{"schema":"f250.graphic-model/v1","infographic_id":"infographic:science-bfee1ea2f776","title":"National Security Science and Technology Strategy: from program to acceptance","source":{"scope":"workbench","path":"Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/outputs/NSSTS Program to Acceptance Overview.html","sha256":"547bdea2aee799d833d934082c3223e60942459d3ddf1aaf7abfb80ab97e8755"},"evidence_cutoff":"2026-08-19","research_owner_ids":["nssts-technology-company-map"],"static_document":[{"tag":"html","attrs":{},"event":"open"},{"tag":"head","attrs":{},"event":"open"},{"tag":"title","attrs":{},"event":"open"},{"text":"National Security Science and Technology Strategy: from program to acceptance"},{"tag":"title","event":"close"},{"tag":"head","event":"close"},{"tag":"body","attrs":{},"event":"open"},{"tag":"header","attrs":{"class":"plain-english-standalone"},"event":"open"},{"tag":"p","attrs":{"class":"plain-english-kicker"},"event":"open"},{"text":"In plain English"},{"tag":"p","event":"close"},{"tag":"h1","attrs":{},"event":"open"},{"text":"National Security Science and Technology Strategy: from program to acceptance"},{"tag":"h1","event":"close"},{"tag":"p","attrs":{"class":"plain-english-summary"},"event":"open"},{"text":"How a program becomes working capability."},{"tag":"p","event":"close"},{"tag":"header","event":"close"},{"tag":"body","event":"close"},{"tag":"html","event":"close"},{"tag":"html","attrs":{},"event":"open"},{"tag":"head","attrs":{},"event":"open"},{"tag":"title","attrs":{},"event":"open"},{"text":"Nssts Program To Acceptance"},{"tag":"title","event":"close"},{"tag":"head","event":"close"},{"tag":"body","attrs":{},"event":"open"},{"tag":"section","attrs":{"id":"nssts-program-funnel"},"event":"open"},{"tag":"h2","attrs":{"id":"nssts-program-title"},"event":"open"},{"text":"The program becomes the controlling object"},{"tag":"h2","event":"close"},{"tag":"div","attrs":{"class":"program-picks","id":"p5-picks","aria-label":"Choose a priority program"},"event":"open"},{"tag":"div","event":"close"},{"tag":"div","attrs":{"class":"funnel"},"event":"open"},{"tag":"div","attrs":{"class":"stage"},"event":"open"},{"tag":"div","attrs":{"class":"stage-label text-small"},"event":"open"},{"text":"Federal demand"},{"tag":"div","event":"close"},{"tag":"strong","attrs":{"id":"p5-program"},"event":"open"},{"tag":"strong","event":"close"},{"tag":"span","attrs":{"id":"p5-state"},"event":"open"},{"tag":"span","event":"close"},{"tag":"div","event":"close"},{"tag":"div","attrs":{"class":"arrow"},"event":"open"},{"text":"›"},{"tag":"div","event":"close"},{"tag":"div","attrs":{"class":"stage"},"event":"open"},{"tag":"div","attrs":{"class":"stage-label text-small"},"event":"open"},{"text":"Company field"},{"tag":"div","event":"close"},{"tag":"strong","attrs":{"id":"p5-companies"},"event":"open"},{"tag":"strong","event":"close"},{"tag":"span","attrs":{"id":"p5-position"},"event":"open"},{"tag":"span","event":"close"},{"tag":"div","event":"close"},{"tag":"div","attrs":{"class":"arrow"},"event":"open"},{"text":"›"},{"tag":"div","event":"close"},{"tag":"div","attrs":{"class":"stage"},"event":"open"},{"tag":"div","attrs":{"class":"stage-label text-small"},"event":"open"},{"text":"Facility join"},{"tag":"div","event":"close"},{"tag":"strong","attrs":{"id":"p5-facility"},"event":"open"},{"tag":"strong","event":"close"},{"tag":"span","attrs":{"id":"p5-facility-state"},"event":"open"},{"tag":"span","event":"close"},{"tag":"div","event":"close"},{"tag":"div","attrs":{"class":"arrow"},"event":"open"},{"text":"›"},{"tag":"div","event":"close"},{"tag":"div","attrs":{"class":"stage"},"event":"open"},{"tag":"div","attrs":{"class":"stage-label text-small"},"event":"open"},{"text":"Acceptance terminus"},{"tag":"div","event":"close"},{"tag":"strong","attrs":{"id":"p5-gate"},"event":"open"},{"tag":"strong","event":"close"},{"tag":"span","attrs":{"id":"p5-date"},"event":"open"},{"tag":"span","event":"close"},{"tag":"div","event":"close"},{"tag":"div","event":"close"},{"tag":"div","attrs":{"class":"card selected-detail"},"event":"open"},{"tag":"strong","attrs":{"id":"p5-ruling"},"event":"open"},{"tag":"strong","event":"close"},{"tag":"span","attrs":{"id":"p5-boundary"},"event":"open"},{"tag":"span","event":"close"},{"tag":"div","event":"close"},{"tag":"section","event":"close"},{"tag":"body","event":"close"},{"tag":"html","event":"close"}],"data_blocks":[{"name":"rows","document":1,"data":[{"short":"Argonne","program":"Genesis Supercomputing Center","state":"Market research / no solicitation","companies":"NVIDIA · Oracle · CoreWeave","position":"Named partners and plausible field positions","facility":"Argonne ALCF, Lemont","facilityState":"Operating capability site; final center configuration unresolved","gate":"Accepted energized capacity and workloads","date":"Next return: Aug. 27, 2026","ruling":"The field can be bounded, but bidders are not public.","boundary":"A DOE partnership is not an Argonne proposal or award."},{"short":"NNSA cloud","program":"Secret/Restricted Data Enterprise Cloud","state":"Operating AWS environment","companies":"Amazon Web Services","position":"Operating performer; alternatives not tasked publicly","facility":"Physical hosting environment withheld","facilityState":"Operating relationship / site topology undisclosed","gate":"Accepted sustained classified workloads","date":"Next return: Nov. 24, 2026","ruling":"Authorization is the choke point before raw capacity.","boundary":"Multi-cloud eligibility does not prove workload portability."},{"short":"NAPMP","program":"Advanced Packaging Manufacturing Program","state":"R&D awards / pilot-site join unresolved","companies":"Applied Materials · Amkor · Intel","position":"R&D awardee plus adjacent capacity candidates","facility":"NAPMP piloting site unresolved","facilityState":"Albany is the EUV accelerator, not yet the packaging-site answer","gate":"Qualified domestic package in a named system","date":"Next return: Oct. 31, 2026","ruling":"R&D, pilot and volume manufacturing are separate instruments.","boundary":"Do not draw a domestic chip supply chain without BOM and qualification evidence."},{"short":"FITT","program":"Flexible Innovative Transformer Technologies","state":"Parallel selected projects","companies":"Eaton · GE Vernova · EPRI · Resilient Power","position":"Independent R&D and demonstration awardees","facility":"Menomonee Falls · Schenectady","facilityState":"Named project locations / field acceptance pending","gate":"Utility-accepted representative hardware","date":"Next return: Oct. 31, 2026","ruling":"This is a portfolio, not a single transformer winner.","boundary":"Architectures and voltage classes are not interchangeable."},{"short":"DBPC","program":"Distributed Bioindustrial Production Capability","state":"Call closed / no public selection","companies":"eXoZymes · Lygos · Checkerspot · Industrial Microbes","position":"Discovery candidates only","facility":"Prototype site not public","facilityState":"Existing BioMADE sites do not prove an application","gate":"Repeatable production-representative defense run","date":"Next return: Oct. 31, 2026","ruling":"This is the cleanest open forward field.","boundary":"No candidate becomes an applicant until an official selection says so."},{"short":"QTIME","program":"AM Inspection and Qualification","state":"Five project teams selected","companies":"Honeywell · Northrop · RTX · ASTRO America","position":"Parallel R&D awardees","facility":"Distributed test locations unresolved","facilityState":"Teams known / test articles and acceptance sites not public","gate":"Qualified production-part inspection","date":"Next return: Oct. 31, 2026","ruling":"Transition-user and standards roles matter more than fame.","boundary":"Award lead does not equal completed NDI qualification."},{"short":"GPS IIIF","program":"GPS IIIF production and transition","state":"Active incumbent production","companies":"Lockheed Martin","position":"Production awardee","facility":"Denver / Littleton, Colorado","facilityState":"Verified production site","gate":"Operational service after on-orbit checkout","date":"Next return: Oct. 31, 2026","ruling":"This is an acceptance dossier, not an open competition.","boundary":"Core mate is not delivery, launch or checkout."},{"short":"SDN","program":"Space Data Network Backbone","state":"Funded SpaceX prototype order","companies":"SpaceX","position":"Prototype awardee; adjacent relays are not disclosed bidders","facility":"Satellite and gateway sites unresolved","facilityState":"Program release does not assign public work locations","gate":"Authorized operational warfighter traffic","date":"Next return: Nov. 18, 2026","ruling":"Vertical scale made SpaceX a strong field candidate.","boundary":"The applicant pool and government evaluation remain nonpublic."},{"short":"PTS","program":"Protected Tactical SATCOM modernization","state":"Production plus separate prototype paths","companies":"Viasat · Intelsat · Northrop · Astranis · Boeing","position":"Production awardees, prototype awardee and design pool","facility":"Integration and checkout sites unresolved","facilityState":"Company awards exact / sites not","gate":"Accepted protected service after launch","date":"Next return: Oct. 31, 2026","ruling":"The design pool is our strongest calibration case.","boundary":"Design, PTS-G production and PTS-P prototype clocks cannot merge."},{"short":"JLWS","program":"Joint Laser Weapon System","state":"Parallel prototype OTAs","companies":"nLIGHT · Lockheed Martin Aculight","position":"Confirmed prototype awardees","facility":"Longmont · Bothell","facilityState":"Capability sites / JLWS workshare not public","gate":"Sustained live-target result and production transition","date":"Next return: Oct. 31, 2026","ruling":"This is the sharpest current prototype race.","boundary":"Combined ceilings cannot be allocated by company."}]},{"name":"ids","document":1,"data":["program","state","companies","position","facility","facility-state","gate","date","ruling","boundary"]}],"named_views":[],"coverage":{"method":"Exact static document structure and safely parsed literal/JSON data; factual governed projection for mixed-lane legacy charts.","excluded":[],"unparsed_declaration_names":[],"rendered_equivalence":"Not certified. Layout, computed interaction state and visual geometry require on-screen review.","interpretation":"Source-authored thesis, examples and interpretation remain in their original labeled fields; not new evidence."}}
