Skip to content

The money: what is the dollar on the chain, who owes it, and what backs it? — saved evidence, page 13

Saved evidence through 2026-10-19. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 152–171 of 757. Page 13 of 43.

Section context and qualifications
Uncertainty
  • Primary sources only (Katie, 2026-10-19): official records and the actor's own documents. News, newsletters, blogs and law-firm summaries were removed on 2026-10-19; what rested on them is held in masters/_held/needs_primary_source_2026-10-19.json.
  • Market sizes are issuer-published figures only (the issuer's own page or the attestation report it publishes), each with its own date and basis. DefiLlama and other aggregators are not used (Katie's primary-source rule, 2026-10-19).
  • genius_route is a potential legal route, never a finding that permission was granted. OCC finalized its issuer rule October 21, effective January 18, 2027. Intake and individual approvals retain separate clocks; the saved initial release awaited an opening notice.
  • The July decks are dated July 28–29, 2026 and are history; where they disagree with the coin rows above, the coin rows (checked October 19, 2026) are current.
  • World rows may keep news links (the international room's exception); each says its kind of record.
  • No machine-readable conflict file exists for stablecoins.json in this workbench; recorded world conflicts are printed on their rows with every reading.
SectionRecordSaved detailsSources and dates
All 54 cash-leg nodesDBS
Badge
Text
Pilot test
Date
2026-10-03
Date kind
Crypto Hub checked through
Lane
regulated
Kind
bank participant
Status
completed controlled transaction located
Summary
Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
Boundary
Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
Operational state
pilot test
Needs primary source
No
Question pages
    All 54 cash-leg nodesDBS Token Services
    Badge
    Text
    Live production
    Date
    2026-10-03
    Date kind
    Crypto Hub checked through
    Lane
    networks
    Kind
    adjacent bank project
    Status
    live production
    Summary
    Bank-controlled EVM-compatible permissioned blockchain and treasury/payment services; exact SWIFT adapter not identified.
    Boundary
    Separate project; common bank participation does not establish interoperability with SWIFT.
    Operational state
    live production
    Needs primary source
    No
    Question pages
      All 54 cash-leg nodesFirst Abu Dhabi Bank
      Badge
      Text
      Pilot test
      Date
      2026-10-03
      Date kind
      Crypto Hub checked through
      Lane
      regulated
      Kind
      bank participant
      Status
      completed controlled transaction located
      Summary
      Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
      Boundary
      Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
      Operational state
      pilot test
      Needs primary source
      No
      Question pages
        All 54 cash-leg nodesFirstRand Bank Limited
        Badge
        Text
        Pilot test
        Date
        2026-10-03
        Date kind
        Crypto Hub checked through
        Lane
        regulated
        Kind
        bank participant
        Status
        initial-use roster; completion not located
        Summary
        Named in SWIFT’s July 9 initial-use cohort. No completed bank-specific shared-ledger receipt located in the September 9 all-bank search.
        Boundary
        Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
        Operational state
        pilot test
        Needs primary source
        No
        Question pages
          • Swift blockchain ledger ready for use ·
            Date
            2026-07-09
          • Label
            SWIFT: all 17 banks, tests and adjacent research (../SWIFT_BANK_TESTS_PARTNERSHIPS_AND_ADJACENT_RESEARCH_2026-09-09.md; not an https link)
            Date
            2026-09-09
          All 54 cash-leg nodesHSBC
          Badge
          Text
          Pilot test
          Date
          2026-10-03
          Date kind
          Crypto Hub checked through
          Lane
          regulated
          Kind
          bank participant
          Status
          completed controlled transaction located
          Summary
          Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
          Boundary
          Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
          Operational state
          pilot test
          Needs primary source
          No
          Question pages
            All 54 cash-leg nodesHSBC Tokenised Deposit Service
            Badge
            Text
            Live production
            Date
            2026-10-03
            Date kind
            Crypto Hub checked through
            Lane
            networks
            Kind
            adjacent bank project
            Status
            live production
            Summary
            USD Hong Kong–Singapore Ant transfers and Singapore corporate wallet transfers; an intrabank TDS service.
            Boundary
            Separate project; common bank participation does not establish interoperability with SWIFT.
            Operational state
            live production
            Needs primary source
            No
            Question pages
              All 54 cash-leg nodesLloyds Bank
              Badge
              Text
              Pilot test
              Date
              2026-10-03
              Date kind
              Crypto Hub checked through
              Lane
              regulated
              Kind
              bank participant
              Status
              initial-use roster; completion not located
              Summary
              Named in SWIFT’s July 9 initial-use cohort. No completed bank-specific shared-ledger receipt located in the September 9 all-bank search.
              Boundary
              Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
              Operational state
              pilot test
              Needs primary source
              No
              Question pages
                • Swift blockchain ledger ready for use ·
                  Date
                  2026-07-09
                • Label
                  SWIFT: all 17 banks, tests and adjacent research (../SWIFT_BANK_TESTS_PARTNERSHIPS_AND_ADJACENT_RESEARCH_2026-09-09.md; not an https link)
                  Date
                  2026-09-09
                All 54 cash-leg nodesLloyds / Agorá
                Badge
                Text
                Pilot test
                Date
                2026-10-03
                Date kind
                Crypto Hub checked through
                Lane
                networks
                Kind
                adjacent bank project
                Status
                pilot test
                Summary
                Three completed tests: CHF-to-GBP dealer/sterling settlement roles and separate CHF/EUR customer-bank transactions.
                Boundary
                Separate project; common bank participation does not establish interoperability with SWIFT.
                Operational state
                pilot test
                Needs primary source
                No
                Question pages
                All 54 cash-leg nodesStandard Chartered
                Badge
                Text
                Pilot test
                Date
                2026-10-03
                Date kind
                Crypto Hub checked through
                Lane
                regulated
                Kind
                bank participant
                Status
                completed controlled transaction located
                Summary
                Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
                Boundary
                Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
                Operational state
                pilot test
                Needs primary source
                No
                Question pages
                  All 54 cash-leg nodesUBS
                  Badge
                  Text
                  Pilot test
                  Date
                  2026-10-03
                  Date kind
                  Crypto Hub checked through
                  Lane
                  regulated
                  Kind
                  bank participant
                  Status
                  initial-use roster; completion not located
                  Summary
                  Named in SWIFT’s July 9 initial-use cohort. No completed bank-specific shared-ledger receipt located in the September 9 all-bank search.
                  Boundary
                  Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
                  Operational state
                  pilot test
                  Needs primary source
                  No
                  Question pages
                    • Swift blockchain ledger ready for use ·
                      Date
                      2026-07-09
                    • Label
                      SWIFT: all 17 banks, tests and adjacent research (../SWIFT_BANK_TESTS_PARTNERSHIPS_AND_ADJACENT_RESEARCH_2026-09-09.md; not an https link)
                      Date
                      2026-09-09
                    All 54 cash-leg nodesUBS Digital Cash
                    Badge
                    Text
                    Pilot test
                    Date
                    2026-10-03
                    Date kind
                    Crypto Hub checked through
                    Lane
                    networks
                    Kind
                    adjacent bank project
                    Status
                    pilot test
                    Summary
                    Completed domestic and cross-border private-chain pilot in USD, CHF, EUR and CNY; Autoneum named.
                    Boundary
                    Separate project; common bank participation does not establish interoperability with SWIFT.
                    Operational state
                    pilot test
                    Needs primary source
                    No
                    Question pages
                      All 54 cash-leg nodesUOB
                      Badge
                      Text
                      Pilot test
                      Date
                      2026-10-03
                      Date kind
                      Crypto Hub checked through
                      Lane
                      regulated
                      Kind
                      bank participant
                      Status
                      completed controlled transaction located
                      Summary
                      Named in SWIFT’s July 9 initial-use cohort. A completed bank-specific ledger transaction is publicly reported; inspect its named case.
                      Boundary
                      Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
                      Operational state
                      pilot test
                      Needs primary source
                      No
                      Question pages
                        All 54 cash-leg nodesUOB / MAS SGD Testnet
                        Badge
                        Text
                        Pilot test
                        Date
                        2026-10-03
                        Date kind
                        Crypto Hub checked through
                        Lane
                        networks
                        Kind
                        adjacent bank project
                        Status
                        pilot test
                        Summary
                        Completed testnet interbank wCBDC payments with DBS and OCBC, plus a separate repo use case.
                        Boundary
                        Separate project; common bank participation does not establish interoperability with SWIFT.
                        Operational state
                        pilot test
                        Needs primary source
                        No
                        Question pages
                        All 54 cash-leg nodesWells Fargo
                        Badge
                        Text
                        Pilot test
                        Date
                        2026-10-03
                        Date kind
                        Crypto Hub checked through
                        Lane
                        regulated
                        Kind
                        bank participant
                        Status
                        initial-use roster; completion not located
                        Summary
                        Named in SWIFT’s July 9 initial-use cohort. No completed bank-specific shared-ledger receipt located in the September 9 all-bank search.
                        Boundary
                        Roster name does not resolve every contracting branch, BIC or account agreement. Adjacent projects are separately sourced.
                        Operational state
                        pilot test
                        Needs primary source
                        No
                        Question pages
                          • Swift blockchain ledger ready for use ·
                            Date
                            2026-07-09
                          • Label
                            SWIFT: all 17 banks, tests and adjacent research (../SWIFT_BANK_TESTS_PARTNERSHIPS_AND_ADJACENT_RESEARCH_2026-09-09.md; not an https link)
                            Date
                            2026-09-09
                          All 54 cash-leg nodesWells Fargo tokenized deposits
                          Badge
                          Text
                          Planned
                          Date
                          2026-10-03
                          Date kind
                          Crypto Hub checked through
                          Lane
                          networks
                          Kind
                          adjacent bank project
                          Status
                          planned
                          Summary
                          Planned limited fall rollout, initially USD-to-GBP on a proprietary blockchain; not a completed service receipt.
                          Boundary
                          Separate project; common bank participation does not establish interoperability with SWIFT.
                          Operational state
                          planned
                          Needs primary source
                          No
                          Question pages
                          All 54 cash-leg nodesWells Fargo / Cosmos stack
                          Badge
                          Text
                          Planned
                          Date
                          2026-10-03
                          Date kind
                          Crypto Hub checked through
                          Lane
                          networks
                          Kind
                          adjacent bank project
                          Status
                          planned
                          Summary
                          Cosmos Labs says Wells Fargo is building its deposit engine on Cosmos. Vendor attribution; no ATOM, Cosmos Hub or SWIFT adapter established.
                          Boundary
                          Separate project; common bank participation does not establish interoperability with SWIFT.
                          Operational state
                          planned
                          Needs primary source
                          No
                          Question pages
                          All 54 cash-leg nodesBNY — SWIFT participant
                          Badge
                          Text
                          Current operating
                          Date
                          2026-10-03
                          Date kind
                          Crypto Hub checked through
                          Lane
                          regulated
                          Kind
                          bank group participant
                          Status
                          initial-use roster; completion not located
                          Summary
                          BNY provides RLUSD reserve custody and separately participates in SWIFT’s initial-use cohort. Its private digital-cash platform represents existing bank deposits.
                          Boundary
                          BNY brand/group scope; exact SWIFT contracting bank or branch is not disclosed. The separate reserve-custodian object retains its own identity.
                          Operational state
                          current operating
                          Needs primary source
                          No
                          Question pages
                            Connections among the cash-leg nodesThe Bank of New York Mellon → Ripple USD (RLUSD): primary reserve custody
                            Badge
                            Text
                            Live production
                            Date
                            2025-07-09
                            Date kind
                            Date
                            From
                            The Bank of New York Mellon
                            To
                            Ripple USD (RLUSD)
                            From
                            bny
                            To
                            rlusd
                            Type
                            asset flow
                            Status
                            live
                            Date
                            2025-07-09
                            Claim
                            Ripple selected BNY as primary custodian for RLUSD reserves.
                            Boundary
                            Reserve custody is not issuance or token administration.
                            Operational state
                            live production
                            Needs primary source
                            No
                            Question pages
                              Connections among the cash-leg nodesThe Bank of New York Mellon → Ripple USD (RLUSD): explores payments-ecosystem integration
                              Badge
                              Text
                              Announced only
                              Date
                              2026
                              Date kind
                              Date
                              From
                              The Bank of New York Mellon
                              To
                              Ripple USD (RLUSD)
                              From
                              bny
                              To
                              rlusd
                              Type
                              partnership
                              Status
                              exploration
                              Date
                              2026
                              Claim
                              Ripple says it is collaborating with BNY and exploring integration of RLUSD into BNY's payments ecosystem for joint-customer use cases.
                              Boundary
                              No reviewed source establishes a launched BNY payment product, exact route, volume, currency, contracting entity, finality rule, XRP use or XRPL deployment.
                              Operational state
                              announced
                              Needs primary source
                              No
                              Question pages
                                Connections among the cash-leg nodesJPMorgan Chase Bank, N.A. → Kinexys: bank business line
                                Badge
                                Text
                                Current operating
                                Date
                                2026-09-01
                                Date kind
                                Date
                                From
                                JPMorgan Chase Bank, N.A.
                                To
                                Kinexys
                                From
                                jpmorgan-chase-bank-na
                                To
                                kinexys
                                Type
                                operating
                                Status
                                current
                                Date
                                2026-09-01
                                Claim
                                JPMorgan Chase Bank provides the Kinexys business line.
                                Boundary
                                The business unit is not a separate bank.
                                Operational state
                                current operating
                                Needs primary source
                                No
                                Question pages