{"schema":"f250.research-relevance-card/v1","id":"study:ai-turbine-asset-management-power-buildout","research_id":"ai-turbine-asset-management-power-buildout","title":"AI helps run turbines, but people still make the big calls","summary":"Turbines are run by layers of sensors, controls, monitoring centers, analytics and work-order systems. AI does narrow jobs now, such as inspection, spotting problems and small tuning loops, but no fleet is run by AI, and most newly ordered big gas turbines won't run until 2027 or later.","summary_scope":"Exact current published study description.","summary_evidence_through":"2026-08-09","summary_source":"/library/data/search.json","summary_source_sha256":"bf2a1707c8c22307fd34bf6b510149a2b8f743f54a1c954b4d49deb40e4587f6","source_record_id":"ai-turbine-asset-management-power-buildout","study_evidence_through":"2026-08-09","human_study":"/library/studies/ai-turbine-asset-management-power-buildout/index.html","directory":"/library/bot/studies/ai-turbine-asset-management-power-buildout/index.json","subject_ids":["buildout"],"human_url":"/library/summaries/ai-turbine-asset-management-power-buildout.html","json_url":"/library/bot/summaries/ai-turbine-asset-management-power-buildout.json","clock_rule":"The package cutoff, each selected document date, original source dates and this publication date remain separate. A relevance card is an entrance to the full records.","depth":{"selected_readings":3,"saved_documents":8,"graphics":1,"saved_collection":null},"recommended_readings":[{"title":"Turbine Asset Management and U.S. Buildout — Source Document","role":"analysis","role_label":"Saved research analysis","study_link_label":"Read the current study →","record_url":"/library/bot/records/d6488aa12aad00677016.json","human_url":"/library/readings/e5c282df8343c34b9569.html"},{"title":"Power for compute and the older operating-data layer","role":"analysis","role_label":"Saved research analysis","study_link_label":"Power for compute and the older operating-data layer","record_url":"/library/bot/records/244f9b1dc593972bda2c.json","human_url":"/library/readings/b5bf2944f79ac5fbd582.html"},{"title":"Offshore wind after the stop-work orders — first power and commercial operation","role":"analysis","role_label":"Saved research analysis","study_link_label":"Offshore wind after the stop-work orders — first power and commercial operation","record_url":"/library/bot/records/9b1e1e4ecccbe990e0a4.json","human_url":"/library/readings/04daad8d9324939217d2.html"}],"recent_linked_readings_index":"/library/bot/summaries/linked/ai-turbine-asset-management-power-buildout/1.json","recent_linked_readings_count":0,"recent_linked_readings":[],"recommended_readings_complete":true}