Skip to content

Saved post — complete reading

Part 1 of 1. The text below preserves the complete saved reading across its parts.

# SpaceX and Tesla are each building 100GW year of

Author: @elonmusk
Original post: https://x.com/elonmusk/status/2093794565274669068
Recorded date: 2026-08-29
Plotline: Technology/AI
Secondary plotlines: Energy
Recorded clock: {"basis":"source_post_time_encoded_in_utc_filename","exact_local":"2026-08-29T16:14:00-04:00","exact_utc":"2026-08-29T20:14:00Z","nominal_date":"2026-08-29","precision":"exact"}

## Saved post

SpaceX and Tesla are each building 100GW/year of solar production capacity as fast as possible, but natural gas will still be needed to supplement and bootstrap solar for several years. 

The limiting factor for nat gas turbine production is casting the blades & vanes. By doing in-house casting at SpaceX, we can accelerate nat gas turbines coming online by up to 18 months, which is a profound game-changer.

## In reply to

@TeslaBoomerMama
Full article for my subscribers

Complete-text SHA-256: 32cee6f4eca63ab41b2d1ba9732b3ba01ed6997b2fd4a9a6f58b837a07c9ee61

End of this result set.

JSON alternative · Plain text alternative

Last published 2026-11-25T19:31:08.717Z. Post dates and paper edition dates are shown separately. Bot reading directory