{"schema":"f250.research-relevance-card/v1","id":"study:us-inbound-investment-industrial-capex","research_id":"us-inbound-investment-industrial-capex","title":"What's really inside the 'trillions coming in' investment claims","summary":"The administration's $18–20 trillion investment total is not a pile of construction money. It mixes multi-year company spending plans, foreign-government frameworks, trade and purchase figures and some real projects, and each step from announcement to operation is separate.","summary_scope":"Exact current published study description.","summary_evidence_through":"2026-07-31","summary_source":"/library/data/search.json","summary_source_sha256":"bf2a1707c8c22307fd34bf6b510149a2b8f743f54a1c954b4d49deb40e4587f6","source_record_id":"us-inbound-investment-industrial-capex","study_evidence_through":"2026-07-31","human_study":"/library/studies/us-inbound-investment-industrial-capex/index.html","directory":"/library/bot/studies/us-inbound-investment-industrial-capex/index.json","subject_ids":["buildout","world"],"human_url":"/library/summaries/us-inbound-investment-industrial-capex.html","json_url":"/library/bot/summaries/us-inbound-investment-industrial-capex.json","clock_rule":"The package cutoff, each selected document date, original source dates and this publication date remain separate. A relevance card is an entrance to the full records.","depth":{"selected_readings":5,"saved_documents":54,"graphics":1,"saved_collection":null},"recommended_readings":[{"title":"U.S. Inbound Investment and Industrial-Capex Funding Map — 2025–2026","role":"reading_guide","role_label":"Overview and reading guide","study_link_label":"Overview and reading guide","record_url":"/library/bot/records/3ee36f2909f3321d9148.json","human_url":"/library/readings/40693afbfde2d61594ea.html"},{"title":"CoreWeave and IREN: later borrowing, equipment and service states","role":"analysis","role_label":"Saved research analysis","study_link_label":"CoreWeave and IREN: later borrowing, equipment and service states","record_url":"/library/bot/records/1bedd286509002605c9d.json","human_url":"/library/readings/19307efcb48acb55d38f.html"},{"title":"Meta’s Richland Parish campus power and financing","role":"analysis","role_label":"Saved research analysis","study_link_label":"Meta’s Richland Parish campus power and financing","record_url":"/library/bot/records/3e14c4f8dfa999d2599d.json","human_url":"/library/readings/3a134604203b993fe8bc.html"},{"title":"Thacker Pass Phase 1 construction costs, funding and progress","role":"analysis","role_label":"Saved research analysis","study_link_label":"Thacker Pass Phase 1 construction costs, funding and progress","record_url":"/library/bot/records/53d5c46715df4d92dc23.json","human_url":"/library/readings/79a3de29a1d7a7c1624e.html"},{"title":"Intel's amended CHIPS completion test","role":"analysis","role_label":"Saved research analysis","study_link_label":"Intel's amended CHIPS completion test","record_url":"/library/bot/records/a46ae7e7eef77462cc7c.json","human_url":"/library/readings/a25cf84775177d2676dd.html"}],"recent_linked_readings_index":"/library/bot/summaries/linked/us-inbound-investment-industrial-capex/1.json","recent_linked_readings_count":0,"recent_linked_readings":[],"recommended_readings_complete":true}