Skip to content

What is the library waiting on, and when is it due? — saved evidence, page 29

Saved evidence through 2026-11-23. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 561–580 of 638. Page 29 of 32.

Section context and qualifications
Uncertainty
  • A date is when to look again, not when something will happen. Several questions wait for a court, an agency or a filing on no fixed schedule.
  • This list covers the whole library, not only the federal government.
SectionRecordSaved detailsSources and dates
Question by question · No date: look again when a condition is metDo the implementing agencies document and post accruals under SAMM C14.8.7?
Badge
Text
Condition
Sub
Look again when the condition is met
Text
DSCA immediately added a quarterly accrual requirement even when the receiving report or invoice is missing. Procedure adoption does not prove booked accruals, payment or auditor closure.
Look again when
Posted entries, reconciliation and audit follow-up.
Last checked
2026-11-06
Studies
The military is reorganizing around shared data, with named vendors at the center
Links
    For this row’s sourcing, see the saved details, section context and linked research.
    Question by question · No date: look again when a condition is metDoes the signed Blue Marlin decision and issued license become available?
    Badge
    Text
    Condition
    Sub
    Look again when the condition is met
    Text
    DOT reports MARAD approved the deepwater-port application. Signed ROD and issued license are unrecovered. Capacity is proposed, with no observed throughput.
    Look again when
    Decision, conditions, license issuance and first cargo.
    Last checked
    2026-11-06
    Studies
    Oil and gas routes and supply
    Links
      For this row’s sourcing, see the saved details, section context and linked research.
      Question by question · No date: look again when a condition is metWhat were the results of the November 10 rolls and November 12 swaps?
      Badge
      Text
      Condition
      Sub
      Look again when the condition is met
      Text
      A dated New York Fed dashboard rendition reports $20 million par accepted for November 12 agency MBS coupon swaps. Planned November 10 dollar rolls, completed settlement and policy changes remain unverified; stable API read was blocked.
      Look again when
      Exact November 10 and November 12 results and settlement receipts.
      Last checked
      2026-11-16
      Studies
      The Fed is many legal bodies, and its building cost doubled
      Links
        For this row’s sourcing, see the saved details, section context and linked research.
        Question by question · No date: look again when a condition is metDoes Nodal designate a trust company under Letter 26-30, and which asset and account actually discharge clearing-member obligations?
        Badge
        Text
        Condition
        Sub
        Look again when the condition is met
        Text
        November18 native Nodal collateral, filing and disclosure routes retain the earlier public picture: commercial-bank USD settlement and weekend margin in the next business-day cycle. No named new trust settlement provider, accepted stablecoin launch or FedNow margin route was established in this bounded check. The new comparison separates ordinary payment, liquidity-event powers and funding resources.
        Look again when
        On a Nodal or CFTC filing naming an asset or trust company, get the charter/activity authority, account and settlement agreement, and accepted asset and legal finality terms. Then seek matched first-use records and test weekend redemption, prefunding or a committed liquidity draw independently.
        Last checked
        2026-11-18
        Studies
        Which companies connect the new private money system; The Fed is many legal bodies, and its building cost doubled
        Links
          For this row’s sourcing, see the saved details, section context and linked research.
          Question by question · No date: look again when a condition is metDoes official account 94IE participation become effective, and what later evidence shows actual submissions?
          Badge
          Text
          Condition
          Sub
          Look again when the condition is met
          Text
          DTCC’s GSD directory labeled November 17 lists Daiwa Capital Markets America Inc / ACM Omnibus, account 94IE, for Netting and Repo Netting. The November 6 notice scheduled November 12 participation. Roster inclusion is now verified; actual submissions, novation, settlement and customer outcomes remain source-triggered questions.
          Look again when
          A successor FICC notice changing account 94IE, or a named participant/operator record of submissions, novation, settlement or customer outcomes. The post-effective roster question is answered.
          Last checked
          2026-11-20
          Studies
          Who actually controls the crypto infrastructure
          Links
            For this row’s sourcing, see the saved details, section context and linked research.
            Question by question · No date: look again when a condition is metWhat realized recurring volume, liquidity, costs and failure outcomes do the named card-network stablecoin settlement and prefunding products produce?
            Badge
            Text
            Condition
            Sub
            Look again when the condition is met
            Text
            Visa reports >$25B annualized settlement and Inyo USDC prefunding production; SoFi reports live card settlement with a full-program migration expected above $25B annualized. These are not matched realized annual totals.
            Look again when
            Visa/Inyo, Mastercard/SoFi or a named participant publishes period totals and methodology, participant/chain allocation, liquidity or fee evidence, redemption/reconciliation or a handled failure.
            Last checked
            2026-11-07
            Studies
            How card networks are changing payments; Which companies connect the new private money system
            Links
              For this row’s sourcing, see the saved details, section context and linked research.
              Question by question · No date: look again when a condition is metWhen do Visa VSP and Mastercard/BVNK component services cross their currently disclosed API, beta and asset-specific limits?
              Badge
              Text
              Condition
              Sub
              Look again when the condition is met
              Text
              VSP has limited/beta OUSD access and a forthcoming API; BVNK cards are beta and detailed rewards documentation lists USDC with OUSD forthcoming.
              Look again when
              VSP publishes live API access/terms; BVNK removes card beta or publishes OUSD rewards terms/activation; a named combined-platform integrator publishes production use.
              Last checked
              2026-11-07
              Studies
              How card networks are changing payments; Which companies connect the new private money system
              Links
                For this row’s sourcing, see the saved details, section context and linked research.
                Question by question · No date: look again when a condition is metWhich final shared intent standards, registered-agent terms and actual remedies govern card purchases by AI agents?
                Badge
                Text
                Condition
                Sub
                Look again when the condition is met
                Text
                EMVCo has a draft Intent Services framework; Amex publishes intent/credential designs while its indexed company page still describes future agent purchase protection.
                Look again when
                EMVCo publishes a final framework or comment disposition; Amex publishes a registered-agent list and effective protection terms; a network or merchant publishes a handled agent-error dispute. Recheck public outputs following the listed November 10–12 technical meeting, without assuming publication.
                Last checked
                2026-11-07
                Studies
                How card networks are changing payments; Which companies connect the new private money system
                Links
                  For this row’s sourcing, see the saved details, section context and linked research.
                  Question by question · No date: look again when a condition is metDid the scheduled JCB/Lawson USDC store test occur, what did it find, and has regular customer service followed?
                  Badge
                  Text
                  Condition
                  Sub
                  Look again when the condition is met
                  Text
                  The August 19 source scheduled an August 20 staff PoC with Base USDC barcode tender and fiat merchant payout. No completed-test findings or commercial rollout located in this review.
                  Look again when
                  JCB, Lawson, Digital Garage or Canal publishes executed-test results, ordinary customer eligibility, merchant terms, refund handling or a commercial rollout.
                  Last checked
                  2026-11-07
                  Studies
                  How card networks are changing payments; Which companies connect the new private money system
                  Links
                    For this row’s sourcing, see the saved details, section context and linked research.
                    Question by question · No date: look again when a condition is metWhich foreign-flag voyage is first documented through the third extension’s approval and §501(c) report?
                    Badge
                    Text
                    Condition
                    Sub
                    Look again when the condition is met
                    Text
                    CBP put out voyage-by-voyage implementation instructions for the third DHS Jones Act waiver extension. A covered product or extension does not authorize a specific voyage or prove cargo moved.
                    Look again when
                    Signed waiver and a named post-November-16 MARAD voyage report.
                    Last checked
                    2026-11-16
                    Studies
                    The military relies on commercial transport and plans for power during outages
                    Links
                      For this row’s sourcing, see the saved details, section context and linked research.
                      Question by question · No date: look again when a condition is metWhat final technical record attributes the November 13 FTI disruption, and what remediation followed?
                      Badge
                      Text
                      Condition
                      Sub
                      Look again when the condition is met
                      Text
                      The FAA began resuming traffic at 8:15 p.m. EST November 13 and the Command Center's cancellation notice was effective and signed at 8:19 p.m. The FAA identified two possible source sites in its investigation. Root cause and any specific exceptional clearance remain unresolved.
                      Look again when
                      Final FAA or independent incident report, contractor diagnostic disposition or attributable flight-level clearance and movement.
                      Last checked
                      2026-11-16
                      Studies
                      FAA replaces aging air-traffic information displays at its first five sites
                      Links
                        For this row’s sourcing, see the saved details, section context and linked research.
                        Question by question · No date: look again when a condition is metWhat separate non-FTA and FERC permissions and first export follow CP2 expansion Order 5521?
                        Badge
                        Text
                        Condition
                        Sub
                        Look again when the condition is met
                        Text
                        DOE issued CP2 expansion FTA export authority for up to 620.5 Bcf/year equivalent. Non-FTA order, FERC expansion permission and actual exports are separate.
                        Look again when
                        Non-FTA decision, FERC orders and eventual operating and cargo data.
                        Last checked
                        2026-11-16
                        Studies
                        Oil and gas routes and supply
                        Links
                          For this row’s sourcing, see the saved details, section context and linked research.
                          Question by question · No date: look again when a condition is metWhat form do the proposed state Medicaid prepayment and direct CMS eligibility audit controls take in final text and implementation?
                          Badge
                          Text
                          Condition
                          Sub
                          Look again when the condition is met
                          Text
                          CMS moved from the February RFI to a standalone program-integrity proposal covering provider enrollment, Medicaid claims and state eligibility audits. Proposed text and estimated savings supply no new operative obligations, disallowance or collections. November 18: CMS6098-P remains proposed, with November19 publication scheduled and CMS listing January19 comments. Separate hospice/HHA extensions are published under their existing authorities.
                          Look again when
                          Publication and final text; after effectiveness, state prepayment instructions, audit and claim receipts.
                          Last checked
                          2026-11-18
                          Studies
                          No public record yet follows a federal dollar all the way down
                          Links
                            For this row’s sourcing, see the saved details, section context and linked research.
                            Question by question · No date: look again when a condition is metDid the permitted Navajo E-Rate fiber project enter construction and connect the 50 planned locations?
                            Badge
                            Text
                            Condition
                            Sub
                            Look again when the condition is met
                            Text
                            The dashboard records 9 of 9 federal processes complete November 9. An overlapping E-Rate funding request (2099078989) has $17.56 million in authorized disbursements. A complete site-by-site join, construction acceptance and live service at all 50 locations remain open.
                            Look again when
                            Site-level E-Rate and permit crosswalk, signed segment instrument, first in-service notice or project acceptance.
                            Last checked
                            2026-11-16
                            Studies
                            Federal advisory committees and other public decision forums
                            Links
                              For this row’s sourcing, see the saved details, section context and linked research.
                              Question by question · No date: look again when a condition is metWhat official records quantify SSA emergency card issuance and savings-security match case outcomes?
                              Badge
                              Text
                              Condition
                              Sub
                              Look again when the condition is met
                              Text
                              TN 18 confirms the February 9 start of the emergency card route and its September 18 documentation. The published match policy is current under TN 76, whose change summary and outcome counts remain open.
                              Look again when
                              TN 76 predecessor or change sheet, official issuance or audit report, match action counts or named administrative disposition.
                              Last checked
                              2026-11-16
                              Studies
                              The Fed is many legal bodies, and its building cost doubled
                              Links
                                For this row’s sourcing, see the saved details, section context and linked research.
                                Question by question · No date: look again when a condition is metHow do the post-NDAA CAS practice-change rule and Board appointments implement section 1806?
                                Badge
                                Text
                                Condition
                                Sub
                                Look again when the condition is met
                                Text
                                The law revises 41 U.S.C. §§1501 and 1503(b). The public agenda lists RIN 0348-AB94 without a Federal Register citation. The roster does not name nonvoting appointees or establish voting status.
                                Look again when
                                Published RIN 0348-AB94 instrument, a case applying the new calculation, or an official appointment or roster update.
                                Last checked
                                2026-11-16
                                Studies
                                Federal advisory committees and other public decision forums
                                Links
                                  For this row’s sourcing, see the saved details, section context and linked research.
                                  Question by question · No date: look again when a condition is metWhat rights did IBM reserve under L261471, what was transferred outside the U.S., and do IBM and Circle sign a separate commercial agreement?
                                  Badge
                                  Text
                                  Condition
                                  Sub
                                  Look again when the condition is met
                                  Text
                                  Reel 076225/0314 supplies the U.S. transfer and its attached schedules. The public short form expressly reserves IBM rights and licenses under L261471 without publishing the operative terms. The annex matches three Maximo-adjacent patents and one secure-cloud control from the earlier test set.
                                  Look again when
                                  Publication of L261471 or its reservations, foreign property instruments, a further U.S. recordation or correction, or a jointly evidenced commercial deployment.
                                  Last checked
                                  2026-11-17
                                  Studies
                                  Which companies connect the new private money system
                                  Links
                                    For this row’s sourcing, see the saved details, section context and linked research.
                                    Question by question · No date: look again when a condition is metWhich World Bank Group project first disburses through the proposed Citi–Circle USDC route, and where is a recipient credited?
                                    Badge
                                    Text
                                    Condition
                                    Sub
                                    Look again when the condition is met
                                    Text
                                    The November 17 release opens exploration with Citi banking connections and Circle USDC infrastructure. FundsChain already tracks projects through a separate ledger. The release names no executed disbursement.
                                    Look again when
                                    A World Bank Group or participant record names the borrower country, project, cash and token legs, receiving institution or payout to the beneficiary.
                                    Last checked
                                    2026-11-17
                                    Studies
                                    Who actually controls the crypto infrastructure; How 16 financial giants are going digital
                                    Links
                                      For this row’s sourcing, see the saved details, section context and linked research.
                                      Question by question · No date: look again when a condition is metWho funds the first disclosed River One warehouse facility after the Securitize acquisition, and what money moves?
                                      Badge
                                      Text
                                      Condition
                                      Sub
                                      Look again when the condition is met
                                      Text
                                      Securitize reported the acquisition completed November 17. The financing model describes stablecoin funding converted to fiat in a credit SPV and fiat draws and repayment by originators. The release names no completed funded facility.
                                      Look again when
                                      A filed agreement, company release or borrower/capital-provider record identifies the lender, borrower, vehicle, stablecoin or conversion route and funded draw.
                                      Last checked
                                      2026-11-17
                                      Studies
                                      Which companies actually run the new digital-money system?; Who actually controls the crypto infrastructure
                                      Links
                                        For this row’s sourcing, see the saved details, section context and linked research.
                                        Question by question · No date: look again when a condition is metWhat first shows off-hours BUIDL conversion and replenishment through the Securitize–Ethena facility?
                                        Badge
                                        Text
                                        Condition
                                        Sub
                                        Look again when the condition is met
                                        Text
                                        The November 12 launch specifies $25 million each of USDC and BUIDL initially and up to $50 million more subject to terms and availability.
                                        Look again when
                                        An operator or counterparty identifies an off-hours trade, replenishment, depletion, failure event or facility terms assigning stress liquidity responsibility.
                                        Last checked
                                        2026-11-17
                                        Studies
                                        Who actually controls the crypto infrastructure
                                        Links
                                          For this row’s sourcing, see the saved details, section context and linked research.