| The seven gate layers (the GENIUS Stablecoin Rulebook page's reading) | Backing and custody | - Date
- 2026-10-19
- Date kind
- Master checked through
- Gate: Reserve assets and rights
- Rule: Maintain identifiable, segregated reserves at least equal to outstanding coins at fair value; tokenized forms of specified eligible categories must preserve identical legal rights. · Effect: Attaches eligibility to the underlying claim and rights rather than to a chain, token standard or vendor. · Clock: Proposed rule; daily 5 p.m. demonstration and any published eligibility list are not yet operative. · Watch: Final asset classes, liquidity/concentration limits, Board eligibility list and named tokenized-reserve opinion.
- Gate: Custody and control
- Rule: Covered assets require segregation, protection from creditor claims, possession/control, customer-level records and sub-custodian oversight; tokenized control turns on who can transfer without custodian consent. · Effect: Makes keys, wallet authority, omnibus subledgers and sub-custodian contracts part of the prudential control plane. · Clock: Proposed custody standard; self-custody remains outside where the provider lacks control and does not hold itself out as custodian. · Watch: Final control definition, qualified custodians, sub-custodian contracts and first examined custody stack.
- Question
- What backs the claim, which rights travel through tokenization and who controls the assets?
- Summary
- Join 1:1 fair-value reserves, underlying-asset eligibility, identical rights, segregation, possession/control and sub-custodian records.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The seven gate layers (the GENIUS Stablecoin Rulebook page's reading) | Claim lifecycle | - Date
- 2026-10-19
- Date kind
- Master checked through
- Gate: Supply and reconciliation
- Rule: Mint/burn authority, outstanding liability, reserve value, transaction processing, internal books and custodian records must remain reconcilable. · Effect: Treats on-chain supply as one record in a multi-record operating system, not the whole issuer balance sheet. · Clock: Application evidence and operating controls are proposed; no named stack has passed review. · Watch: Named key holders, supply controls, reconciliation frequency, breaks and examiner access.
- Gate: Distribution and yield
- Rule: Issuer-paid interest or yield for holding, using or retaining a stablecoin is prohibited; specified issuer-funded affiliate, service-provider and white-label paths face a rebuttable presumption. · Effect: Brings contracts, funding flows, branding and reward economics at distribution partners into the issuer perimeter. · Clock: Proposed related-party and rebuttal tests; not a final judgment on every independent reward program. · Watch: Final related-party definition, rebuttal evidence, distributor agreements and funding source.
- Gate: Redemption and liquidity
- Rule: Direct redemption would begin at one coin and generally finish within two business days, subject to onboarding, bounded safe harbors and regulator-imposed emergency limits. · Effect: Separates issuer redemption, reserve monetization and external wallet/exchange/bank settlement clocks. · Clock: Proposed service clock; no universal secondary-market par guarantee or end-to-end payout clock. · Watch: Final holder right, fees, onboarding, liquidity buffers, redemption incidents and cash-settlement receipts.
- Question
- How is supply created, distributed, reconciled and redeemed?
- Summary
- Connect mint/burn authority and issuer books to distribution contracts, direct redemption and external settlement.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The seven gate layers (the GENIUS Stablecoin Rulebook page's reading) | Operations and proof | - Date
- 2026-10-19
- Date kind
- Master checked through
- Gate: Operational risk
- Rule: Governance must cover smart contracts, private keys, cyber, privacy, continuity, third parties, AML/CFT, sanctions, transaction processing and records. · Effect: Turns networks, oracles, bridges, wallets and vendors into accountable dependencies with change, incident and recovery controls. · Clock: Proposed controls; an enterprise parent framework does not erase PPSI-specific accountability. · Watch: Final control standards, service-provider contracts, recovery tests, incidents and supervisory findings.
- Gate: Reporting and examination
- Rule: Monthly examined reserve reports, executive certifications, confidential weekly operating data, public quarterly financials and periodic full-scope examinations would expose the operating body. · Effect: Creates distinct public, supervisory and examiner-access data planes, including access to DLT records. · Clock: Proposed reporting/exam regime; 18-to-36-month exam discretion depends on specified conditions. · Watch: Final forms, first filings, auditor criteria, examination cycle and publication quality.
- Question
- Which controls keep the system inspectable and recoverable?
- Summary
- Bind governance, smart contracts, keys, vendors, cyber, privacy, continuity, financial crime, public reports and examiner access.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The seven gate layers (the GENIUS Stablecoin Rulebook page's reading) | Capital and loss | - Date
- 2026-10-19
- Date kind
- Master checked through
- Gate: Capital and loss
- Rule: Capital combines tangible equity, reserve credit-risk charges, graduated issuance scale, non-reserve revenue and a realized-loss scalar with remediation powers. · Effect: Links reserve counterparties, operating scale, service businesses and historical losses to a separate loss-absorbing buffer. · Clock: All percentages and scalar parameters remain proposed. · Watch: Final calibration, eligible capital, look-through methods, loss data and remediation orders.
- Question
- Which buffer absorbs reserve credit and operating loss?
- Summary
- Keep tangible equity, reserve credit charges, issuance scale, non-reserve revenue, loss history and remediation distinct.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The seven gate layers (the GENIUS Stablecoin Rulebook page's reading) | Parent, state and emergency seams | - Date
- 2026-10-19
- Date kind
- Master checked through
- Gate: Parent, state and transition
- Rule: Parent-bank capital would deconsolidate the PPSI and deduct its minimum from CET1; state issuers retain ordinary state supervision with extraordinary Board backup and a separate large-issuer transition lane. · Effect: Separates subsidiary loss absorption, parent exposure, state supervision and emergency infrastructure failure. · Clock: Proposed capital, enforcement and transition mechanics; no state issuer is converted by this release. · Watch: Final rule, state certification/equivalence, waiver decisions, first examination and emergency action.
- Question
- Where do subsidiary, parent, state and Board responsibility meet?
- Summary
- Track parent CET1, ordinary state supervision, extraordinary Board backup, transition waivers and infrastructure-failure indicators.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | Comment window | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- 60 days
- Anchor
- After Federal Register publication
- Meaning
- The release date alone does not fix the due date.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | GENIUS effective-date backstop | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- 2027-01-18
- Anchor
- Earlier of this date or 120 days after qualifying final rules
- Meaning
- Proposal publication is not final implementation.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | Application completeness | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- 30 days
- Anchor
- After submission
- Meaning
- A material amendment can alter or restart the review sequence.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | Application decision | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- 120 days
- Anchor
- After a complete application
- Meaning
- No actor-specific complete filing or decision exists from the proposal alone.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | Reserve demonstration | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- Daily 5:00 p.m.
- Anchor
- Supervising Reserve Bank time zone
- Meaning
- The 1:1 requirement would apply at all times; the daily time is the minimum demonstration point.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | Direct redemption | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- No more than 2 business days
- Anchor
- After a valid request
- Meaning
- It is not a secondary-market or bank-payout finality guarantee.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | Reserve publication | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- Monthly by noon
- Anchor
- Last day of month for prior month-end noon snapshot
- Meaning
- The reporting snapshot and publication time are different timestamps.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | Supervisory operating data | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- Weekly
- Anchor
- Coin-level issuance, redemption, trading and reserves
- Meaning
- This is distinct from the public monthly and quarterly surfaces.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The nine proposal clocks | Full-scope examination | - Date
- 2026-10-19
- Date kind
- Master checked through
- Value
- 12 months
- Anchor
- Possible 18–36 month interval where conditions permit
- Meaning
- Longer cycles are discretionary and conditional, not a general exemption.
- Needs primary source
- Yes
- Question pages
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The twelve proposed gates and what each changes | What the Fed's GENIUS proposals change in the crypto stack | - Badge
- Text
- Proposed
- Date
- 2026-09-24
- Date kind
- Evidence cutoff
- Status legend
- Label: Issuer / application interface · Meaning: The governed ecosystem contains a payment-stablecoin issuer or issuer-like operating surface that would face the proposal directly if the exact legal entity enters the Board-supervised lane. This is not an eligibility or approval finding.
- Label: Custody / distribution interface · Meaning: The ecosystem supplies custody, distribution, market, cash or payout functions that the issuer would have to map and control, without becoming the issuer merely by providing them.
- Label: Technical control interface · Meaning: The ecosystem can carry token state, contracts, data or interoperability and would be tested as an operational dependency, not as the legal source of issuer authority or reserve eligibility.
- Label: Outside direct issuer perimeter · Meaning: The tracked object is primarily a different asset, market or institutional function. It may connect to the stack, but the proposal does not directly convert it into a payment-stablecoin issuer or reserve.
- Schema version
- 1.0
- Subtitle
- Twenty governed ecosystems mapped against twelve proposed issuer, reserve, custody, redemption, reporting, capital and application gates.
- Evidence cutoff
- 2026-09-24T15:12:00-04:00
- Status
- proposed
- Summary
- The two Board proposals define a possible federal issuer operating constitution and an insured-state-member-bank application path. They regulate legal entities, claims, assets, controls, books and clocks; they do not approve a technology stack. The matrix shows which current Hub surface would be directly tested, used as a regulated service interface, treated as a technical dependency, or remain outside the direct issuer perimeter.
- Boundary
- Every row is a proposal-overlap finding only. It does not establish that an ecosystem is a permitted payment stablecoin issuer, an eligible reserve asset, an approved custodian, a Board-approved subsidiary, compliant with a final rule or operating in a Board-supervised lane.
- Needs primary source
- No
- Question pages
| |
|---|
| The twelve proposed gates and what each changes | Authority and application | - Date
- 2026-09-24
- Date kind
- Home checked through
- Rule
- Identify the issuer, supervisor and approval route. An insured state member bank would apply through its Reserve Bank to the Board for a PPSI subsidiary, with proposed 30-day completeness and 120-day decision clocks.
- Infrastructure effect
- Makes the legal entity, parent, control chain, consortium structure and proposed business plan visible before operation.
- Implementation clock
- Proposed only; no operative R-1900 filing lane or actor-specific approval is established.
- Watch
- Federal Register publication, final rule, application materials, complete filing, decision and conditions.
- Needs primary source
- No
- Question pages
| |
|---|
| The twelve proposed gates and what each changes | Claim and issuer identity | - Date
- 2026-09-24
- Date kind
- Home checked through
- Rule
- Keep a payment stablecoin, deposit, security, native crypto asset and tokenized representation legally distinct.
- Infrastructure effect
- Prevents a shared ledger or brand from collapsing the obligor, asset class, holder right and record authority into one object.
- Implementation clock
- Definition remains proposed; statutory provisions retain their own effective state.
- Watch
- Final definitions, foreign-issuer treatment, deposit/securities boundary and named coin terms.
- Needs primary source
- No
- Question pages
| |
|---|
| The twelve proposed gates and what each changes | Permitted business | - Date
- 2026-09-24
- Date kind
- Home checked through
- Rule
- Issuance, redemption, reserve management/custody, stablecoin/key custody and related services form the core; lending and issuance as loan proceeds are prohibited, while material non-core activity generally needs permission.
- Infrastructure effect
- Forces non-reserve assets, liabilities, affiliate businesses, gas holdings and service revenue into an explicit perimeter.
- Implementation clock
- Proposed prudential boundary; no current business has been tested under the final calibration.
- Watch
- Final permitted-activity text and actor-specific written permissions.
- Needs primary source
- No
- Question pages
| |
|---|
| The twelve proposed gates and what each changes | Reserve assets and rights | - Date
- 2026-09-24
- Date kind
- Home checked through
- Rule
- Maintain identifiable, segregated reserves at least equal to outstanding coins at fair value; tokenized forms of specified eligible categories must preserve identical legal rights.
- Infrastructure effect
- Attaches eligibility to the underlying claim and rights rather than to a chain, token standard or vendor.
- Implementation clock
- Proposed rule; daily 5 p.m. demonstration and any published eligibility list are not yet operative.
- Watch
- Final asset classes, liquidity/concentration limits, Board eligibility list and named tokenized-reserve opinion.
- Needs primary source
- No
- Question pages
| |
|---|
| The twelve proposed gates and what each changes | Custody and control | - Date
- 2026-09-24
- Date kind
- Home checked through
- Rule
- Covered assets require segregation, protection from creditor claims, possession/control, customer-level records and sub-custodian oversight; tokenized control turns on who can transfer without custodian consent.
- Infrastructure effect
- Makes keys, wallet authority, omnibus subledgers and sub-custodian contracts part of the prudential control plane.
- Implementation clock
- Proposed custody standard; self-custody remains outside where the provider lacks control and does not hold itself out as custodian.
- Watch
- Final control definition, qualified custodians, sub-custodian contracts and first examined custody stack.
- Needs primary source
- No
- Question pages
| |
|---|