Skip to content

What is the library waiting on, and when is it due? — saved evidence, page 12

Saved evidence through 2026-11-23. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 221–240 of 638. Page 12 of 32.

Section context and qualifications
Uncertainty
  • A date is when to look again, not when something will happen. Several questions wait for a court, an agency or a filing on no fixed schedule.
  • This list covers the whole library, not only the federal government.
SectionRecordSaved detailsSources and dates
Question by question · LaterDoes HUD’s December 14 household eligibility rule take effect, what do courts order, and what actual verification, assistance or reporting consequences follow?
Badge
Text
Dated
Sub
Look again December 14, 2026
Text
Final rule published November 12; stated effective date December 14. M.P. v. Turner complaint filed November 16. No issued relief or post-effective household result established in the November 18 reading.
Look again when
An order in M.P. v. Turner, HUD correction or implementation notice, or actual program decision/report changes the state.
Last checked
2026-11-18
Studies
Justice Department opinion widens which state offices must report people unlawfully present
Links
    For this row’s sourcing, see the saved details, section context and linked research.
    Question by question · LaterWhat first operating evidence shows an accounting credential, judgment, report or correction moving through a complete authority-to-permission-to-reliance-to-revocation chain without losing its scope, owner or correction history?
    Badge
    Text
    Dated
    Sub
    Look again December 15, 2026
    Text
    The October 5 Accounting Permission Constitution maps the governing architecture and representative current, proposed and future-effective gates. The November 4 private-to-public conversion return adds a concrete reliance transition: an S-1 can change PBE accounting status, Regulation S-X presentation, eligible audit signer, SEC/PCAOB independence, evidence and public reliance while later ICFR attestation retains a separate clock. U.S. GAAP may remain the base, but private-company alternatives may require retrospective removal; an AICPA report cannot merely be relabeled as a PCAOB report. No representative issuer case yet supplies the complete recast, audit-procedure, independence-remediation, time, cost, public-reliance and correction chain, and no universal correction or revocation event propagates across all dependent systems.
    Look again when
    Return when revised PCAOB AS 2901 and QC 1000 become effective, or earlier on a final SEC CPA accredited-investor order, final transfer-agent rule, AICPA Profession Ready exposure draft, named AI/material-accounting correction case, auditor-independence action involving system design, a named IPO conversion with recasts/procedure changes/time/cost, or a complete private-company credential/issuance/record/settlement/books/assurance/correction receipt.
    Last checked
    2026-11-04
    Studies
    Accounting built from shared business events; How real-time shared records could change auditing; SEC may count a CPA license toward accredited-investor status; What makes a record official on a blockchain; SEC proposes blockchain-based official shareholder records
    Links
      For this row’s sourcing, see the saved details, section context and linked research.
      Question by question · LaterRead the agenda, replay, written submissions and any later rule or venue action.
      Badge
      Text
      Dated
      Sub
      Look again December 15, 2026
      Text
      CFTC announces a December 15 industry roundtable addressing overnight trading, tokenization, staffing, infrastructure and operational readiness, building on its earlier comment request. Agenda and speakers will follow. Discussion is not a rule, permission for every venue, changed settlement hours or evidence that 24/7 markets operated.
      Look again when
      Read the agenda, replay, written submissions and any later rule or venue action.
      Last checked
      2026-10-30
      Studies
      The Fed is many legal bodies, and its building cost doubled
      Links
        For this row’s sourcing, see the saved details, section context and linked research.
        Question by question · LaterWhat did the December 14–15 U.S. G20 Leaders' Summit adopt, omit, delegate and hand forward?
        Badge
        Text
        Dated
        Sub
        Look again December 16, 2026
        Text
        The U.S. presidency portal now explicitly names four core working groups and three themes. Selected innovation, energy, trade and finance outputs are held through the October 28 return; leaders’ agreement and annexes remain future for December 14–15, following Sherpa Meeting IV December 10–12. Host participant categories are not proof of future attendance or an independently resolved membership change.
        Look again when
        First research-return day after the scheduled December 14–15 leaders' summit; not asserted as an official publication date. Look for: Retrieve the declaration/chair object, participant and consensus state, annexes, named implementers, omitted/carried workstreams, next presidency handoff and exact future clocks.
        Last checked
        2026-10-28
        Studies
        How G7 and G20 presidencies steer international priorities
        Links
          For this row’s sourcing, see the saved details, section context and linked research.
          Question by question · LaterWhat did FASAB decide on hierarchy and intangible/software drafts at its October20–21 meeting?
          Badge
          Text
          Dated
          Sub
          Look again December 17, 2026
          Text
          November 18: all 32 hierarchy and 62 software briefing pages read. October approved minutes remain unlinked in the directly inspected official archive. The November 16 annual report retains continuing project states; no issued hierarchy/software exposure draft or final Statement was located. Current meeting archive lists December 16.
          Look again when
          Return earlier on approved October minutes, a specific Board disposition or an issued public exposure draft. After the currently listed December 16 meeting, distinguish occurrence, approved minutes, exposure and issuance.
          Last checked
          2026-11-18
          Studies
          Federal advisory committees and other public decision forums
          Links
            For this row’s sourcing, see the saved details, section context and linked research.
            Question by question · LaterDoes the November 17 ACRS direct final rule take effect, change after adverse comments, or get withdrawn?
            Badge
            Text
            Dated
            Sub
            Look again December 17, 2026
            Text
            NRC published a direct final rule with December 17 comments and February 1, 2027 conditional effectiveness.
            Look again when
            Adverse-comment disposition, withdrawal/confirmation and February 1 effectiveness.
            Last checked
            2026-11-19
            Studies
            The nuclear infrastructure buildout; How Washington plans to turn science strategy into funded work
            Links
              For this row’s sourcing, see the saved details, section context and linked research.
              Question by question · LaterDid DNI deliver the midterm foreign-interference assessment and did DOJ and DHS issue the material-effect report?
              Badge
              Text
              Dated
              Sub
              Look again December 18, 2026
              Text
              The Pentagon announced foreign-threat cyber and intelligence tasking. No 2026 after-action report or completed EO 13848 assessment was recovered. December 18 is the working first date if November 3 is the election’s conclusion date.
              Look again when
              Public assessment, acknowledged delivery, official operational after-action report, or subsequent Attorney General and DHS material-effect report.
              Last checked
              2026-11-16
              Studies
              White House election files show real risks, not proof of changed results
              Links
                For this row’s sourcing, see the saved details, section context and linked research.
                Question by question · LaterWhat first authoritative objects move either ARK's Exchange Class or Tokenized Class from exemptive permission into effective registration, venue admission, issuance, trading, settlement, accounting reconciliation and repeated operation?
                Badge
                Text
                Dated
                Sub
                Look again December 19, 2026
                Text
                ARK’s November 19 Form 486BXT (Post-Effective Amendment No. 13) moves the Class X registration amendment’s designated effective date from November 21 to December 19, 2026. The filing establishes a revised registration clock, not exchange admission, issuance, trade or settlement. The existing separately dated Securitize statement concerning tokenized ARKVX interests does not become an operating receipt from this Class X filing.
                Look again when
                Return earlier if ARK files a Tokenized Class registration statement or names its DLT, transfer-agent, wallet, ATS, cash or custody stack; if TXSE admits Class X or publishes a launch notice; or if an official filing, venue record, chain record, financial statement or auditor report evidences issuance, trade, settlement, repurchase, reconciliation or repeated operation.
                Last checked
                2026-11-21
                Studies
                SEC may count a CPA license toward accredited-investor status; Accounting built from shared business events; Which companies connect the new private money system; Who actually controls the crypto infrastructure
                Links
                  For this row’s sourcing, see the saved details, section context and linked research.
                  Question by question · LaterWhat replaces the Lukoil 131L negotiation permission, and is any separately authorized sale performed before the distinct maintenance deadline?
                  Badge
                  Text
                  Dated
                  Sub
                  Look again December 19, 2026
                  Text
                  OFAC issued Russia-related General License 131L November 19, replacing 131K in full effective that date. It authorizes specified negotiations and entry into contingent contracts involving Lukoil International GmbH and its 50%-or-more-owned entities through 12:01 a.m. EST December 19, 2026. Contract performance expressly requires separate OFAC authorization. Specified maintenance and wind-down activity is authorized through 12:01 a.m. EST February 20, 2027; blocked accounts may be used for that bounded activity. The license excludes funds transfers to persons or accounts in Russia and preserves other restrictions.
                  Look again when
                  **Next receipt:** separate performance authorization, an executed closing and its actual cash/ownership record. The negotiation and maintenance deadlines require separate follow-through. Reading: complete two-page license; no prospective purchaser or transaction census.
                  Last checked
                  2026-11-21
                  Studies
                  U.S.–Russia ties run through many thin channels, not one relationship
                  Links
                    For this row’s sourcing, see the saved details, section context and linked research.
                    Question by question · LaterWhat tariff compliance, audit and demand/capacity records follow the NIPSCO affiliate-sale authorization?
                    Badge
                    Text
                    Dated
                    Sub
                    Look again December 19, 2026
                    Text
                    FERC's November 19 order in ER26-3474-000 and ER26-3475-000 authorizes NiSource Generation Company LLC to sell energy and capacity at market-based rates to NIPSCO under two PPAs associated with Amazon and Alphabet data-center loads. Authorization is effective on issuance. The Commission found the specific settlement and PPA protections sufficient for its affiliate-sale review, including separation of relevant costs and MISO transactions. Applicants must preserve audit records, report material factual changes within 30 days, and revise the tariff's authorization language within 30 days.
                    Look again when
                    **Next receipt:** compliance tariff, annual demand/capacity reports, actual service and costs, or a default/cost-recovery record. Reading: selected background and complete substantive determination/order provisions; not a full state-commission docket review.
                    Last checked
                    2026-11-21
                    Studies
                    No federal data-center ban, just scattered permits and leases
                    Links
                      For this row’s sourcing, see the saved details, section context and linked research.
                      Question by question · LaterWhat actual post-processing compliance approach follows TIGTA 2027-300-001, and what separately evidenced account or cash outcomes result?
                      Badge
                      Text
                      Dated
                      Sub
                      Look again December 21, 2026
                      Text
                      The historical October 15 report has four recommendations despite its index saying none. IRS agrees to a compliance approach due December 21; the other responses retain disagreements and completed-guidance representations. No completed plan or recovery is proved.
                      Look again when
                      IRS plan/treatment record implementing agreed recommendation 4; distinguish assessed tax, corrected accounts and collected cash from questioned deductions and potential-tax estimates.
                      Last checked
                      2026-10-22
                      Studies
                      What changed across government, October 18–22
                      Links
                        For this row’s sourcing, see the saved details, section context and linked research.
                        Question by question · LaterHow does BCBS finalise the consequential Basel Framework amendments and Application-guidance migrations after the December 21 consultation, and what does it say about RCAP or national use of the moved material?
                        Badge
                        Text
                        Dated
                        Sub
                        Look again December 22, 2026
                        Text
                        On November 5, 2026 BCBS finalised the 13-module consolidated-guidance text without changing the February draft. It separately proposed consequential cross-reference amendments and moving CAP99, CRE99, LCR99, NSF99, MAR99, SRP98 and SRP99 content into the guidance library, with selected obsolete or duplicative material deleted. Standards are subject to RCAP while guidelines are not; the current RCAP Handbook nevertheless expressly includes MAR99 in RCAP-RWA, making its proposed move to MIR10 a concrete unresolved assessment-perimeter case. Comments close December 21. No final amendment, revised Handbook, tracked Basel calibration change, national implementation change or bank operating result was established.
                        Look again when
                        Return when BCBS publishes the final technical amendments, response overview or implementation notice; earlier only for a BCBS RCAP-method statement or national authority action that expressly changes how the proposed migrated material is assessed, adopted or enforced.
                        Last checked
                        2026-11-05
                        Studies
                        The FSB ties Basel, market infrastructure and digital finance together
                        Links
                          For this row’s sourcing, see the saved details, section context and linked research.
                          Question by question · LaterDid CISA begin its service review and publish the promised implementation, metrics and progress records?
                          Badge
                          Text
                          Dated
                          Sub
                          Look again December 25, 2026
                          Text
                          CISA publishes CISA 2030: Defend, Harden, Prevail, with cyber defense, prioritized infrastructure protection and resilience pillars. It reaffirms its delegated national-security/emergency-communications initiation and restoration role and names 60-, 180- and 365-day tasks. Strategy publication is not a new statutory parent/mission transfer, completed disruption, hardened asset or restored communication. The review begins within 60 days; it is not promised complete by that date.
                          Look again when
                          Service-review initiation, implementation and measurement plan, first progress report and independently observed results.
                          Last checked
                          2026-10-30
                          Studies
                          Who owns and activates federal emergency communications
                          Links
                            For this row’s sourcing, see the saved details, section context and linked research.
                            Question by question · LaterWhich health-IT certification changes become operative, and which named developers or systems actually change under the adopted text?
                            Badge
                            Text
                            Dated
                            Sub
                            Look again December 28, 2026
                            Text
                            HHS finalizes removal of 14 certification criteria and revision of seven, retaining 39 unchanged. It removes the specified decision-support model-card source-attribute support/access provisions, narrows real-world-testing and Insights requirements, and removes ASTP references from part 172. The rule describes future FHIR-based API priorities and possible MCP/AI combinations. Only this narrowed final set is adopted. Future API ambitions do not establish a deployed agent, MCP mandate, interoperable clinical workflow, patient benefit or elimination of all privacy/security duties.
                            Look again when
                            Provision-specific effective dates, updated certification testing and named system migration or independent outcomes.
                            Last checked
                            2026-10-30
                            Studies
                            DOJ built a case-routing node for the White House super-intelligence push
                            Links
                              For this row’s sourcing, see the saved details, section context and linked research.
                              Question by question · LaterWhat legally effective service and template date replace the postponed AnnounceDirect launch?
                              Badge
                              Text
                              Dated
                              Sub
                              Look again December 28, 2026
                              Text
                              On November 12 SEC opened comments on Partial Amendment No. 1 and moved its AnnounceDirect action deadline from November 13 to December 28, 2026. DTC filed the amendment on Nov. 6. The first phase is proposed no later than March 31, 2027; no new template or launch took effect.
                              Look again when
                              SEC action, then a DTC Important Notice at least 14 days before implementation and named agent use.
                              Last checked
                              2026-11-16
                              Studies
                              The Fed is many legal bodies, and its building cost doubled
                              Links
                                For this row’s sourcing, see the saved details, section context and linked research.
                                Question by question · LaterDid DA&M formalize and charter ORA, allocate initial billets and route permanent manning into budget and FYDP requests, and did each military department submit its comprehensive unfunded and underfunded religious-affairs requirements report?
                                Badge
                                Text
                                Dated
                                Sub
                                Look again December 29, 2026
                                Text
                                As of September 30, 2026, the signed memorandum directed DA&M to formalize ORA, integrate authorities, draft a chartering directive within 90 days, identify an appropriate initial allocation of SES, civilian and military billets, and coordinate permanent manning into budget and FYDP requests. It separately directed the military-department secretaries, coordinated with their chiefs of chaplains, to submit comprehensive baseline reports of all unfunded and underfunded religious-affairs requirements within 90 days. No issued charter, organization record, billet allocation, filled staff, permanent manning request, service report, accepted priority, funded program or delivery receipt was public at the cutoff.
                                Look again when
                                Return earlier on a named Director; issued ORA policy; charter, organization chart or billet record; service requirements submission; spiritual-readiness research or assessment tool; family-support rule; contract; complaint; audit; congressional record; or litigation. Otherwise return on the calculated 90-day date and verify the Department's counting convention and each required object's actual state.
                                Last checked
                                2026-09-30
                                Studies
                                A new religious-affairs office reporting directly to the Secretary
                                Links
                                  For this row’s sourcing, see the saved details, section context and linked research.
                                  Question by question · LaterDid the Board convert the OIG's Eccles-1951 corrective directions into a signed guaranteed maximum price, independently validated cost record, fixed cost and schedule controls, contract recovery, or a reconciled construction-in-process and placed-in-service asset record?
                                  Badge
                                  Text
                                  Dated
                                  Sub
                                  Look again December 31, 2026
                                  Text
                                  As of September 30, 2026, Chairman Kevin Warsh had concurred with all seven OIG recommendations, assigned GSA as Project Executive, directed an independent audit of awarded costs, ordered prompt GMP negotiations and fixed cost and schedule metrics, and committed to review contracts for reimbursement or credits. The Board's audited statements report aggregate construction in process of $1,239,980,443 at year-end 2025, up from $721,702,038 at year-end 2024, but do not publish the underlying project, vendor, cost-code or fixed-asset subsidiary ledger. No signed project-level GMP, completed independent cost audit, vendor-level validation, recovered dollar, placed-in-service reconciliation, final construction receipt or OIG recommendation closure was established.
                                  Look again when
                                  Return earlier when the Board, OIG or GSA publishes a signed GMP or other enforceable ceiling; names or completes the independent cost audit; discloses project/vendor/cost-code testing or a construction-in-process reconciliation; reports fixed budget and schedule baselines; discloses reimbursement, credits or another contract remedy; transfers material costs into placed-in-service asset classes; updates the expected December 2027 completion; or closes any of the seven recommendations. Also inspect the Board's 2026 audited financial statements for the next construction-in-process, capital-expenditure, accrual, retainage and depreciation state.
                                  Last checked
                                  2026-09-30
                                  Studies
                                  The Fed is many legal bodies, and its building cost doubled
                                  Links
                                    For this row’s sourcing, see the saved details, section context and linked research.
                                    Question by question · LaterAre SSA's Digital Identity Verification controls complete, is there a usable remedy, and what happens to the ID.me rail after its award end?
                                    Badge
                                    Text
                                    Dated
                                    Sub
                                    Look again December 31, 2026
                                    Text
                                    The inventory declaration is not the impact, test, monitoring, review, training, privacy or remedy evidence. Do not assume: that the system is proven safe, has no identity data, offers adequate remedy or has a current post-2026 supplier.
                                    Look again when
                                    The current ID.me award end arrives while the control return remains open. Look for: Completed control records and remedy disclosure appear together with renewal, replacement or retirement evidence.
                                    Last checked
                                    2026-08-23
                                    Studies
                                    DOJ built a case-routing node for the White House super-intelligence push
                                    Links
                                      For this row’s sourcing, see the saved details, section context and linked research.
                                      Question by question · LaterDoes a persistent identifier join federal obligation, certification, Treasury payment, settlement, recipient receipt, correction and recovery?
                                      Badge
                                      Text
                                      Dated
                                      Sub
                                      Look again December 31, 2026
                                      Text
                                      Through October 10, 2026, a seven-route federal-flow comparison confirms that the first outside recipient and cash gate differ across state HOME grants, Medicaid matching, highway reimbursement, direct local/nonprofit grants, contracts, benefits and credit. The public record can identify an April 17, 2025 federal child-care payment of $37,065,525.14 and join it to the federal award, recipient, assistance listing and federal account. No located public identifier carries that payment through Pennsylvania receipt, State accounting, allocation, provider payment, correction and recovery. A structural map is not an authoritative end-to-end transaction record.
                                      Look again when
                                      Return earlier when an authoritative event spine becomes operational. Look for a persistent ID with typed reversal and recovery events, public correction lineage, downstream flow-down and protected-data integrity proof. Otherwise include this item in the December 31 Public Power batch review.
                                      Last checked
                                      2026-10-10
                                      Studies
                                      No public record yet follows a federal dollar all the way down; One $37 million child-care payment can be traced into Pennsylvania, but not to providers; Accounting built from shared business events; Which companies connect the new private money system
                                      Links
                                        For this row’s sourcing, see the saved details, section context and linked research.
                                        Question by question · LaterDid the G7 publish its other-mineral dependency targets, recycling targets, Alliance review, traceability expansion and a project/stockpile implementation record by year-end?
                                        Badge
                                        Text
                                        Dated
                                        Sub
                                        Look again December 31, 2026
                                        Text
                                        The rare-earth/permanent-magnet target and non-binding Alliance exist; other-mineral/recycling targets, first public Alliance product, common stockpile constitution and project-stage ledger were absent. Do not assume: Do not call dependency targets quotas, the 195 projects funded/operating, or the stockpile agenda an operating reserve.
                                        Look again when
                                        End of the French G7 presidency and stated year-end target window. Look for: Retrieve exact targets and denominators, Alliance roster/work product/review, five-mineral traceability expansion, stockpile title/release constitution and project-level finance/build/qualification/output states.
                                        Last checked
                                        2026-08-31
                                        Studies
                                        How G7 and G20 presidencies steer international priorities; U.S. is making rare-earth magnets again, but China still runs the chain
                                        Links
                                          For this row’s sourcing, see the saved details, section context and linked research.