Who is where, and how far along? — saved evidence, page 125
Saved evidence through Not stated. This table projects the linked graphic data; it does not refresh the underlying research.
Return to the graphic · Complete saved JSON
Rows 2481–2500 of 2960. Page 125 of 149.
Section context and qualifications
- Uncertainty
| Section | Record | Saved details | Sources and dates |
|---|---|---|---|
| Timeline | P-COOL certificate-less transaction flow: The IOTA Core team's main focus for the next quarter, with stress testing on public networks expected then. |
| |
| Timeline | TWIN trade finance and payments on IOTA L1: IOTA and TWIN report development work on trade-finance and payments capabilities that will use IOTA L1, 'with more to share soon'; separately, TWIN document extraction now aligns with UN/CEFACT and platform releases cut consignment and document data latency by about 70%. |
| |
| Timeline | Coinbase Global, Inc.: Q3 2026 results scheduled for Oct 29, 2026, after market close. |
| |
| Timeline | DriveWealth: DriveWealth is integrating Ripple stablecoin infrastructure (RLUSD on the XRP Ledger with Ripple mint and burn) for settlement in Europe first, Ripple Payments for cross-border funding, and Ripple support for its European digital-asset custody; equity financing through Ripple Prime's Delta One business is being explored. |
| |
| Timeline | Evernorth Holdings Inc. (Nasdaq: XRPN) treasury deployment with Ripple, Kraken, Coinbase and BitGo: Evernorth, now public and holding about 473 million XRP, named Ripple, Kraken, Coinbase and BitGo as initial institutional execution partners, with deployment of treasury XRP to begin in Q4 2026 through off-ledger counterparties; a second phase would put capital into XRPL-native lending once validators activate it. |
| |
| Timeline | Meritz Securities: Meritz Securities and Ripple will explore bringing Ripple Custody and Ripple tokenization infrastructure into Korea's capital markets, starting within Meritz's existing licensed securities business and widening in stages as Korean rules develop. |
| |
| Timeline | Geo-aware leader schedule (SIMD-0675): Proposal to reorder the leader schedule so consecutive leaders are geographically closer, reducing handoff latency. |
| |
| Timeline | Cross River Bank: Cross River is embedding RLUSD on the XRP Ledger into its core banking system so fintech and business clients can convert between dollars and RLUSD and use it alongside ACH, wires and real-time payments through one API. |
| |
| Timeline | Mastercard (owns BVNK): BVNK acquisition and Mastercard Global Money Platform launched |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Timeline | Ripple Prime real-world-asset (RWA) perpetual swaps: Ripple Prime launched support for RWA perpetual swaps on 100+ reference markets (equities, indices, ETFs, metals, energy, FX), traded 24/7 with Ripple Prime as principal; Virtu is named as already trading; RLUSD can be posted as collateral where available. |
| |
| Timeline | Consensus node release v0.78.1 on mainnet (CLPR code behind a feature flag): v0.78.0 reached testnet Oct 8 and v0.78.1 mainnet Oct 16, 2026; the release adds Cross-Ledger Protocol (CLPR) code behind a feature flag, doubles the topic limit to 2,000,000 and changes block-node handling. |
| |
| Timeline | DTC Tokenization Service: DTCC's live-production page still says 'expected October 2026 launch'; no DTCC launch announcement was found. |
| |
| Timeline | JPM Coin (JPMD) deposit token on Ethereum: J.P. Morgan says JPM Coin, its U.S.-dollar deposit token for institutional clients, is now available on Ethereum in addition to Base, supporting peer-to-peer transfers between institutional clients across Ethereum-compatible networks. |
| |
| Timeline | J.P. Morgan (Kinexys) - JPM Coin (JPMD) deposit token on Ethereum mainnet: J.P. Morgan says its USD deposit token JPM Coin (JPMD), already on Base, is now live on Ethereum mainnet for J.P. Morgan institutional clients, for peer-to-peer transfers between those clients. |
| |
| Timeline | Kinexys by J.P. Morgan: JPM Coin (JPMD) live on Ethereum for J.P. Morgan's institutional clients. |
| |
| Timeline | Thunes (Direct Global Network): Coinbase 'will integrate' Thunes' Direct Global Network so stablecoin flows can pay out to local bank accounts and mobile wallets (supplier payments, gig payouts, remittances), and Coinbase will supply stablecoin services to Thunes. |
| |
| Timeline | Coinbase Ireland Limited: CBI and Coinbase Ireland agreed admitted safeguarding/outsourcing contraventions and a discounted €3,252,618 sanction, subject to High Court confirmation; no realized consumer detriment established by the notice. |
| |
| Timeline | Alpenglow Votor mainnet cutover: Solana reports consensus switched after genesis slot 459652999 in epoch 1064; official read-only RPC corroborated that genesis slot on October 26. |
| |
| Timeline | Alpenglow Votor: Consensus replacement active in epoch 1064; current endpoint corroborates genesis slot. |
| For this row’s sourcing, see the saved details, section context and linked research. |
| Timeline | Hoodi Glamsterdam postponed: October 26 Hoodi activation and 200M gas-limit schedule removed; replacement date unset. |
|