Skip to content

What is the library waiting on, and when is it due? — saved evidence, page 32

Saved evidence through 2026-11-23. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 621–638 of 638. Page 32 of 32.

Section context and qualifications
Uncertainty
  • A date is when to look again, not when something will happen. Several questions wait for a court, an agency or a filing on no fixed schedule.
  • This list covers the whole library, not only the federal government.
SectionRecordSaved detailsSources and dates
Question by question · No date: look again when a condition is metWhich exact district-court order and any appeal control the Gulf ESA national-security exemption dismissal reported November 19?
Badge
Text
Condition
Sub
Look again when the condition is met
Text
DOJ’s November 19 release reports D.D.C. dismissal because review of the exemption belongs in the courts of appeals. The exact docket/order was not independently recovered.
Look again when
Exact public court order, docket or appeal identifies the case and operative disposition.
Last checked
2026-11-21
Studies
Court cases and Justice Department research; Oil and gas routes and supply
Links
    For this row’s sourcing, see the saved details, section context and linked research.
    Question by question · No date: look again when a condition is metA completed investigation showing how the revised procedure was actually used.
    Badge
    Text
    Condition
    Sub
    Look again when the condition is met
    Text
    The committee adopted rules on November 19 and announced them November 20. Rule 18(f) permits the chair and ranking member jointly, or a committee majority, to authorize subpoenas after consulting all members at least one business day beforehand. It requires both sides’ signatures. Rule 7(f) adds public disclosure of sexual-misconduct findings while protecting victim identities. This is an internal procedural change, not a finding against any named member or proof investigations will finish faster. The 51-page markup combines additions and deletions; extracted text alone obscures them.
    Look again when
    A completed investigation showing how the revised procedure was actually used.
    Last checked
    2026-11-21
    Studies
    Every congressional committee mapped as its own body, not as a branch of an agency
    Links
      For this row’s sourcing, see the saved details, section context and linked research.
      Question by question · No date: look again when a condition is metThe actual released report and its exact public scope.
      Badge
      Text
      Condition
      Sub
      Look again when the condition is met
      Text
      HPSCI held a business meeting and voted out the unclassified interim report on its investigation into Intelligence Community handling of anomalous health incidents. The release says publication will follow completion of security review. Approval for release is not publication. The report’s underlying findings and classified evidence were not available in the reached announcement.
      Look again when
      The actual released report and its exact public scope.
      Last checked
      2026-11-21
      Studies
      Every congressional committee mapped as its own body, not as a branch of an agency
      Links
        For this row’s sourcing, see the saved details, section context and linked research.
        Question by question · No date: look again when a condition is metVA’s independent life-cycle cost estimate, exact contract modification and later accepted deployment/performance records.
        Badge
        Text
        Condition
        Sub
        Look again when the condition is met
        Text
        The Senate heard VA, GAO and Oracle on November 18; the House heard Oracle on November 19. Senate Chair Moran called for a complete independent life-cycle cost estimate. The House chair’s prepared remarks identify Oracle CEO Mike Sicilia as appearing after earlier September oversight. Testimony and the demand for a cost estimate do not establish delivery, accepted performance, a final total program cost or that either earlier subpoena was satisfied in full. The reported contract ceiling is not spending.
        Look again when
        VA’s independent life-cycle cost estimate, exact contract modification and later accepted deployment/performance records.
        Last checked
        2026-11-21
        Studies
        Every congressional committee mapped as its own body, not as a branch of an agency
        Links
          For this row’s sourcing, see the saved details, section context and linked research.
          Question by question · No date: look again when a condition is metRecipient acknowledgment, accepted scope, DNFSB answers, OIG briefing and GAO engagement or report.
          Badge
          Text
          Condition
          Sub
          Look again when the condition is met
          Text
          Murray and Kaptur sent distinct requests concerning DOE’s August 13 Project Velocity initiative to DOE OIG, DNFSB and GAO. OIG is asked for a briefing on the planned review’s scope/timeline within 30 days; DNFSB is asked for answers within 30 days. The GAO letter seeks a comprehensive review without the same response deadline. The lawmakers’ concerns do not prove new safety failures, contractor misconduct or an opened/completed investigation. The three review channels and requested products differ.
          Look again when
          Recipient acknowledgment, accepted scope, DNFSB answers, OIG briefing and GAO engagement or report.
          Last checked
          2026-11-21
          Studies
          Every congressional committee mapped as its own body, not as a branch of an agency
          Links
            For this row’s sourcing, see the saved details, section context and linked research.
            Question by question · No date: look again when a condition is metAny enacted authority, actual procurement instruction, public production records or company/agency implementation.
            Badge
            Text
            Condition
            Sub
            Look again when the condition is met
            Text
            Homeland Security and the China Select Committee released a joint report. Its investigation section records written submissions, productions and briefings from Airbnb, Anysphere and DoorDash. The report proposes model-provenance standards and broader restrictions for federal work and high-risk infrastructure. These recommendations are not an enacted general ban. Company inventory includes evaluated/tested/deployed models and cannot all be counted as production use. Annex A states moderate confidence; the separate classified annex is unavailable. Underlying company productions were not independently reviewed.
            Look again when
            Any enacted authority, actual procurement instruction, public production records or company/agency implementation.
            Last checked
            2026-11-21
            Studies
            Every congressional committee mapped as its own body, not as a branch of an agency
            Links
              For this row’s sourcing, see the saved details, section context and linked research.
              Question by question · No date: look again when a condition is metNovember 23 response/briefing and verified operational root-cause and remediation records.
              Badge
              Text
              Condition
              Sub
              Look again when the condition is met
              Text
              The November 16 letter, publicized November 17, requests a joint technical briefing with FAA, L3Harris and Juniper, and information by November 23 after the November 13 nationwide ground stop. It asks to pause further Juniper deployment until tested readiness, independent validation, failover and rollback are demonstrated. This is a request, not an FAA deployment order. The letter itself says identifying the failed device does not establish why it failed; contractor and agency accounts must be distinguished.
              Look again when
              November 23 response/briefing and verified operational root-cause and remediation records.
              Last checked
              2026-11-21
              Studies
              Every congressional committee mapped as its own body, not as a branch of an agency
              Links
                For this row’s sourcing, see the saved details, section context and linked research.
                Question by question · No date: look again when a condition is metFTA/OMB response, proposal/final disposition and project-specific signed grant agreements.
                Badge
                Text
                Condition
                Sub
                Look again when the condition is met
                Text
                Murray, Warren and Larsen renewed their August 11 CIG inquiry, challenged proposed guidance in docket FTA-2026-0331, requested advancement/agreements for named projects and demanded the agency’s effects analysis and preservation of records. They requested a written answer by December 1. Their funding-delay and projected eligibility-loss claims remain attributed. A comment letter is not final guidance; neither an executed grant agreement nor money paid is established here.
                Look again when
                FTA/OMB response, proposal/final disposition and project-specific signed grant agreements.
                Last checked
                2026-11-21
                Studies
                Every congressional committee mapped as its own body, not as a branch of an agency
                Links
                  For this row’s sourcing, see the saved details, section context and linked research.
                  Question by question · No date: look again when a condition is metOccurrence record, transcript/production and any documented agency or contractor instruction.
                  Badge
                  Text
                  Condition
                  Sub
                  Look again when the condition is met
                  Text
                  The three chairmen announced Jensen Huang agreed to appear December 1 and NVIDIA General Counsel Tim Teter December 2 for transcribed interviews. Agreement and dates do not prove the interviews occurred, a transcript exists or any allegation is established. The contractor EO signed November 20 has no observed implementation receipt tied to these interviews.
                  Look again when
                  Occurrence record, transcript/production and any documented agency or contractor instruction.
                  Last checked
                  2026-11-21
                  Studies
                  Every congressional committee mapped as its own body, not as a branch of an agency
                  Links
                    For this row’s sourcing, see the saved details, section context and linked research.
                    Question by question · No date: look again when a condition is metOriginal letter, NIST briefing/response and original audit closure and recovery records.
                    Badge
                    Text
                    Condition
                    Sub
                    Look again when the condition is met
                    Text
                    Babin and McCormick requested a NIST briefing by December 11 about MEP performance data, questioned costs, recoveries and conflicts following four Commerce OIG reports. The release says 22 of 23 cited recommendations remained open. The committee’s audit summary is attributed. It does not prove funds recovered or recommendations closed; the tracked original letter link was not resolved to a retained primary PDF.
                    Look again when
                    Original letter, NIST briefing/response and original audit closure and recovery records.
                    Last checked
                    2026-11-21
                    Studies
                    Every congressional committee mapped as its own body, not as a branch of an agency
                    Links
                      For this row’s sourcing, see the saved details, section context and linked research.
                      Question by question · No date: look again when a condition is metAgency violation reports under 31 USC 1351, any controlling legal response and actual corrective action.
                      Badge
                      Text
                      Condition
                      Sub
                      Look again when the condition is met
                      Text
                      GAO B-337988 concludes the President’s partial March 24, 2025 emergency designation did not satisfy the all-amounts condition in section 1110(b) of the FY2025 continuing resolution. GAO finds DOJ, HUD and NASA violated the Antideficiency Act by obligating and expending funds before legal availability, and says they should report the violations. This is GAO’s legal decision, not a court judgment, penalty, recovery or compliance receipt. It distinguishes availability from budget-cap treatment and considers OMB’s contrary interpretation.
                      Look again when
                      Agency violation reports under 31 USC 1351, any controlling legal response and actual corrective action.
                      Last checked
                      2026-11-21
                      Studies
                      Every congressional committee mapped as its own body, not as a branch of an agency
                      Links
                        For this row’s sourcing, see the saved details, section context and linked research.
                        Question by question · No date: look again when a condition is metFY2027 spending-plan evidence, investment estimates, actual property dispositions and GAO closure evidence.
                        Badge
                        Text
                        Condition
                        Sub
                        Look again when the condition is met
                        Text
                        GAO-27-108665 reports rapid ICE detention expansion without adequate updated spending plans and life-cycle cost analysis. It recommends timely updated spending plans and, with DHS management, cost estimates and alternatives analysis before significant new facility investments. The report identifies Reed, Peters, Durbin and Thompson as requesters. DHS concurrence is not implementation: GAO maintained both recommendations despite DHS asking that one be closed. Acquisitions, planned sales and operating costs are distinct from proved waste recovered.
                        Look again when
                        FY2027 spending-plan evidence, investment estimates, actual property dispositions and GAO closure evidence.
                        Last checked
                        2026-11-21
                        Studies
                        Every congressional committee mapped as its own body, not as a branch of an agency
                        Links
                          For this row’s sourcing, see the saved details, section context and linked research.
                          Question by question · No date: look again when a condition is metControlling published law, Treasury/Mint rules and dated implementation.
                          Badge
                          Text
                          Condition
                          Sub
                          Look again when the condition is met
                          Text
                          The live White House signing statement confirms H.R.10167 was signed November 20. The committee separately welcomes the signature. The statement describes ending circulating-penny minting and a cash-rounding framework. The signing notice is not the complete statute, implementing guidance, a measured cash-rounding outcome or proof all operational transitions are complete.
                          Look again when
                          Controlling published law, Treasury/Mint rules and dated implementation.
                          Last checked
                          2026-11-21
                          Studies
                          Every congressional committee mapped as its own body, not as a branch of an agency
                          Links
                            For this row’s sourcing, see the saved details, section context and linked research.
                            Question by question · No date: look again when a condition is metAny House-side approval, available funding, contracts, move records and actual disposal instrument.
                            Badge
                            Text
                            Condition
                            Sub
                            Look again when the condition is met
                            Text
                            The adopted POP-0001-MU26 resolution approves a $215,553,000 prospectus, limited to DOE headquarters disposal preparation, reconfiguration/renovation of the Lyndon B.Johnson Building and other locations, and employee relocation. Unused authorization cannot fund other activity without written committee-leader approval; the resolution preserves requested-document access and bars delegation of its authority. This is the Senate committee prospectus gate under40 USC3307, not a new appropriation, a complete two-chamber approval census, an obligation, a completed move or a property sale. The amount is the prospectus authorization, not cash spent.
                            Look again when
                            Any House-side approval, available funding, contracts, move records and actual disposal instrument.
                            Last checked
                            2026-11-21
                            Studies
                            Every congressional committee mapped as its own body, not as a branch of an agency
                            Links
                              For this row’s sourcing, see the saved details, section context and linked research.
                              Question by question · No date: look again when a condition is metControlling published law, exact authorized term and later commission work.
                              Badge
                              Text
                              Condition
                              Sub
                              Look again when the condition is met
                              Text
                              The November19 Foreign Affairs release reports the President signed H.R.1744, the United States Commission on International Religious Freedom Reauthorization Act of2026, and says it extends the commission through the end of2028. This is the committee’s signature account and description. The complete statute, public-law number and new commission operations were not independently read or recertified in this committee pass.
                              Look again when
                              Controlling published law, exact authorized term and later commission work.
                              Last checked
                              2026-11-21
                              Studies
                              Every congressional committee mapped as its own body, not as a branch of an agency
                              Links
                                For this row’s sourcing, see the saved details, section context and linked research.
                                Question by question · No date: look again when a condition is metWhat does the period-specific ORNL written performance evaluation and earned-fee determination show about use of the assurance and independent-assessment design?
                                Badge
                                Text
                                Condition
                                Sub
                                Look again when the condition is met
                                Text
                                The posted FY2026PEMP combines contractor information/validity with DOE independent assessment; actual written evaluation and fee outcome were not retrieved.
                                Look again when
                                A period-specific ORNL written evaluation or earned-fee determination becomes relevant to a concrete performance/assurance question.
                                Last checked
                                2026-11-21
                                Studies
                                Federal advisory committees and other public decision forums
                                Links
                                  For this row’s sourcing, see the saved details, section context and linked research.
                                  Question by question · No date: look again when a condition is metWhich named SEF, DCM or DCO publicly documents using Letter 26-31 for operating resources, and how does it meet the separate liquidity requirement?
                                  Badge
                                  Text
                                  Condition
                                  Sub
                                  Look again when the condition is met
                                  Text
                                  November 23: CFTC staff recognizes BTC, ETH and qualifying payment stablecoins in market operators’ annual operating resources, with haircuts; the separate liquidity requirement remains and this advisory is not a no-action position.
                                  Look again when
                                  A named operator publishes an attributable financial-resource computation or statement, crypto holding and haircut, liquid-resource or committed-facility arrangement; staff clarifies cash-equivalent/tokenized-security treatment; the Commission issues a rule; or an actual shortfall, conversion, draw or recovery becomes public.
                                  Last checked
                                  2026-11-23
                                  Studies
                                  Which companies connect the new private money system; Accounting built from shared business events
                                  Links
                                    For this row’s sourcing, see the saved details, section context and linked research.
                                    Question by question · No date: look again when a condition is metWhat are the final text, publication/effective/compliance dates and staff-letter transition for the covered-event-contract reporting rule, and which exchange implements it?
                                    Badge
                                    Text
                                    Condition
                                    Sub
                                    Look again when the condition is met
                                    Text
                                    Complete187-page approved final recovered and compared with published proposal. Core scope,125000thresholds and trader-data text retained; settlement reporting/publication and DCO record duties clarified; identity collection gets12months; CME25-23not directed withdrawn. Final effectiveness60days after publication, but publication date and operational transition not established.
                                    Look again when
                                    Federal Register final version appears: compare technical corrections and establish effective/compliance dates. Check operative staff withdrawal/transition instructions, including the retained CME25-23position; then a named DCM implementation, accepted reporting, correction or surveillance result.
                                    Last checked
                                    2026-11-23
                                    Studies
                                    Which companies connect the new private money system
                                    Links
                                      For this row’s sourcing, see the saved details, section context and linked research.