Skip to content

What is the library waiting on, and when is it due? — saved evidence, page 8

Saved evidence through 2026-11-23. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 141–160 of 638. Page 8 of 32.

Section context and qualifications
Uncertainty
  • A date is when to look again, not when something will happen. Several questions wait for a court, an agency or a filing on no fixed schedule.
  • This list covers the whole library, not only the federal government.
SectionRecordSaved detailsSources and dates
Question by question · Past dueDo the October 9 Russian diesel supply stages produce named contracts cargo deliveries payments or net additional supply?
Badge
Text
Past due
Sub
Look again November 1, 2026
Text
GL 135 and the staged announcement remain the saved primary baseline. October sailing reports are discovery leads; this return did not recover a direct official cargo/port/IMO/loading record or joined discharge/payment. Do not describe missing joins as proof that no voyage occurred.
Look again when
A contract allocation export permission loading discharge customs or payment record names this deal; recheck the November tranche and separately the April 7 2027 license boundary.
Last checked
2026-10-30
Studies
Oil and gas routes and supply
Links
    For this row’s sourcing, see the saved details, section context and linked research.
    Question by question · Past dueWhat did the October 30–31 Atlanta G20 Foreign Ministers’ Meeting actually adopt, disagree on and assign?
    Badge
    Text
    Past due
    Sub
    Look again November 1, 2026
    Text
    State’s October 26 announcement places economic security, navigation, energy/food and supply-chain shocks on the October 30–31 agenda. The research question is which U.S. priorities gain agreement, meet resistance or become institutional assignments; the meeting remains future at the October 28 cutoff.
    Look again when
    After the meeting, retrieve presidency/member statement, attendance and dissent, annexes, named implementing bodies and exact next tasks.
    Last checked
    2026-10-28
    Studies
    How G7 and G20 presidencies steer international priorities
    Links
      For this row’s sourcing, see the saved details, section context and linked research.
      Question by question · Past dueWhich contractor awards, accepted studies, adopted rules, financing commitments, tenders, equipment awards, construction notices or operating receipts emerge from the seven USTDA project-development objects published September 21–25, 2026?
      Badge
      Text
      Past due
      Sub
      Look again November 2, 2026
      Text
      Lobito’s USTDA-funded electrification feasibility study deadline was extended to November 2. Nigeria’s controlling solicitation gave October 13. No award or accepted final study was verified for either. Ghana’s separate study bids are due December 1. DFC’s signed Angolan railway financing has distinct scope and counterparties.
      Look again when
      After the Nigeria and Lobito proposal deadlines, recheck USTDA and recipient sources for contractor awards or amendments. Return earlier on any Türkiye or Buenassa RFP, public study deliverable, Ecuador regulation, Turkish nuclear procedure, financing close, tender or equipment award, construction notice, commissioning or operating receipt.
      Last checked
      2026-11-16
      Studies
      U.S. trade agency pays for early project studies abroad, before any deals
      Links
        For this row’s sourcing, see the saved details, section context and linked research.
        Question by question · Past dueWhat is the first merits appellate ruling on Donald J. Trump's New York criminal judgment in First Department Case 2025-00648, and what does it affirm, reverse, vacate, remit or leave unresolved?
        Badge
        Text
        Past due
        Sub
        Look again November 2, 2026
        Text
        The May 30, 2024 jury verdict and January 10, 2025 judgment produced 34 convictions and an unconditional discharge. The appeal was perfected, and official orders through May 19, 2026 addressed amicus participation; no merits decision was located by the October 1, 2026 cutoff.
        Look again when
        Return earlier when the First Department issues a merits decision, calendaring or argument order materially advancing the appeal, or when the New York Court of Appeals or a federal court accepts review affecting the judgment.
        Last checked
        2026-10-01
        Studies
        The four Trump indictments were four different legal stories
        Links
          For this row’s sourcing, see the saved details, section context and linked research.
          Question by question · Past dueWho held and exercised contractual or governmental authority over the October Ukraine Starshield/Starlink restrictions?
          Badge
          Text
          Past due
          Sub
          Look again November 2, 2026
          Text
          The SpaceX letter signed October 19 seeks a November 2 reply; a distinct Appropriations letter asks Hegseth for a report within 30 days. Neither resolves provider discretion versus government direction or the operating effect.
          Look again when
          Separate SpaceX reply to four senators, Hegseth response to DeLauro/McCollum, actual contracts/instructions and operating records join the decider, scope and effect.
          Last checked
          2026-10-22
          Studies
          What changed across government, October 18–22
          Links
            For this row’s sourcing, see the saved details, section context and linked research.
            Question by question · Past dueDid Binance publish the promised Proof-of-Reserves result, restore withdrawals, reconcile customer liabilities and recovered assets, and document the verified control failure and final loss allocation?
            Badge
            Text
            Past due
            Sub
            Look again November 3, 2026
            Text
            Late November 1 ET return: Binance published an October 31 00:00 UTC PoR snapshot at BTC block 973895. The live unauthenticated page shows eight asset ratios at or above 100% but labels the Merkle root In Progress; recovery update #3 separately names ten assets as fully backed and moves the complete zero-knowledge proof to November 3. Update #4 begins progressive phase-one withdrawals across fifteen networks and claims 95% replenishment, with the remaining 5% in less-liquid non-top-ten tokens. Frozen-asset recovery, all withdrawal phases, complete proof, transaction-level fund transfers, customer reconciliation, postmortem and final loss allocation remain open.
            Look again when
            Return on the operator's revised full zero-knowledge-proof target, or earlier for another recovery update. Require the complete Merkle root/user-verification state, exact asset/entity/liability scope, all withdrawal phases, recovered-asset ledger, completed SAFU/Futures Insurance Fund/corporate transfers, postmortem and final customer/loss reconciliation separately.
            Last checked
            2026-11-01
            Studies
            Who actually controls the crypto infrastructure
            Links
              For this row’s sourcing, see the saved details, section context and linked research.
              Question by question · Past dueDoes Nurses for Nursing Homes open October 26 and produce an accepted participant, payment, completed service year and measured staffing result under the stated state/CMS funding split?
              Badge
              Text
              Past due
              Sub
              Look again November 3, 2026
              Text
              October 27 browser inspection verifies the public CMS application/account entrance and displayed quarterly-payment terms. CMS’s $100 million and states’ at-least-$175 million commitments remain distinct; no authenticated submission, accepted participant, payment, completed service or measured staffing effect was verified.
              Look again when
              Return earlier for an official accepted/enrolled count, first payment, changed terms or service interruption; otherwise recheck November 3. Distinguish public entrance, completed submission, acceptance, enrollment, payment and staffing outcome.
              Last checked
              2026-10-27
              Studies
              What changed across government, October 22–25
              Links
                For this row’s sourcing, see the saved details, section context and linked research.
                Question by question · Past dueDoes the NEHHOR exchange solicitation produce an executed award, delivered oil and later return?
                Badge
                Text
                Past due
                Sub
                Look again November 4, 2026
                Text
                October 28: complete official RFP DE-RP96-27PO00002 and Q&A recovered. The October 27 bid close is confirmed; borrowed oil is returned in kind with the premium paid in dollars. No successful-offer/award, title-transfer, physical-delivery or return receipt was located in inspected official routes. A possible successful-offer posting within two weeks is not an award or guaranteed publication date.
                Look again when
                Recheck November 4, or earlier for a successful-offer/award, quantity and parties, approved schedule or product-transfer order. Retain November 13 as DOE’s target rather than actual delivery. Later verify returned volume and cash premium.
                Last checked
                2026-10-28
                Studies
                What changed across government, October 18–22; Oil and gas routes and supply
                Links
                  For this row’s sourcing, see the saved details, section context and linked research.
                  Question by question · Past dueWhat are the first observable supervisory, ownership, affiliate, operational, pension-transfer, credit-enhancement, capital, liquidity, asset-designation, reserve-credit, resolution or public-loss consequences from the 2026 group-control, interconnectedness, private-rating and structured-security changes, IAIS implementation cycle, EU IRRD application, reciprocal-jurisdiction status, FSOC surveillance, FHLBank insurer funding and offshore-reinsurance cooperation?
                  Badge
                  Text
                  Past due
                  Sub
                  Look again November 6, 2026
                  Text
                  October 29: NAIC’s official index records the CLO filing-exemption amendment adopted and effective October 28. Eligible-rated CLOs retain the CRP/FE route, with SSG assessment outside FE. Four other manual amendments are exposed through November 27. The CRP due-diligence framework and ABS review remain exposures in inspected routes; no named security designation, insurer RBC/capital, liquidity, portfolio or public-loss outcome established.
                  Look again when
                  Return after the November 5 ABS comment gate and November 27 IDAWG exposures, or earlier for CRP-framework adoption, final manual provisions, published security lists, named designation, filed capital change or supervisory/portfolio consequence. Do not treat the October 28 manual amendment as a new company RBC result or universally enacted state statute.
                  Last checked
                  2026-10-29
                  Studies
                  How insurers invest trillions, move risk and share losses with government; Trump's Great Healthcare Plan is nine separate missions, not one operating program
                  Links
                    For this row’s sourcing, see the saved details, section context and linked research.
                    Question by question · Past dueDo CBP instructions implement the October 30 Canadian product-scope change, and what actual entries, duties, exclusions or corrections follow?
                    Badge
                    Text
                    Past due
                    Sub
                    Look again November 6, 2026
                    Text
                    October 30 return: CBP CSMS 70314289, sent October 29 at 10:03 a.m. EDT, gives filing instructions for qualifying entries/withdrawals from 12:01 a.m. eastern time October 30. The .14 scope removes 22 classifications and adds 100; .12/.13 are unchanged. No actual entry, collected duty, refund, correction or trade effect established in the inspected instruction and original annexes.
                    Look again when
                    CBP correction, exclusion, suspension or attributable entry, assessment, collection or refund record. Instruction publication and legal applicability are now verified; seek actual operating receipts without inferring trade effects from an elapsed date.
                    Last checked
                    2026-10-30
                    Studies
                    What changed across government, October 22–25
                    Links
                      For this row’s sourcing, see the saved details, section context and linked research.
                      Question by question · Past dueWhat did the scheduled November Gates commission meeting decide on the sheep hunting-plan comments, and what winter moose permit instrument actually follows WSA26-04?
                      Badge
                      Text
                      Past due
                      Sub
                      Look again November 6, 2026
                      Text
                      CurrentNPSindexschedulesNovember4–5,2026,withsourcealternate-dateerrorretained. October6packetdescribesfurtherconsultationbeforefinaltransmittal;AugustBoardWSA26-04voteadoptedwithFederalregistrationpermitandDecember15–April15winterwindow. NoheldNovembermeeting,finalSecretarialdecisionorissuedwinterpermitestablished.
                      Look again when
                      AftertheprimaryNovember4–5scheduledmeeting,orafteranofficialreschedule;laterbyDecember15winteropeningforactualpermit/managerinstrument. AvailableAprilminutesandexistinglettersremaincurrentwavework.
                      Last checked
                      2026-10-31
                      Studies
                      Federal advisory committees and other public decision forums
                      Links
                        For this row’s sourcing, see the saved details, section context and linked research.
                        Question by question · Past dueWhat did the final Montreal summit documents and later implementation establish?
                        Badge
                        Text
                        Past due
                        Sub
                        Look again November 7, 2026
                        Text
                        The October 30 joint statement launches an Alliance for the Future and sets a 2027 summit horizon to define closer association short of full membership. Canadian membership language remains a stated goal; individual agreements, legal effect and actual use retain separate evidence gates.
                        Look again when
                        Exact individual agreement and signature/effective terms, EuroHPC participation/access decision and actual use, EIB project commitment/disbursement or payment-system implementation. Final statement publication is answered; define closer association by2027summit separately. No all-annex or operating completion claim.
                        Last checked
                        2026-11-01
                        Studies
                        Canada and the EU launch an alliance; closer association remains to be defined
                        Links
                          For this row’s sourcing, see the saved details, section context and linked research.
                          Question by question · Past dueDid a UK Digital Securities Sandbox Gate-2 participant complete an actual live issuance or settlement, and what asset, money and finality rules governed it?
                          Badge
                          Text
                          Past due
                          Sub
                          Look again November 8, 2026
                          Text
                          The UK sandbox notices now permit the HSBC–LSEG standard link subject to conditions and limits. DIGIT has a settlement route in the LSEG notice, with no completed transaction established.
                          Look again when
                          Named live UK DSS issuance or settlement with the security, amount, actual cash and finality record. Separately verify applicable designations, conditions and limits. The Q1 2027 DIGIT target remains future.
                          Last checked
                          2026-11-09
                          Studies
                          What finance has actually moved onto blockchains; Which companies connect the new private money system
                          Links
                            For this row’s sourcing, see the saved details, section context and linked research.
                            Question by question · Past dueWhat does the November 9 SEC data roundtable actually record or change?
                            Badge
                            Text
                            Past due
                            Sub
                            Look again November 9, 2026
                            Text
                            October 19 event announcement is consultation planning, not data-standard adoption or deployment.
                            Look again when
                            Actual recording, filed participant statements, staff response or later data-standard/rule decision appears.
                            Last checked
                            2026-10-22
                            Studies
                            What changed across government, October 18–22
                            Links
                              For this row’s sourcing, see the saved details, section context and linked research.
                              Question by question · Past dueWas payment under the executed ILC settlement received?
                              Badge
                              Text
                              Past due
                              Sub
                              Look again November 9, 2026
                              Text
                              Executed agreement obligates $13 million plus interest, with $6.5 million as restitution. Publication is later than execution. Transfer and alleged underlying cybersecurity events require separate proof.
                              Look again when
                              Payment under November 9 calculated gate and docket disposition.
                              Last checked
                              2026-11-06
                              Studies
                              No public record yet follows a federal dollar all the way down
                              Links
                                For this row’s sourcing, see the saved details, section context and linked research.
                                Question by question · Past dueDoes China extend, expire, replace or activate the October magnet-control suspension before its stated boundary?
                                Badge
                                Text
                                Past due
                                Sub
                                Look again November 10, 2026
                                Text
                                A suspension and its date do not establish what succeeds it or the actual licensed-volume effect. Do not assume: that controls expire automatically, reactivate unchanged or materially loosen or tighten trade.
                                Look again when
                                The stated suspension boundary arrives. Look for: A MOFCOM or SCIO operative extension, expiry, replacement or activation supplies scope and effective date.
                                Last checked
                                2026-07-22
                                Studies
                                U.S. is making rare-earth magnets again, but China still runs the chain
                                Links
                                  For this row’s sourcing, see the saved details, section context and linked research.
                                  Question by question · Past dueWhat do the Big Four replies establish about the specific Malta tax structures, fees and decision chain?
                                  Badge
                                  Text
                                  Past due
                                  Sub
                                  Look again November 10, 2026
                                  Text
                                  October 21 ranking-member requests seek information by November 10; these are not subpoenas, assessments or a proved avoided-tax total.
                                  Look again when
                                  Actual Deloitte, EY, KPMG and PwC replies plus transaction/legal records distinguish claims from established structures, assessment and recovery.
                                  Last checked
                                  2026-10-22
                                  Studies
                                  What changed across government, October 18–22
                                  Links
                                    For this row’s sourcing, see the saved details, section context and linked research.
                                    Question by question · Past dueDo November EIA and IEA releases change the Gulf, U.S. exports, fuel-stock and LNG observations?
                                    Badge
                                    Text
                                    Past due
                                    Sub
                                    Look again November 10, 2026
                                    Text
                                    October releases are incorporated; monthly petroleum and U.S. LNG observations reach August. Broader country, cargo and pipeline records retain their older dates.
                                    Look again when
                                    Check EIA STEO November 10, IEA OMR November 13, and actual EIA monthly tables on/after November 30. Preserve publication, model and observation clocks.
                                    Last checked
                                    2026-10-30
                                    Studies
                                    Oil and gas routes and supply
                                    Links
                                      For this row’s sourcing, see the saved details, section context and linked research.
                                      Question by question · Past dueWhat project decisions and operating results follow TVA’s IRP adoption and RERC advice?
                                      Badge
                                      Text
                                      Past due
                                      Sub
                                      Look again November 10, 2026
                                      Text
                                      Council advice expressly considered/attached in adopted planning record; resolution commits no individual project.
                                      Look again when
                                      November3 agenda/November10 held meeting, project-specific approvals, signed instruments and signpost/customer outcomes.
                                      Last checked
                                      2026-10-30
                                      Studies
                                      Federal advisory committees and other public decision forums
                                      Links
                                        For this row’s sourcing, see the saved details, section context and linked research.
                                        Question by question · Past dueDo fall resale listings and closings pick up, and does the share of low-rate loans fall faster?
                                        Badge
                                        Text
                                        Past due
                                        Sub
                                        Look again November 12, 2026
                                        Text
                                        September 2026 resales ran at 3.99 million annualized, with 1.60 million listed and 4.8 months of supply. About half of the measured mortgage stock still had rates near or below 4%. September resale turnover relative to the housing stock was about 19% below September 2008.
                                        Look again when
                                        Read NAR October Existing-Home Sales on November 12 and compare new listings or pending sales where available. Return again when FHFA releases the next NMDB outstanding mortgage distribution.
                                        Last checked
                                        2026-11-09
                                        Studies
                                        How U.S. mortgages work from application to payoff
                                        Links
                                          For this row’s sourcing, see the saved details, section context and linked research.