Skip to content

The operators: which companies and networks run it, and how far along is each? — saved evidence, page 49

Saved evidence through 2026-10-26. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 859–878 of 3717. Page 49 of 194.

Section context and qualifications
Uncertainty
  • Primary sources only (Katie, 2026-10-19): official records and the actor's own documents. News, newsletters, blogs and law-firm summaries were removed on 2026-10-19; what rested on them is held in masters/_held/needs_primary_source_2026-10-19.json.
  • July deck sources carry no dates in the library; their 'date' is null unless re-verified on the web. Web sources checked on 2026-10-19 carry their publication date.
  • Technical finality, authoritative legal record and cash or redemption remedy are separate endpoints. Proposal, staff position, registration, ownership, partnership, software capability, pilot and production are different facts and clocks.
  • This is a capability-and-receipt map, not a league table, safety rating or investment view. A group can lead one surface and depend on another institution for the claim, authoritative record, cash, custody, collateral rulebook or remedy.
  • This is a functional and control comparison, not a ranking of safety, adoption, token value or investment merit. A live partner connection is not group ownership, and an approved or conditional charter is not automatically an operating service.
  • A place on this map records a bounded capability or comparison. It does not establish SEC selection, TSV qualification, a production integration, legal equivalence between models or an investment view.
  • This ledger records dated technology, deal and operating receipts. Announcements, integrations, pilots, availability, named live use and scaled use remain separate states. Company-reported activity is not independently verified volume, legal finality, token value capture or control of a third-party network.
  • The bank comparison, field guide and build-out ledger carry their own cutoffs (late September to October 3); the build-status master (October 19) is current where they differ.
  • placements.json is an index whose rows copy from their homes; its legal rows are on link E, and its countries and timeline rows belong to links H and I (not built in this wave).
  • The Major Bank Digital Transition package has no JSON registry in this workbench (README only); its comparison is read from BANK_TRANSITION_COMPARISON_2026-09-26.json.
SectionRecordSaved detailsSources and dates
All 383 connectionsmTBILL → USDC on Algorand: atomic cash leg
Badge
Text
Live production
Date
2026-09-01
Date kind
Date
From
mTBILL
To
USDC on Algorand
From
mtbill
To
usdc-algorand
Type
asset flow
Status
live example
Date
2026-09-01
Claim
Documented atomic exchange uses native USDC.
Boundary
Circle and Midas remedies remain separate.
Operational state
live production
Needs primary source
No
Question pages
    All 383 connectionsUSDC on Algorand → Algorand network: native USDC deployment
    Badge
    Text
    Live production
    Date
    2026-09-02
    Date kind
    Date
    From
    USDC on Algorand
    To
    Algorand network
    From
    usdc-algorand
    To
    algorand-network
    Type
    asset flow
    Status
    live
    Date
    2026-09-02
    Claim
    Circle Mint identifies Algorand as a supported live USDC chain.
    Boundary
    Algorand records token state and transport; Circle retains issuance, reserve, redemption and administrative authority, and network availability does not prove transaction volume or FX use.
    Operational state
    live production
    Needs primary source
    No
    Question pages
      All 383 connectionsXDC Foundation → XDC network: supports ecosystem
      Badge
      Text
      Current operating
      Date
      2026-09-01
      Date kind
      Date
      From
      XDC Foundation
      To
      XDC network
      From
      xdc-foundation
      To
      xdc-network
      Type
      operating
      Status
      current
      Date
      2026-09-01
      Claim
      Foundation supports the network.
      Boundary
      No ownership of every node.
      Operational state
      current operating
      Needs primary source
      No
      Question pages
        All 383 connectionsXDC masternodes → XDC network: secures XDPoS
        Badge
        Text
        Live production
        Date
        2026-09-01
        Date kind
        Date
        From
        XDC masternodes
        To
        XDC network
        From
        xdc-masternodes
        To
        xdc-network
        Type
        technical
        Status
        live
        Date
        2026-09-01
        Claim
        KYC masternodes secure XDC.
        Boundary
        No asset-issuer role.
        Operational state
        live production
        Needs primary source
        No
        Question pages
          All 383 connectionsXDC → XDC network: gas and stake
          Badge
          Text
          Live production
          Date
          2026-09-01
          Date kind
          Date
          From
          XDC
          To
          XDC network
          From
          xdc-token
          To
          xdc-network
          Type
          asset flow
          Status
          live
          Date
          2026-09-01
          Claim
          XDC pays gas and secures validators.
          Boundary
          Not trade credit.
          Operational state
          live production
          Needs primary source
          No
          Question pages
            All 383 connectionsContour → Electronic trade record: coordinates document workflow
            Badge
            Text
            Live production
            Date
            2026-09-01
            Date kind
            Date
            From
            Contour
            To
            Electronic trade record
            From
            contour
            To
            xdc-trade-record
            Type
            operating
            Status
            live
            Date
            2026-09-01
            Claim
            Contour coordinates trade records.
            Boundary
            Legal issuer remains outside the chain.
            Operational state
            live production
            Needs primary source
            No
            Question pages
              All 383 connectionsContour → Contour Stable-Coin Lab: operates settlement pilot
              Badge
              Text
              Pilot test
              Date
              2026-09-01
              Date kind
              Date
              From
              Contour
              To
              Contour Stable-Coin Lab
              From
              contour
              To
              contour-lab
              Type
              operating
              Status
              pilot
              Date
              2026-09-01
              Claim
              Contour operates the stablecoin lab.
              Boundary
              Not general production.
              Operational state
              pilot test
              Needs primary source
              No
              Question pages
                All 383 connectionsContour Stable-Coin Lab → USDC on XDC: tests stablecoin settlement
                Badge
                Text
                Pilot test
                Date
                2026-09-01
                Date kind
                Date
                From
                Contour Stable-Coin Lab
                To
                USDC on XDC
                From
                contour-lab
                To
                usdc-xdc
                Type
                asset flow
                Status
                pilot
                Date
                2026-09-01
                Claim
                Pilot tests native USDC cash settlement.
                Boundary
                Does not prove repeated bank LC settlement.
                Operational state
                pilot test
                Needs primary source
                No
                Question pages
                  All 383 connectionsUSDC on XDC → XDC network: native issuance
                  Badge
                  Text
                  Live production
                  Date
                  2026-09-01
                  Date kind
                  Date
                  From
                  USDC on XDC
                  To
                  XDC network
                  From
                  usdc-xdc
                  To
                  xdc-network
                  Type
                  technical
                  Status
                  live
                  Date
                  2026-09-01
                  Claim
                  USDC is native on XDC.
                  Boundary
                  XDC is not issuer.
                  Operational state
                  live production
                  Needs primary source
                  No
                  Question pages
                    All 383 connectionsIOTA Foundation → IOTA network: supports protocol
                    Badge
                    Text
                    Current operating
                    Date
                    2026-09-01
                    Date kind
                    Date
                    From
                    IOTA Foundation
                    To
                    IOTA network
                    From
                    iota-foundation
                    To
                    iota-network
                    Type
                    operating
                    Status
                    current
                    Date
                    2026-09-01
                    Claim
                    Foundation supports IOTA.
                    Boundary
                    Does not own validators or assets.
                    Operational state
                    current operating
                    Needs primary source
                    No
                    Question pages
                      All 383 connectionsIOTA Foundation → TWIN Foundation: co-founded TWIN
                      Badge
                      Text
                      Current operating
                      Date
                      2026-09-01
                      Date kind
                      Date
                      From
                      IOTA Foundation
                      To
                      TWIN Foundation
                      From
                      iota-foundation
                      To
                      twin-foundation
                      Type
                      partnership
                      Status
                      current
                      Date
                      2026-09-01
                      Claim
                      IOTA Foundation helped establish TWIN.
                      Boundary
                      TWIN is a separate multistakeholder steward.
                      Operational state
                      current operating
                      Needs primary source
                      No
                      Question pages
                        All 383 connectionsIOTA validators → IOTA network: secures network
                        Badge
                        Text
                        Live production
                        Date
                        2026-09-01
                        Date kind
                        Date
                        From
                        IOTA validators
                        To
                        IOTA network
                        From
                        iota-validators
                        To
                        iota-network
                        Type
                        technical
                        Status
                        live
                        Date
                        2026-09-01
                        Claim
                        Validators secure IOTA.
                        Boundary
                        No customs authority follows.
                        Operational state
                        live production
                        Needs primary source
                        No
                        Question pages
                          All 383 connectionsStarfish consensus → IOTA network: consensus finality
                          Badge
                          Text
                          Live production
                          Date
                          2026-09-01
                          Date kind
                          Date
                          From
                          Starfish consensus
                          To
                          IOTA network
                          From
                          starfish
                          To
                          iota-network
                          Type
                          technical
                          Status
                          live
                          Date
                          2026-09-01
                          Claim
                          Starfish finalizes IOTA state.
                          Boundary
                          Not legal document finality.
                          Operational state
                          live production
                          Needs primary source
                          No
                          Question pages
                            All 383 connectionsIOTA token → IOTA network: fees, storage and staking
                            Badge
                            Text
                            Live production
                            Date
                            2026-09-01
                            Date kind
                            Date
                            From
                            IOTA token
                            To
                            IOTA network
                            From
                            iota-token
                            To
                            iota-network
                            Type
                            asset flow
                            Status
                            live
                            Date
                            2026-09-01
                            Claim
                            IOTA supplies network economics.
                            Boundary
                            Not a trade-document claim.
                            Operational state
                            live production
                            Needs primary source
                            No
                            Question pages
                              All 383 connectionsTWIN Foundation → TLIP: stewards trade infrastructure
                              Badge
                              Text
                              Limited production
                              Date
                              2026-09-01
                              Date kind
                              Date
                              From
                              TWIN Foundation
                              To
                              TLIP
                              From
                              twin-foundation
                              To
                              tlip
                              Type
                              operating
                              Status
                              limited production
                              Date
                              2026-09-01
                              Claim
                              TWIN stewards TLIP.
                              Boundary
                              Source authorities retain records.
                              Operational state
                              limited production
                              Needs primary source
                              No
                              Question pages
                                All 383 connectionsKenTrade + Kenya Revenue Authority → TLIP: connected authority nodes
                                Badge
                                Text
                                Limited production
                                Date
                                2026-09-01
                                Date kind
                                Date
                                From
                                KenTrade + Kenya Revenue Authority
                                To
                                TLIP
                                From
                                kentrade-kra
                                To
                                tlip
                                Type
                                technical
                                Status
                                limited production
                                Date
                                2026-09-01
                                Claim
                                Named Kenyan authority connectivity exists.
                                Boundary
                                Not proof of continental scale.
                                Operational state
                                limited production
                                Needs primary source
                                No
                                Question pages
                                  All 383 connectionsADAPT → TLIP: built on trade stack
                                  Badge
                                  Text
                                  Pilot test
                                  Date
                                  2026-09-01
                                  Date kind
                                  Date
                                  From
                                  ADAPT
                                  To
                                  TLIP
                                  From
                                  adapt
                                  To
                                  tlip
                                  Type
                                  technical
                                  Status
                                  pilot
                                  Date
                                  2026-09-01
                                  Claim
                                  ADAPT implementations use the TWIN/TLIP stack.
                                  Boundary
                                  Country rollouts remain bounded.
                                  Operational state
                                  pilot test
                                  Needs primary source
                                  No
                                  Question pages
                                    All 383 connectionsADAPT → ADAPT payment layer: tests payment interoperability
                                    Badge
                                    Text
                                    Planned
                                    Date
                                    2026-09-01
                                    Date kind
                                    Date
                                    From
                                    ADAPT
                                    To
                                    ADAPT payment layer
                                    From
                                    adapt
                                    To
                                    adapt-payment
                                    Type
                                    asset flow
                                    Status
                                    planned
                                    Date
                                    2026-09-01
                                    Claim
                                    Program includes cash-layer work.
                                    Boundary
                                    No common live settlement asset.
                                    Operational state
                                    planned
                                    Needs primary source
                                    No
                                    Question pages
                                    All 383 connectionsQuant Network Limited → Overledger: owns and provides
                                    Badge
                                    Text
                                    Live production
                                    Date
                                    2026-09-01
                                    Date kind
                                    Date
                                    From
                                    Quant Network Limited
                                    To
                                    Overledger
                                    From
                                    quant-network-limited
                                    To
                                    overledger
                                    Type
                                    operating
                                    Status
                                    live
                                    Date
                                    2026-09-01
                                    Claim
                                    Quant provides Overledger.
                                    Boundary
                                    Software is not issuer authority.
                                    Operational state
                                    live production
                                    Needs primary source
                                    No
                                    Question pages
                                      All 383 connectionsQuant Network Limited → Quant Flow: provides programmable money product
                                      Badge
                                      Text
                                      Current operating
                                      Date
                                      2026-09-01
                                      Date kind
                                      Date
                                      From
                                      Quant Network Limited
                                      To
                                      Quant Flow
                                      From
                                      quant-network-limited
                                      To
                                      quant-flow
                                      Type
                                      operating
                                      Status
                                      current
                                      Date
                                      2026-09-01
                                      Claim
                                      Quant provides Flow.
                                      Boundary
                                      Does not hold participant funds.
                                      Operational state
                                      current operating
                                      Needs primary source
                                      No
                                      Question pages