Skip to content

The operators: which companies and networks run it, and how far along is each? — saved evidence, page 29

Saved evidence through 2026-10-26. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 459–478 of 3717. Page 29 of 194.

Section context and qualifications
Uncertainty
  • Primary sources only (Katie, 2026-10-19): official records and the actor's own documents. News, newsletters, blogs and law-firm summaries were removed on 2026-10-19; what rested on them is held in masters/_held/needs_primary_source_2026-10-19.json.
  • July deck sources carry no dates in the library; their 'date' is null unless re-verified on the web. Web sources checked on 2026-10-19 carry their publication date.
  • Technical finality, authoritative legal record and cash or redemption remedy are separate endpoints. Proposal, staff position, registration, ownership, partnership, software capability, pilot and production are different facts and clocks.
  • This is a capability-and-receipt map, not a league table, safety rating or investment view. A group can lead one surface and depend on another institution for the claim, authoritative record, cash, custody, collateral rulebook or remedy.
  • This is a functional and control comparison, not a ranking of safety, adoption, token value or investment merit. A live partner connection is not group ownership, and an approved or conditional charter is not automatically an operating service.
  • A place on this map records a bounded capability or comparison. It does not establish SEC selection, TSV qualification, a production integration, legal equivalence between models or an investment view.
  • This ledger records dated technology, deal and operating receipts. Announcements, integrations, pilots, availability, named live use and scaled use remain separate states. Company-reported activity is not independently verified volume, legal finality, token value capture or control of a third-party network.
  • The bank comparison, field guide and build-out ledger carry their own cutoffs (late September to October 3); the build-status master (October 19) is current where they differ.
  • placements.json is an index whose rows copy from their homes; its legal rows are on link E, and its countries and timeline rows belong to links H and I (not built in this wave).
  • The Major Bank Digital Transition package has no JSON registry in this workbench (README only); its comparison is read from BANK_TRANSITION_COMPARISON_2026-09-26.json.
SectionRecordSaved detailsSources and dates
Cash legs & tokenized bank money: its nodesLead Bank
Badge
Text
Current operating
Date
2026-10-03
Date kind
Crypto Hub checked through
Lane
regulated
Kind
named ousd reserve institution
Status
named reserve institution
Summary
Bank named with BlackRock and BNY as part of the OUSD reserve institutional stack.
Boundary
The public launch materials do not itemize Lead Bank's exact account title, custody, deposit, payment, priority or insolvency role.
Operational state
current operating
Needs primary source
No
Question pages
    Cash legs & tokenized bank money: its nodesBNP Paribas
    Badge
    Text
    Pilot test
    Date
    2026-10-03
    Date kind
    Crypto Hub checked through
    Lane
    regulated
    Kind
    bank participant
    Status
    completed controlled transaction located
    Summary
    Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
    Boundary
    Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
    Operational state
    pilot test
    Needs primary source
    No
    Question pages
      Cash legs & tokenized bank money: its nodesBNP / Intesa / SG-FORGE bond trial
      Badge
      Text
      Pilot test
      Date
      2026-10-03
      Date kind
      Crypto Hub checked through
      Lane
      networks
      Kind
      adjacent bank project
      Status
      pilot test
      Summary
      Completed tokenized-bond DvP, interest and redemption trial with fiat/EURCV; separate from Siemens bank deposits.
      Boundary
      Separate project; common bank participation does not establish interoperability with SWIFT.
      Operational state
      pilot test
      Needs primary source
      No
      Question pages
      Cash legs & tokenized bank money: its nodesCiti
      Badge
      Text
      Pilot test
      Date
      2026-10-03
      Date kind
      Crypto Hub checked through
      Lane
      regulated
      Kind
      bank participant
      Status
      completed controlled transaction located
      Summary
      Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
      Boundary
      Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
      Operational state
      pilot test
      Needs primary source
      No
      Question pages
        Cash legs & tokenized bank money: its nodesCiti Token Services / SCB
        Badge
        Text
        Live production
        Date
        2026-10-03
        Date kind
        Crypto Hub checked through
        Lane
        networks
        Kind
        adjacent bank project
        Status
        live production
        Summary
        PhillipCapital USD payment from Citi London to SCB Thailand over a US holiday weekend; Citi infrastructure, not the SWIFT ledger.
        Boundary
        Separate project; common bank participation does not establish interoperability with SWIFT.
        Operational state
        live production
        Needs primary source
        No
        Question pages
        Cash legs & tokenized bank money: its nodesDBS
        Badge
        Text
        Pilot test
        Date
        2026-10-03
        Date kind
        Crypto Hub checked through
        Lane
        regulated
        Kind
        bank participant
        Status
        completed controlled transaction located
        Summary
        Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
        Boundary
        Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
        Operational state
        pilot test
        Needs primary source
        No
        Question pages
          Cash legs & tokenized bank money: its nodesDBS Token Services
          Badge
          Text
          Live production
          Date
          2026-10-03
          Date kind
          Crypto Hub checked through
          Lane
          networks
          Kind
          adjacent bank project
          Status
          live production
          Summary
          Bank-controlled EVM-compatible permissioned blockchain and treasury/payment services; exact SWIFT adapter not identified.
          Boundary
          Separate project; common bank participation does not establish interoperability with SWIFT.
          Operational state
          live production
          Needs primary source
          No
          Question pages
            Cash legs & tokenized bank money: its nodesFirst Abu Dhabi Bank
            Badge
            Text
            Pilot test
            Date
            2026-10-03
            Date kind
            Crypto Hub checked through
            Lane
            regulated
            Kind
            bank participant
            Status
            completed controlled transaction located
            Summary
            Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
            Boundary
            Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
            Operational state
            pilot test
            Needs primary source
            No
            Question pages
              Cash legs & tokenized bank money: its nodesFirstRand Bank Limited
              Badge
              Text
              Pilot test
              Date
              2026-10-03
              Date kind
              Crypto Hub checked through
              Lane
              regulated
              Kind
              bank participant
              Status
              initial-use roster; completion not located
              Summary
              Named in SWIFT’s July 9 initial-use cohort. No completed bank-specific shared-ledger receipt located in the September 9 all-bank search.
              Boundary
              Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
              Operational state
              pilot test
              Needs primary source
              No
              Question pages
                • Swift blockchain ledger ready for use ·
                  Date
                  2026-07-09
                • Label
                  SWIFT: all 17 banks, tests and adjacent research (../SWIFT_BANK_TESTS_PARTNERSHIPS_AND_ADJACENT_RESEARCH_2026-09-09.md; not an https link)
                  Date
                  2026-09-09
                Cash legs & tokenized bank money: its nodesHSBC
                Badge
                Text
                Pilot test
                Date
                2026-10-03
                Date kind
                Crypto Hub checked through
                Lane
                regulated
                Kind
                bank participant
                Status
                completed controlled transaction located
                Summary
                Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
                Boundary
                Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
                Operational state
                pilot test
                Needs primary source
                No
                Question pages
                  Cash legs & tokenized bank money: its nodesHSBC Tokenised Deposit Service
                  Badge
                  Text
                  Live production
                  Date
                  2026-10-03
                  Date kind
                  Crypto Hub checked through
                  Lane
                  networks
                  Kind
                  adjacent bank project
                  Status
                  live production
                  Summary
                  USD Hong Kong–Singapore Ant transfers and Singapore corporate wallet transfers; an intrabank TDS service.
                  Boundary
                  Separate project; common bank participation does not establish interoperability with SWIFT.
                  Operational state
                  live production
                  Needs primary source
                  No
                  Question pages
                    Cash legs & tokenized bank money: its nodesLloyds / Agorá
                    Badge
                    Text
                    Pilot test
                    Date
                    2026-10-03
                    Date kind
                    Crypto Hub checked through
                    Lane
                    networks
                    Kind
                    adjacent bank project
                    Status
                    pilot test
                    Summary
                    Three completed tests: CHF-to-GBP dealer/sterling settlement roles and separate CHF/EUR customer-bank transactions.
                    Boundary
                    Separate project; common bank participation does not establish interoperability with SWIFT.
                    Operational state
                    pilot test
                    Needs primary source
                    No
                    Question pages
                    Cash legs & tokenized bank money: its nodesStandard Chartered
                    Badge
                    Text
                    Pilot test
                    Date
                    2026-10-03
                    Date kind
                    Crypto Hub checked through
                    Lane
                    regulated
                    Kind
                    bank participant
                    Status
                    completed controlled transaction located
                    Summary
                    Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
                    Boundary
                    Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
                    Operational state
                    pilot test
                    Needs primary source
                    No
                    Question pages
                      Cash legs & tokenized bank money: its nodesUBS Digital Cash
                      Badge
                      Text
                      Pilot test
                      Date
                      2026-10-03
                      Date kind
                      Crypto Hub checked through
                      Lane
                      networks
                      Kind
                      adjacent bank project
                      Status
                      pilot test
                      Summary
                      Completed domestic and cross-border private-chain pilot in USD, CHF, EUR and CNY; Autoneum named.
                      Boundary
                      Separate project; common bank participation does not establish interoperability with SWIFT.
                      Operational state
                      pilot test
                      Needs primary source
                      No
                      Question pages
                        Cash legs & tokenized bank money: its nodesUOB
                        Badge
                        Text
                        Pilot test
                        Date
                        2026-10-03
                        Date kind
                        Crypto Hub checked through
                        Lane
                        regulated
                        Kind
                        bank participant
                        Status
                        completed controlled transaction located
                        Summary
                        Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
                        Boundary
                        Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
                        Operational state
                        pilot test
                        Needs primary source
                        No
                        Question pages
                          Cash legs & tokenized bank money: its nodesUOB / MAS SGD Testnet
                          Badge
                          Text
                          Pilot test
                          Date
                          2026-10-03
                          Date kind
                          Crypto Hub checked through
                          Lane
                          networks
                          Kind
                          adjacent bank project
                          Status
                          pilot test
                          Summary
                          Completed testnet interbank wCBDC payments with DBS and OCBC, plus a separate repo use case.
                          Boundary
                          Separate project; common bank participation does not establish interoperability with SWIFT.
                          Operational state
                          pilot test
                          Needs primary source
                          No
                          Question pages
                          Cash legs & tokenized bank money: its nodesWells Fargo
                          Badge
                          Text
                          Pilot test
                          Date
                          2026-10-03
                          Date kind
                          Crypto Hub checked through
                          Lane
                          regulated
                          Kind
                          bank participant
                          Status
                          initial-use roster; completion not located
                          Summary
                          Named in SWIFT’s July 9 initial-use cohort. No completed bank-specific shared-ledger receipt located in the September 9 all-bank search.
                          Boundary
                          Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
                          Operational state
                          pilot test
                          Needs primary source
                          No
                          Question pages
                            • Swift blockchain ledger ready for use ·
                              Date
                              2026-07-09
                            • Label
                              SWIFT: all 17 banks, tests and adjacent research (../SWIFT_BANK_TESTS_PARTNERSHIPS_AND_ADJACENT_RESEARCH_2026-09-09.md; not an https link)
                              Date
                              2026-09-09
                            Cash legs & tokenized bank money: its nodesWells Fargo tokenized deposits
                            Badge
                            Text
                            Planned
                            Date
                            2026-10-03
                            Date kind
                            Crypto Hub checked through
                            Lane
                            networks
                            Kind
                            adjacent bank project
                            Status
                            planned
                            Summary
                            Planned limited fall rollout, initially USD-to-GBP on a proprietary blockchain; not a completed service receipt.
                            Boundary
                            Separate project; common bank participation does not establish interoperability with SWIFT.
                            Operational state
                            planned
                            Needs primary source
                            No
                            Question pages
                            Cash legs & tokenized bank money: its nodesWells Fargo / Cosmos stack
                            Badge
                            Text
                            Planned
                            Date
                            2026-10-03
                            Date kind
                            Crypto Hub checked through
                            Lane
                            networks
                            Kind
                            adjacent bank project
                            Status
                            planned
                            Summary
                            Cosmos Labs says Wells Fargo is building its deposit engine on Cosmos. Vendor attribution; no ATOM, Cosmos Hub or SWIFT adapter established.
                            Boundary
                            Separate project; common bank participation does not establish interoperability with SWIFT.
                            Operational state
                            planned
                            Needs primary source
                            No
                            Question pages
                            Cash legs & tokenized bank money: its nodesAlso in this family (printed in full under an earlier family): 7 nodes
                            Date
                            2026-09-01
                            Nodes
                            • Ripple USD (RLUSD)
                            • Canton Global Synchronizer
                            • The Bank of New York Mellon
                            • BNY digital cash
                            • Lloyds Bank
                            • UBS
                            • BNY — SWIFT participant
                            Needs primary source
                            No
                            Question pages
                              For this row’s sourcing, see the saved details, section context and linked research.