Skip to content

What is the library waiting on, and when is it due? — saved evidence, page 23

Saved evidence through 2026-11-23. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 441–460 of 638. Page 23 of 32.

Section context and qualifications
Uncertainty
  • A date is when to look again, not when something will happen. Several questions wait for a court, an agency or a filing on no fixed schedule.
  • This list covers the whole library, not only the federal government.
SectionRecordSaved detailsSources and dates
Question by question · No date: look again when a condition is metWhich named awards, appeal results, referrals or recoveries are tied to GSA’s review of the 689 former SBA 8(a) firms?
Badge
Text
Condition
Sub
Look again when the condition is met
Text
SBA says the 689 firms had been removed and classified inactive for 8(a) participation. GSA frames the referral as following suspensions. The $5.5 billion is contract ceiling. No public cohort roster, award-level disposition, referral or recovery was verified.
Look again when
Original suspension grounds, named contract-review result, OIG/DOJ referral, adjudication or joined obligation/outlay/recovery record appears.
Last checked
2026-11-16
Studies
What changed across government, October 18–22
Links
    For this row’s sourcing, see the saved details, section context and linked research.
    Question by question · No date: look again when a condition is metWhat exact incremental contract action, funding and accepted power-module work supports NASA SR-1?
    Badge
    Text
    Condition
    Sub
    Look again when the condition is met
    Text
    NASA program update names assigned work; incremental funded action and accepted operating capability remain unproved.
    Look again when
    Named modification/obligation, delivered component, test or NASA acceptance record appears.
    Last checked
    2026-10-22
    Studies
    What changed across government, October 18–22
    Links
      For this row’s sourcing, see the saved details, section context and linked research.
      Question by question · No date: look again when a condition is metDoes EXIM Titomic credit move from approval to executed financing, disbursement and accepted production equipment?
      Badge
      Text
      Condition
      Sub
      Look again when the condition is met
      Text
      October 21 release establishes$10.3m direct-loan approval; headline lending language does not prove cash paid or production.
      Look again when
      Executed financing, disbursement, equipment delivery/acceptance or actual cold-spray production/jobs record appears.
      Last checked
      2026-10-22
      Studies
      What changed across government, October 18–22
      Links
        For this row’s sourcing, see the saved details, section context and linked research.
        Question by question · No date: look again when a condition is metWhen were State OIG transition reports AUD-FM-27-02 and ISP-I-27-09 released, and what recommendation implementation follows?
        Badge
        Text
        Condition
        Sub
        Look again when the condition is met
        Text
        Both reports disclose October only. ICASS anticipated financing challenge and management disagreement preserved; resolved recommendations are not closed or demonstrated results.
        Look again when
        Exact release/archive clock or follow-up on ICASS financing, authority ownership, assistance-hub staffing and monitoring recommendations appears.
        Last checked
        2026-10-22
        Studies
        What changed across government, October 18–22
        Links
          For this row’s sourcing, see the saved details, section context and linked research.
          Question by question · No date: look again when a condition is metWhat is the actual DHS/CISA DeepSeek instrument, its scope, exceptions, deadlines and compliance record?
          Badge
          Text
          Condition
          Sub
          Look again when the condition is met
          Text
          October 19 chairman statement recovered; tracked primary source401. June BOD26-04 is unrelated and does not resolve this source gap.
          Look again when
          Exact signed/published directive or other controlling instrument and agency compliance evidence becomes reachable.
          Last checked
          2026-10-22
          Studies
          What changed across government, October 18–22
          Links
            For this row’s sourcing, see the saved details, section context and linked research.
            Question by question · No date: look again when a condition is metWhat governing letter, decision rights, funding and operating action stand behind the October 21 Agincourt roadmap?
            Badge
            Text
            Condition
            Sub
            Look again when the condition is met
            Text
            Exact native release remains403; its title/locator does not prove delegated authority, spending or a new command.
            Look again when
            Exact War release, letter/directive, command/authority instrument, acquisition/funding or implementation receipt becomes reachable.
            Last checked
            2026-10-22
            Studies
            What changed across government, October 18–22
            Links
              For this row’s sourcing, see the saved details, section context and linked research.
              Question by question · No date: look again when a condition is metWhat does the Florida ANG squadron memorandum actually order, and when is the unit activated and resourced?
              Badge
              Text
              Condition
              Sub
              Look again when the condition is met
              Text
              Exact native War source403; memorandum text, legal scope and unit activation remain distinct missing objects.
              Look again when
              Signed memorandum, force-structure/activation order, personnel/funding or operating receipt becomes reachable.
              Last checked
              2026-10-22
              Studies
              What changed across government, October 18–22
              Links
                For this row’s sourcing, see the saved details, section context and linked research.
                Question by question · No date: look again when a condition is metWhat are the actual terms and implementing awards of the October 22 F-35 framework?
                Badge
                Text
                Condition
                Sub
                Look again when the condition is met
                Text
                Date-only same-day title remains provisional; native War page403. No ten-year binding purchase, savings, obligation or delivery inferred.
                Look again when
                Controlling framework, signed procurement instrument or bounded award/obligation and accepted delivery record becomes reachable.
                Last checked
                2026-10-22
                Studies
                What changed across government, October 18–22
                Links
                  For this row’s sourcing, see the saved details, section context and linked research.
                  Question by question · No date: look again when a condition is metWhich current COD prison-education template/corrected instruction resolves the workbook’s conflicting year, column and encoding directions?
                  Badge
                  Text
                  Condition
                  Sub
                  Look again when the condition is met
                  Text
                  The complete 26-page workbook has visually confirmed conflicts in year codes, column references and encoding examples. The authenticated live template was not accessed; no corrected schema is inferred.
                  Look again when
                  Official corrected workbook/template or FSA clarification, with version/date and actual validation rules. Format acceptance does not establish factual student outcomes.
                  Last checked
                  2026-10-22
                  Studies
                  What changed across government, October 18–22
                  Links
                    For this row’s sourcing, see the saved details, section context and linked research.
                    Question by question · No date: look again when a condition is metWhat service/final-order, closing, customer-addendum and audit records establish Publicis–LiveRamp’s actual remedy lifecycle?
                    Badge
                    Text
                    Condition
                    Sub
                    Look again when the condition is met
                    Text
                    The issued October 19 interim OMA and proposed final DO are distinct. The agreement’s precise execution/service dates, closing, addenda and audit performance remain unverified.
                    Look again when
                    Served orders, final DO issuance, consummation notice, delivered customer addenda and actual independent audits/control findings, each under its own trigger.
                    Last checked
                    2026-10-22
                    Studies
                    What changed across government, October 18–22
                    Links
                      For this row’s sourcing, see the saved details, section context and linked research.
                      Question by question · No date: look again when a condition is metDoes EDGX file the required exchange/data-plan readiness confirmation and actually implement its overnight order changes?
                      Badge
                      Text
                      Condition
                      Sub
                      Look again when the condition is met
                      Text
                      The effective-on-filing amendment retains later operative dependencies: December 2026, industry readiness and another filing. No launch is proved.
                      Look again when
                      A later filing confirms EDGX and Equity Data Plans capability and industry readiness, followed by actual operation under the assigned-business-day and unpriced-order rules.
                      Last checked
                      2026-10-22
                      Studies
                      What changed across government, October 18–22
                      Links
                        For this row’s sourcing, see the saved details, section context and linked research.
                        Question by question · No date: look again when a condition is metWhat exact public decision, access model and operating record moves Fed standing repo into central clearing?
                        Badge
                        Text
                        Condition
                        Sub
                        Look again when the condition is met
                        Text
                        No approval, selected CCP/access model or production operation was located. September policy explanations and conventional October readiness evidence remain separate from central clearing. November1 post-maturity return strengthens the October20 exercise: the Oct21 H.4.1 shows exactly $67million of repo agreements, matching the accepted exercise amount and start date; Oct28 shows $6million, consistent with the exercise no longer being outstanding. This is aggregate start-leg corroboration and maturity consistency, not a matched BNY/dealer cash-return or CCP/novation receipt.
                        Look again when
                        A specific FOMC/New York direction or implementation notice; selected CCP and direct, sponsored, agent or special access; fees, margin/default resources and fallback; explicit novation testing, then live operation.
                        Last checked
                        2026-11-01
                        Studies
                        Fed Standing Repo Central Clearing Proposal; The Fed is many legal bodies, and its building cost doubled
                        Links
                          For this row’s sourcing, see the saved details, section context and linked research.
                          Question by question · No date: look again when a condition is metDoes Treasury adopt an excess-TGA-cash repo program, under what authority and design, and what first transaction and return are proved?
                          Badge
                          Text
                          Condition
                          Sub
                          Look again when the condition is met
                          Text
                          Existing 31 USC 323 supplies broad Treasury repo-investment authority. Targeted October 22 11:39 EDT access/risk return finds no named TGA borrower list, BNY appointment, FICC selection, admitted direct/sponsored/agent model or first trade. Existing BNY/FICC services establish possible mechanics only; Sponsored and Agent Clearing give different direct claims and CIL changes collateral control. DTCC October 20 combined ACS/CIL balances concern the broader transition, not TGA cash.
                          Look again when
                          Actual Treasury decision/delegation and approved borrower/allocation rules; BNY or other operator appointment and custody/control agreements; named CCP and direct/sponsored/agent status; margin, guarantees, indemnities, loss/liquidity obligations, fees and withdrawal/outage terms; first opening settlement, novation and returned cash. Check November 2/4 financing/policy/TBAC packet and section 323 reporting, without assuming a repo announcement.
                          Last checked
                          2026-10-22
                          Studies
                          Fed Standing Repo Central Clearing Proposal; The Fed is many legal bodies, and its building cost doubled
                          Links
                            For this row’s sourcing, see the saved details, section context and linked research.
                            Question by question · No date: look again when a condition is metWhich Sacramento parcels and buyers complete the H.R. 952 federal-interest purchase, for what value and with what later development?
                            Badge
                            Text
                            Condition
                            Sub
                            Look again when the condition is met
                            Text
                            Enacted paid release mechanism; no current title, exact statutory map, price or completed transaction recovered.
                            Look again when
                            Exact November 7, 2022 map; current title; eligible owner request/BLM receipt; appraisal, offer, payment and recorded conveyance.
                            Last checked
                            2026-10-22
                            Studies
                            Sacramento landowners can buy out an old federal railroad interest
                            Links
                              For this row’s sourcing, see the saved details, section context and linked research.
                              Question by question · No date: look again when a condition is metWhich projects receive petroleum DPA Title III selections, awards, obligations and financial instruments, and what refinery restart or accepted capacity results?
                              Badge
                              Text
                              Condition
                              Sub
                              Look again when the condition is met
                              Text
                              Presidential Determination 2026-11 supplies section 303 authority and DOE says up to $150 million is planned from a $1 billion energy-related appropriation. DOE says selection remains ongoing. No recipient, award, obligation or operating capacity is proved.
                              Look again when
                              A named selection, signed award/financial instrument, obligation, payment, facility work, refinery restart or accepted output record appears.
                              Last checked
                              2026-10-25
                              Studies
                              The military relies on commercial transport and plans for power during outages; What changed across government, October 22–25
                              Links
                                For this row’s sourcing, see the saved details, section context and linked research.
                                Question by question · No date: look again when a condition is metDid the West Hackberry exchange deliver crude to Phillips 66, support Lake Charles refinery operation and return the required premium barrels?
                                Badge
                                Text
                                Condition
                                Sub
                                Look again when the condition is met
                                Text
                                DOE authorized up to 400,000 barrels for immediate delivery to address a supply disruption at Phillips 66's Lake Charles refinery. The announcement does not prove physical delivery, refinery use or return.
                                Look again when
                                DOE/SPR, Phillips 66, contract, shipping or inventory records establish quantity delivered, accepted use, return schedule and actual premium-barrel return.
                                Last checked
                                2026-10-25
                                Studies
                                The military relies on commercial transport and plans for power during outages; What changed across government, October 22–25
                                Links
                                  For this row’s sourcing, see the saved details, section context and linked research.
                                  Question by question · No date: look again when a condition is metDo the Blue Moon and Starship test articles, Orion integration and three-launch Artemis III campaign pass their milestones, and which provider is selected for the first 2028 landing?
                                  Badge
                                  Text
                                  Condition
                                  Sub
                                  Look again when the condition is met
                                  Text
                                  NASA changed Artemis III into a 2027 LEO demonstration using Orion, Blue Moon Mark 2 and Starship Version 3 test articles. The first crewed landing is targeted for 2028 and the first provider is readiness-dependent rather than preassigned. No test or landing result exists yet.
                                  Look again when
                                  NASA or the providers publish the exact contract modifications, milestone acceptances, uncrewed demonstrations, launch/docking outcomes, certification or first-landing provider decision.
                                  Last checked
                                  2026-10-25
                                  Studies
                                  How Washington plans to turn science strategy into funded work; What changed across government, October 22–25
                                  Links
                                    For this row’s sourcing, see the saved details, section context and linked research.
                                    Question by question · No date: look again when a condition is metWhat legal arrangement, return source and withdrawal performance govern Ripple Treasury 24/7 Returns, and what balances actually participate?
                                    Badge
                                    Text
                                    Condition
                                    Sub
                                    Look again when the condition is met
                                    Text
                                    October 26: eligible wallet-held assets include RLUSD; return payer, contracts, rates, fees, withdrawal terms and actual participating balances were not disclosed in the reviewed announcement.
                                    Look again when
                                    Program terms, a named participant disclosure, or operating accounts identify the payer and issuer relationship, underlying investment or service, jurisdiction, fees, holding and withdrawal conditions, balances and completed cash access.
                                    Last checked
                                    2026-10-26
                                    Studies
                                    Could XRP quietly power currency conversions?
                                    Links
                                      For this row’s sourcing, see the saved details, section context and linked research.
                                      Question by question · No date: look again when a condition is metWhat actual RedCoin usage and subsequent HSBC distribution or investment functions become public?
                                      Badge
                                      Text
                                      Condition
                                      Sub
                                      Look again when the condition is met
                                      Text
                                      October 30 extension: issuer statement prepared October 30 gives October 28 circulation HK$83,201,441.58 and cash reserves HK$84,201,441.58. Targeted whitepaper/terms reading establishes a private bank-run EVM network and valid same-channel redemption within one business day. These are issuer balances and contractual terms, not independently attested reserves or measured uptake/redemption. PayMe rollout remains live; HK App, investment and wider use remain separate.
                                      Look again when
                                      HSBC publishes activated wallets, actual payments, reserve/redemption records or a dated HK App, investment or wholesale launch.
                                      Last checked
                                      2026-10-30
                                      Studies
                                      How 16 financial giants are going digital; Who actually controls the crypto infrastructure; International crypto rules, banks and payment systems
                                      Links
                                        For this row’s sourcing, see the saved details, section context and linked research.
                                        Question by question · No date: look again when a condition is metDid Standard Chartered complete the Zodia custody acquisition and the separate Zodia Solutions transfer?
                                        Badge
                                        Text
                                        Condition
                                        Sub
                                        Look again when the condition is met
                                        Text
                                        October 21 definitive agreements name Standard Chartered I H Limited and Zodia Custody Limited; approvals/closing and software separation remain future.
                                        Look again when
                                        A company closing release, regulatory approval or filing establishes completion, legal entities, share transfer and the separate software-services entity and contracts.
                                        Last checked
                                        2026-10-26
                                        Studies
                                        How 16 financial giants are going digital; Who actually controls the crypto infrastructure
                                        Links
                                          For this row’s sourcing, see the saved details, section context and linked research.