. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 1026–1042 of 3717. Page 58 of 194.

Section context and qualifications
Uncertainty
  • Primary sources only (Katie, 2026-10-19): official records and the actor's own documents. News, newsletters, blogs and law-firm summaries were removed on 2026-10-19; what rested on them is held in masters/_held/needs_primary_source_2026-10-19.json.
  • July deck sources carry no dates in the library; their 'date' is null unless re-verified on the web. Web sources checked on 2026-10-19 carry their publication date.
  • Technical finality, authoritative legal record and cash or redemption remedy are separate endpoints. Proposal, staff position, registration, ownership, partnership, software capability, pilot and production are different facts and clocks.
  • This is a capability-and-receipt map, not a league table, safety rating or investment view. A group can lead one surface and depend on another institution for the claim, authoritative record, cash, custody, collateral rulebook or remedy.
  • This is a functional and control comparison, not a ranking of safety, adoption, token value or investment merit. A live partner connection is not group ownership, and an approved or conditional charter is not automatically an operating service.
  • A place on this map records a bounded capability or comparison. It does not establish SEC selection, TSV qualification, a production integration, legal equivalence between models or an investment view.
  • This ledger records dated technology, deal and operating receipts. Announcements, integrations, pilots, availability, named live use and scaled use remain separate states. Company-reported activity is not independently verified volume, legal finality, token value capture or control of a third-party network.
  • The bank comparison, field guide and build-out ledger carry their own cutoffs (late September to October 3); the build-status master (October 19) is current where they differ.
  • placements.json is an index whose rows copy from their homes; its legal rows are on link E, and its countries and timeline rows belong to links H and I (not built in this wave).
  • The Major Bank Digital Transition package has no JSON registry in this workbench (README only); its comparison is read from BANK_TRANSITION_COMPARISON_2026-09-26.json.
SectionRecordSaved detailsSources and dates
Field guide: what each technology is and what it does not controlWormhole
Badge
Text
Contextual
Date
2026-10-03
Date kind
Home checked through
Category
Connector & middleware
Ecosystem id
wormhole
What it is
A cross-chain messaging and interoperability layer connecting supported networks and asset representations.
Why following
Multi-chain finance needs transport between otherwise separate ledgers, and Wormhole appears across several tracked issuer and network relationships.
Differentiator status
contextual
Differentiator
Broad cross-chain connectivity and named integrations make it an important transport layer in this map.
Differentiator boundary
Connectivity is not a unique legal or monetary advantage. Wormhole does not supply the issuer promise, legal register, reserve, bank cash or ultimate remedy.
How it works
  • A supported source-chain event creates a message or transfer instruction.
  • Wormhole's verification design carries that information across environments.
  • A destination-chain representation or action is created under integration rules.
  • Issuer, transfer agent, custodian and cash rail remain external authorities.
Controls
Its messaging and verification layer, Supported integration mechanics
Does not control
Source or destination chain governance, Asset issuance and redemption, Legal title and cash settlement
Attachments
markets, records, cash
Observed state
Live interoperability technology with integration-by-integration operating evidence.
Watch for
  • Recovery when ledgers disagree
  • Authoritative supply and burn/mint controls
  • Whether a route is live, announced or only supported in principle
Do not confuse
Transport ≠ issuer authority, Cross-chain representation ≠ legal title, Message completion ≠ cash discharge
Needs primary source
No
Question pages
    Field guide: what each technology is and what it does not controlQuant
    Badge
    Text
    Contextual
    Date
    2026-10-03
    Date kind
    Home checked through
    Category
    Connector & middleware
    Ecosystem id
    quant
    What it is
    A proprietary interoperability and orchestration software stack with live products, bounded UK customer transactions, planned U.S. network work and financial-system integrations.
    Why following
    It targets the connective tissue between existing ledgers and tokenized workflows, especially where banks want orchestration without replacing their own deposit books.
    Differentiator status
    contextual
    Differentiator
    A proprietary, institution-facing orchestration approach spanning Overledger, Flow and Fusion rather than one public base ledger.
    Differentiator boundary
    The product combination is distinct, but three UK customer cases and one U.S. supplier selection do not establish general production, unique scale, disclosed revenue or QNT value capture.
    How it works
    • Quant supplies proprietary software services.
    • The software coordinates instructions across connected systems.
    • Banks or institutions retain their own authoritative liabilities and records.
    • External settlement and legal remedy remain with the connected institutions.
    Controls
    • Its proprietary product stack
    • Orchestration logic within contracted deployments
    Does not control
    • Participant bank deposits
    • Connected ledgers
    • A pooled Quant money claim or universal settlement layer
    Attachments
    banks, records, cash
    Observed state
    Live products, three reported UK customer cases and a planned The Clearing House network expected for participating institutions in H1 2027.
    Watch for
    • Named U.S. participants and operating rules
    • General GBTD service and recurring volume
    • Where final settlement and correction occur
    • Whether QNT is operationally required in either institutional route
    Do not confuse
    • Quant company ≠ connected banks
    • QNT ≠ bank money
    • Live customer cases ≠ general production
    • Supplier selection ≠ operating U.S. network
    • Software adoption ≠ QNT value capture
    Needs primary source
    No
    Question pages
      Field guide: what each technology is and what it does not controlSWIFT ledger & bank obligations
      Badge
      Text
      Meaningful
      Date
      2026-10-03
      Date kind
      Home checked through
      Category
      Market infrastructure
      Ecosystem id
      swift-ledger
      What it is
      A bank-coordination design in which Swift operates shared commitment infrastructure while participant banks retain the underlying money obligations.
      Why following
      It demonstrates that shared-ledger coordination can grow without a public coin and without stripping banks of their deposit liabilities or external settlement responsibilities.
      Differentiator status
      meaningful
      Differentiator
      A trusted cooperative messaging network is extending into shared commitment coordination on EVM-compatible technology while preserving bank-issued money and existing settlement systems.
      Differentiator boundary
      Pilot completion does not establish general availability, public-coin use, exact funding treatment, finality timing or stressed loss allocation.
      How it works
      • Participating banks establish customer and interbank obligations.
      • Swift coordinates confirmed commitments on the shared ledger.
      • Some obligations can be matched or netted in the workflow.
      • Banks and existing systems complete correspondent or settlement cash outside the shared ledger where required.
      Controls
      • Shared coordination infrastructure
      • Participant rules and messaging workflow through the cooperative framework
      Does not control
      • Participant deposit liabilities
      • Every bank's customer books
      • External cash settlement merely by recording a commitment
      Attachments
      banks, markets, records, cash
      Observed state
      Controlled live pilots with named participants and completed pairings; general production and stress evidence remain open.
      Watch for
      • Executed participant terms
      • Funding reservation and liquidity mechanics
      • External settlement timing
      • Production scale and failure allocation
      Do not confuse
      • Swift cooperative ≠ participant banks
      • Shared ledger commitment ≠ bank money
      • Matched obligation ≠ final cash settlement
      Needs primary source
      No
      Question pages
      Build-out ledger: 20 profiles and their transition statesResearch
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Design, study or standards work without an announced deployment.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesRoadmap
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Planned capability or target date without current availability.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesAnnounced
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Named agreement, selection or launch announcement without an operating receipt.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesTestnet
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Capability running in a development or test environment.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesPilot
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Bounded participant or transaction trial, not general production.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesLive / available
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Product or protocol is generally available; usage scale is not established.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesLive named use
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      A named user or transaction has an operating receipt.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesScaled use
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Recurring use at disclosed, decision-useful scale.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesStress / recovery
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Observed behavior under disruption or recovery.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesHistorical
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      Past event retained for architecture or lineage.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesNot established
      Date
      2026-10-28
      Date kind
      Home checked through
      Description
      The claimed state is not supported by the current evidence.
      Needs primary source
      No
      Question pages
      For this row’s sourcing, see the saved details, section context and linked research.
      Build-out ledger: 20 profiles and their transition statesripple
      Badge
      Text
      Live named use
      Date
      2026-10-28
      Date kind
      Refreshed through
      Transition state
      Live named use
      Ecosystem id
      ripple
      Refreshed through
      2026-10-28
      Headline
      RLUSD reaches Coinbase; BNY custody and Robinhood/C2FO connections keep current and future services separate.
      Strongest receipt
      CSD BR remains the strongest operating receipt: real BTG Pactual fund-share records, Ripple Custody and XRPL MPTs in a live-environment first phase while CSD BR retains the official registration, deposit and settlement record. XRP Asia is a separate organizational receipt upstream of products and transactions.
      Current builds
      • Name: Ripple Treasury 24/7 Returns · State: live available · Date: 2026-10-26 · Summary: New offering for eligible wallet-held assets including RLUSD alongside GSmart workflows. · Boundary: Product availability claim; program terms, returns payer, customer balances and completed withdrawals are not disclosed.
      • Name: XRP Asia regional builder and integrator hub · State: live available · Date: 2026-10-03 · Summary: XRP Asia Ltd launched a Singapore-based public hub and intake with visible Singapore, Tokyo and Seoul community nodes and support paths for developers, systems integrators, startups, partners and ambassadors. · Boundary: Programs and dates remain forthcoming. Ownership, budget, awards and deployments are undisclosed, and the hub is not a financial licence, token issuer, validator authority or payment rail.
      • Name: CSD BR XRPL fund-share record mirror · State: live named use · Date: 2026-09-29 · Summary: Selected BTG Pactual fund-share records deposited at CSD BR are to be mirrored as permissioned XRPL MPTs for query, audit and near-real-time consistency checks. · Boundary: CSD BR's conventional systems remain authoritative. Company-reported live use is not yet independently reproducible because no issuer account, MPT issuance ID, transaction hash, named fund/class, amount or reconciliation result was published.
      • Name: Ripple Mint · State: live available · Date: 2026-07-23 · Summary: UI and APIs for eligible customers to mint, redeem, bridge and monitor RLUSD. · Boundary: Availability is not usage scale and does not make XRP the settlement asset.
      • Name: XRPL Lending Protocol · State: testnet · Date: 2026-06-29 · Summary: Native fixed-term credit primitives under XLS-65 and XLS-66. · Boundary: Devnet work is subject to validator approval; credit underwriting stays offchain.
      Deals and integrations
      • Counterparty: XRP Asia, XRP Ledger Foundation and XRPL Commons · Date: 2026-10-03 · State: live available · Summary: A regional builder organization now sits beside separate global protocol and community-support bodies, with Ripple ecosystem personnel supporting the launch. · Boundary: Coordination does not establish common ownership, shared financial liability, validator control, bank adoption or use of RLUSD or XRP.
      • Counterparty: CSD BR and BTG Pactual · Date: 2026-09-29 · State: live named use · Summary: First-phase partnership joins Ripple Custody and XRPL MPTs to CSD BR's regulated fund-share record workflow. · Boundary: This is record mirroring, not XRPL legal-title authority or cash settlement; it does not disclose RLUSD use, XRP bridge liquidity or movement of CSD BR's aggregate R$22 trillion registered-asset base onto XRPL.
      • Counterparty: Hidden Road / Ripple Prime · Date: 2026 · State: live named use · Summary: Acquired prime-brokerage capability broadens Ripple's institutional stack. · Boundary: Corporate ownership does not prove XRPL or XRP is used in every prime transaction.
      • Counterparty: Aviva Investors, BNY, Komainu and Licuido · Date: 2026-10-26 · State: live named use · Summary: Second XRPL fund share class launches with a £50m Aviva investment; over £86m spans both tokenized offerings. · Boundary: £22bn is the entire sterling fund; digital-twin structure preserves offchain fund and underlying-asset custody; no required XRP investment.
      Native token
      • Symbol: XRP
      • Role: XRPL fees, reserves and optional bridge liquidity
      • Required channel: Required for XRPL protocol fees and account/object reserves; not universally required by Ripple enterprise products or RLUSD flows.
      • Value capture: Network activity can consume small XRP fees and require reserves, but institutional deal announcements do not establish material XRP demand.
      Transition assessment
      • What changed: Company-reported final OCC bank approval, new Treasury returns offering and issuer-reported second funded XRPL fund share class.
      • Live now: Company-reported CSD BR record mirroring, Ripple payments, custody and prime services, eligible-customer RLUSD minting, and XRP Asia organizational intake.
      • Still building: XRP Asia programs, awards, integrator contracts and country-lawful deployments; public operating receipts for the CSD BR mirror; native lending; and any later native issuance or trading phase. Final OCC instrument, bank opening and reserve cutover still require their own evidence.
      • Not proved: That XRP Asia is a payment rail or Ripple subsidiary, that its communities create bank adoption, that XRPL is the Brazilian legal record or cash-settlement rail, or that Ripple and XRPL growth require material XRP inventory.
      Return gates
      • XRP Asia ownership, governance, funding, dated programs, named recipients and mainnet deployment receipts
      • Country-specific systems-integrator contracts and exact licensed legal persons
      • CSD BR issuer account, MPT issuance ID, exact fund/class, transaction hashes, mirrored value and reconciliation results
      • Validator approval and mainnet activation of XLS-65/66
      • Auditable disclosure connecting institutional volume to XRP use
      • 24/7 Returns agreements and actual placements/withdrawals
      • Aviva class-specific balances and investor activity
      • Final OCC instrument and bank opening
      Refresh scope
      Selected October27–28 component return; prior strongest receipt and broad transition grade retained.
      Current development refs
      • Placement: current builds · Scope: RLUSD reaches Coinbase
      • Placement: current builds · Scope: C2FO Instant Pay
      • Placement: deals and integrations · Scope: Robinhood — current RLUSD and Prime services
      • Placement: deals and integrations · Scope: Robinhood — future app, XRPL, Treasury and futures links
      • Placement: deals and integrations · Scope: BNY — XRP/RLUSD custody
      • Placement: deals and integrations · Scope: BNY — intended XRPL and mint/redemption links
      Needs primary source
      No
      Question pages
        Build-out ledger: 20 profiles and their transition statessecuritize
        Badge
        Text
        Scaled use
        Date
        2026-09-27
        Date kind
        Refreshed through
        Transition state
        Scaled use
        Ecosystem id
        securitize
        Refreshed through
        2026-09-27
        Headline
        Securitize remains the clearest regulated issuance, transfer-agent, broker-dealer and fund-services stack in the cohort.
        Strongest receipt
        Regulatory filings, BUIDL agreements and 2026 results identify the operating entities, contracts and material tokenized-fund activity.
        Current builds
        Name: Multi-chain tokenized fund platform · State: scaled use · Date: 2026-09-17 · Summary: Regulated issuance, transfer, servicing and distribution for named funds across supported networks. · Boundary: Securitize does not become the issuer, custodian or underlying-asset owner merely by operating the stack.
        Deals and integrations
        Counterparty: BlackRock / BUIDL · Date: 2026 · State: scaled use · Summary: Named transfer-agent and platform relationship across multiple chains. · Boundary: BlackRock and the fund's legal documents retain asset and governance authority.
        Native token
        • Symbol: none
        • Role: No required Securitize platform token
        • Required channel: Fees and contractual economics are company/service-layer arrangements.
        • Value capture: Value accrues to operating entities and shareholders through platform activity, not to a mandatory public token.
        Transition assessment
        • What changed: The operating and issuer record is better evidenced, not merely announced.
        • Live now: Issuance, transfer-agent, broker-dealer and fund-services activity.
        • Still building: Broader asset classes, jurisdictions and interoperability.
        • Not proved: That every tokenized-fund holder has direct rights to underlying assets outside controlling documents.
        Return gates
        • New filed issuer or fund documents
        • Named secondary-market liquidity receipts
        • Material entity or control change
        Needs primary source
        No
        Question pages
          Build-out ledger: 20 profiles and their transition statesethereum
          Badge
          Text
          Live available
          Date
          2026-10-26
          Date kind
          Refreshed through
          Transition state
          Live / available
          Ecosystem id
          ethereum
          Refreshed through
          2026-10-26
          Headline
          Ethereum remains live; Glamsterdam is active on Sepolia, but Hoodi was postponed and mainnet remains unscheduled.
          Strongest receipt
          October 22 postponement supersedes the October 26 Hoodi schedule, including the 200M gas-limit increase.
          Current builds
          Name: Glamsterdam / Hegotá roadmap · State: roadmap · Date: 2026-10-22 · Summary: Sepolia activated October 6; Hoodi postponed with no replacement; mainnet TBD. · Boundary: Neither old scheduled date nor client availability proves activation.
          Deals and integrations
          Counterparty: Institutional issuers and tokenization platforms · Date: 2026-09-27 · State: live named use · Summary: Named funds and stablecoins continue to use Ethereum as a host network. · Boundary: The network does not own or guarantee issuer liabilities.
          Native token
          • Symbol: ETH
          • Role: Gas, staking collateral and protocol security
          • Required channel: Required for native execution fees and validator staking, though applications can abstract the user payment experience.
          • Value capture: Fees are burned and validators receive issuance/priority fees; application growth does not map one-for-one to holder returns.
          Transition assessment
          • What changed: The next-upgrade sequence and priorities are clearer.
          • Live now: Proof-of-stake execution and a large application/rollup ecosystem.
          • Still building: Hoodi rescheduling, Glamsterdam mainnet and Hegotá scope.
          • Not proved: That roadmap items are live or that hosted asset activity transfers asset authority to Ethereum.
          Return gates
          • Glamsterdam mainnet activation
          • Hegotá finalized scope
          • Measured fee, blob and finality behavior after upgrade
          Previous assessment 2026 09 27
          • Headline: Ethereum remains the broadest programmable settlement substrate in the set; its current transition is protocol scaling and user-experience hardening, not a new institutional controller.
          • Strongest receipt: The current network is live while Glamsterdam approaches mainnet and Hegotá remains in scoping.
          • Transition state: live available
          • Transition assessment: What changed: The next-upgrade sequence and priorities are clearer.; Live now: Proof-of-stake execution and a large application/rollup ecosystem.; Still building: Hoodi rescheduling, Glamsterdam mainnet and Hegotá scope.; Not proved: That roadmap items are live or that hosted asset activity transfers asset authority to Ethereum.
          Needs primary source
          No
          Question pages